JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)
Vol 6 No 1 (2022): April

Design the Back-Up Line of Power Supply Automatic Fireplace Building in Angkasapura II Bandung

Putri Mariana (University of Singaperbangsa Karawang)
Rahmat Hidayat (University of Singaperbangsa Karawang)



Article Info

Publish Date
26 Apr 2022

Abstract

Angkasapura II is a State-Owned Enterprise (BUMN) that serves air traffic travel using airplanes which cannot be separated from the need for electricity. Almost all services use electricity, without exception the PKP-PK Building or the fire fighting building. This is because this building has an integrated fire detector that is connected from every room throughout the Angkasapura II area directly with the PKP-PK Building or the fire department building. The problem is because the PKP-PK power source is still sourced from the TNI AU base and has not been sourced from PT Angkasa Pura II. It is feared that if the main source of PKP-PK electricity is interrupted, there will no longer be a backup power supply in the PKP-PK area. From the results of this study, a backup power supply line for the PKP-PK area was made from Angkasapura II, with this if the main electricity had problems, the area could operate smoothly because it had been backed up by the electricity supply from PLN and the Angkasapura II Genset. .

Copyrights © 2022






Journal Info

Abbrev

jeeeu

Publisher

Subject

Electrical & Electronics Engineering

Description

Aim: to facilitate scholar, researchers, and teachers for publishing the original articles of review articles. Scope: Electrical, Electronica, Telecomunication, Medical Electronica, Digital system, Control ...