Utilization of empty fruit bunch (EFB) waste as a fuel for power electric generation is one of the options available for palm oil factory in the effort to reduce EFB waste. At the moment, there are several options to utilize EFB waste such as fertilization and composting. However, both ways show ineffective result, particularly in handling huge amount of EFB. Up to now, Indonesia only has a limited number of EFB fueled power plants. This paper explains technically and economically EFB fueled power plant supplying to PLN grid in Pinang Tinggi Palm Oil Factory located at Sei Bahar, Jambi Province. The economical feasibility is low, if the additional revenue generated from selling remnant oil, selling ash of EFB and selling credit carbon are not counted as an income. Using these additional revenues, the IRR project increased from 2.03% to 15.12%. The investment cost and the selling electricity price are critical sensitivity factors for project economics. 

Copyrights © 2011






Journal Info

Abbrev

mev

Publisher

Subject

Electrical & Electronics Engineering

Description

Mechatronics, Electrical Power, and Vehicular Technology (hence MEV) is a journal aims to be a leading peer-reviewed platform and an authoritative source of information. We publish original research papers, review articles and case studies focused on mechatronics, electrical power, and vehicular ...