NEUTRON : Research from all areas of the Civil Engineering
Vol 22 No 01 (2022): JULY 2022

Study of Agung Sleman Mosque Minaret Construction Design: Errors and Solutions

Ala Ali Qasem Alraimi (Departement of Civil Engineering, Narotama University Surabaya)
Muhammad Ikhsan Setiawan (Civil Engineering Departments, Faculty of Engineering, Narotama University Surabaya, Indonesia)
Adi Prawito (Civil Engineering Departments, Faculty of Engineering, Narotama University Surabaya, Indonesia)



Article Info

Publish Date
31 Jul 2022

Abstract

This study helps to solve the problem at the minaret of Agung Mosque which costs about (Rp16.000.000.000), located in Yogyakarta city, Indonesia, Sleman street, where its high sixty seven meters from the ground and it consists of fifty floors, where analyze and prove the safety of the minaret dome, replace the dome, repair the fallen parts from middle floors, and calculate the total cost of replacing the dome and repairing fallen parts of the minaret. This study proved that the existing design reinforcement of the dome is totally safe, estimated the total cost of solving the minaret problems which (Rp2, 281,873,633.54). Where the total costs of replacing the dome were (Rp2, 073,135,813), the total costs of fixing the damaged “fallen” parts of the middle floors were (Rp1, 294,762.24), and the total of the unexpected costs were (Rp207, 443,057.59)

Copyrights © 2022






Journal Info

Abbrev

neutron

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

s an open-access journal publishing original research from across all areas of the Civil Engineering We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer ...