Jurnal Titra
Vol 2, No 1 (2014)

PENINGKATAN KAPASITAS PRODUKSI MELALUI PENGHITUNGAN WAKTU BAKU, TATA LETAK FASILITAS, SERTA PEMBERIAN KOMPENSASI DI PT SURYA PUTRA BARUTAMA

Wijaya, Chandra (Unknown)
Sutapa, Nyoman (Unknown)



Article Info

Publish Date
24 Jan 2014

Abstract

PT Surya Putra Barutama was not able to meet the market demand i.e. 500 units/month, since their production capacity was only 300 units/month. Therefore, to solve that problem we need to improve that capacity by calculating the standard time, production facility layouting, and calculating a new reward standard. At the end of this project, we found that, now the production capacity is 600 units/month.

Copyrights © 2014