SPEKTRUM INDUSTRI
Vol 18, No 1: April 2020

MAKESPAN MINIMIZATION IN BATIK MURNI SMEs WITH PALMER, CAMPBELL DUKDEK SMITH, AND HEURISTIC POUR ALGORITHM

Wildanul Isnaini (Universitas PGRI Madiun)
Emylia Arghawaty (Universitas PGRI Madiun)
Zahrul Ashari (Universitas PGRI Madiun)



Article Info

Publish Date
01 May 2020

Abstract

Batik Murni is one of the Small and Medium Enterprises (SMEs) in Madiun Region that produces batik tulis and batik cap. However, the production of Batik Murni has not applied the exact method in production scheduling. This SMEs still uses intuition to make the production schedule. This condition can give disadventages for the SMEs, overstock and stockout will be happened. In this study, the researcher wants to offer a solution for the scheduling problems so Batik Murni can increase theri productivity performance. Researchers offer three production scheduling methods aimed at minimizing the makespan of Batik Tulis. The three methods used are Palmer, Champbell Dukdek Smith (CDS), and Heuristic Pour Algorithm. From this research, It can be concluded that the best production scheduling optimization at Batik Murni SMEs is obtained from the Palmer method. With makespan of 4837 minutes or 11 working days so the makespan can be minimized 54,2%.  In the order of the production process is batik sejuta bunga – batik batik turi tabur - batik seger arum - batik pecel.

Copyrights © 2020






Journal Info

Abbrev

Spektrum

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Spektrum Industri is a media published scientific articles in the science scope related to engineering and/or industrial management both research and theoretical. Literature review will be considered if it is written by an expert. Spektrum Industri is published by Universitas Ahmad Dahlan in twice ...