Petro : Jurnal Ilmiah Teknik Perminyakan
Vol. 6 No. 3 (2017): OKTOBER

ANALISA PENYEBAB HILANG SIRKULASI LUMPUR PADA PEMBORAN SUMUR X LAPANGAN Y

Pradiko Pradiko.Z.H (Universitas Trisakti)
abdul hamid (universitas trisakti)
puri wijayanti (universitas trisakti)



Article Info

Publish Date
19 Apr 2019

Abstract

Lost circulation is one of the major problems in the drilling operation which can lead to not obtaining cutting, stuck pipe, and blow out. Therefore, lost circulation must be addressed because it has a high risk can increase the cpst and time during the drilling process. In general, there are several techniques that can be used to overcome the loss of circulation, one which is the use LCM (lost circulating material).In this thesis will investigate the loss circulation of drilling mud in the X well. The spud process in X well was started in March 2nd 2013, and reached total depth at 8950 ftMD. Drilling process has breakhtrough Lidah, Kawengan, Wonocolo, Ngrayong, and Tuban Karbonat formation and lost circulation was happen in Tuban Karbonat formation. Mud that used in this job was oil base mud and changed to KCL polymer when drilling into production zone.The cause of lost circulation taht occurs in X well because of the formation which has pores large of particle size, so that the mud flow into the formation and pressure in the hole is greater than the formation pressure. The controlling method which is used to handle the problem is using LCM which is Calsium Carbonate (CaCO3) and do Blind Drilling.

Copyrights © 2017






Journal Info

Abbrev

petro

Publisher

Subject

Earth & Planetary Sciences Economics, Econometrics & Finance Energy Engineering

Description

The PETRO Journal is all about the upstream oil and downstream oil and gas industry. Upstream studies focus on production technology, drilling technology, petrophysics, reservoir study, and eor study. Downstream technology focuses on the oil process, managing surface equipment, geothermal, and ...