TEKNIK
Volume 32, Nomor 2, Tahun 2011

PENGARUH PEMBEBASAN LAHAN TERHADAP RISIKO PROYEK KONSTRUKSI (STUDI KASUS SOCIAL ENGINEERING PROYEK JALAN TOL RUAS SEMARANG BAWEN)

Hermawan, Ferry (Unknown)
Kistiani, Frida (Unknown)
Djoko Santoso, Tanto (Unknown)



Article Info

Publish Date
02 Feb 2012

Abstract

Semarang-Solo toll road has strategic significance for the development of the national road network inparticular in Central Java and also for the development of road networks in the regional scale. At stage 1 is thesegment Semarang-Bawen along 23.1 km is divided into sections 1 Semarang-Ungaran along 14.1 km requireland acquisition area of 52.23 Ha and 7.8 km long in Semarang district with an area of land acquisition needs60.37 Ha. Although he was pursued through the vacant lands, but in reality also crossed the road infrastructureor splitting the existing environment. Land acquisition is a fundamental problem of construction project and it ispart of the risk of infrastructure procurement. Purely technical approach sometimes can not always solve theproblem to minimize the risk. So this condition is sometimes often be in the realm of social engineering.

Copyrights © 2011






Journal Info

Abbrev

teknik

Publisher

Subject

Engineering

Description

Journal yang mempublikasikan artikel-artikel ilmiah dari berbagai disiplin ilmu rekayasa/keteknikan. Artikel-artikel yang dipublikasikan di Jurnal TEKNIK meliputi hasil-hasil penelitian ilmiah asli (prioritas utama), artikel ulasan ilmiah yang bersifat baru (tidak prioritas), atau komentar atau ...