Jurnal Teknik Industri
Vol. 10 No. 2 (2009): Agustus

Value Engineering dalam Pembangunan Rusunawa

Nyoman Dita Pahang Putra (Unknown)
M Mudjahidin (Unknown)



Article Info

Publish Date
20 Feb 2012

Abstract

Value engineering is done to make an effort to organize systematically and applying a technique that identifies the product function that aims to meet the required function with the lowest price. Analytical Hierarchy Process method is used in the analysis phase of work plan to choices alternative that is more objective based on several variables. In the chart of the breakdown cost model, 7 items of work have the highest cost, based on the work items was found 2 items of work that have the potential to do great engineering work that is the value of the walls and ceiling. The application of the results of value engineering on the walls, recommended the bricks, concrete stiffeners, stucco 1:4, paint walls, ceramic that savings of Rp 92,578,941 or 13.6% of the total cost of initial construction. In the same way, for the ceiling work that is recommended to change the calsiboard hollow iron frame with GRC framework furing metal so that savings of Rp40, 499,036 or 17.3% and ceiling aluminum grill on the bathroom with the calsiboard furing metal frame so that savings of Rp20,226,477 or 40%. Total savings that occur: Rp7,036,167,661 — Rp6,882,863,207 = Rp153,304,454 or 1.95% of total construction cost.

Copyrights © 2009






Journal Info

Abbrev

industri

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Industrial & Manufacturing Engineering

Description

Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality ...