Implementation of the construction project is very necessary for the existence of risk management. It is necessary to anticipate and handle risks in construction projects because of the project's construction one such risk of occupational health and safety (OHS). So the need for the identification, assessment, analysis to anticipate the risks involved. According to OHSAS (18001:2007), OHS is all the conditions and factors that affect, or may affect, on the health and safety of employees or other workers (including contract workers and personnel contractors, or others in the workplace). The purpose of this research is to know the risk factors and the risk of dominant and controlling risks in the project. The methods used in this research is a method of HAZID, HAZOP, and HIRA. The results obtained, there are 48 types of risk factors, 47 with the medium category, and 1 with a low category. There are five dominant risks and 12 risk controls. Implementation of the construction project is very necessary for the existence of risk management. It is necessary to anticipate and handle risks in construction projects because of the project's construction one such risk of occupational health and safety (OHS). So the need for the identification, assessment, analysis to anticipate the risks involved. According to OHSAS (18001:2007), OHS is all the conditions and factors that affect, or may affect, on the health and safety of employees or other workers (including contract workers and personnel contractors, or others in the workplace). The purpose of this research is to know the risk factors and the risk of dominant and controlling risks in the project. The methods used in this research is a method of HAZID, HAZOP, and HIRA. The results obtained, there are 48 types of risk factors, 47 with the medium category, and 1 with a low category. There are five dominant risks and 12 risk controls.
Copyrights © 2019