Proceeding of World Conference
Vol. 3 No. 3 (2021): May 2021

Analysis of Boezem Kalidami Pump Capacity To Cope With Floods East Surabaya Region

R. Dandy Jurindra Pratama (Faculty of Engineering Civil Engineering Study Program Narotama University Surabaya)
Adi Prawito (Faculty of Engineering Civil Engineering Study Program Narotama University Surabaya)
Farida Hardaningrum (Faculty of Engineering Civil Engineering Study Program Narotama University Surabaya)



Article Info

Publish Date
31 May 2021

Abstract

Kalidami river has a length of 4.2 kilometers with a stretch of channels from the Airlangga, Manyar, Kertajaya, to Kejawan Putih Tambak areas. Boezem Kalidami is located at the downstream of the Kalidami river which is also equipped with a pump house and a water gate. The Log Pearson III method produces a design rainfall of 127.38 mm / 24 hours so that the rainfall is very heavy. So that it will produce a maximum flood discharge of 40.3 m³ / s and when compared to the capacity of Boezem Kalidami which is only 49,440 m³, Boezem Kalidami will fill very quickly. Coupled with the total efficient pump capacity of only 15.33 m³ / s, Boezem is only able to accommodate the first 2 hours and an overflow of 1.58 meters from Boezem Kalidami's riverside at 2.14.

Copyrights © 2021






Journal Info

Abbrev

prd

Publisher

Subject

Economics, Econometrics & Finance Education Engineering Mathematics Medicine & Pharmacology

Description

Proceeding of World Conference, is Publication of conference articles in the field of multidisciplinary sciences published by the World conference; aims to make it easier for readers and writers to access articles during time and make it easier to download and distribute. ...