Journal The Winners
Vol 6, No 2 (2005): The Winners Vol. 6 No. 2 2005

Perencanaan dan Pengendalian Proyek dengan Metode Pert - CPM Studi Kasus : Fly Over Ahmad Yani – Karawang

A, Anggara Hayun (Unknown)



Article Info

Publish Date
30 Sep 2005

Abstract

The efficiency and effectivity is not a new guide in this global era. As a professional and innovative company, like consultant construction company that always makes customer satisfy, has a good achievement and reputation. There fore, efficiency and affectivity are necessary needed in a company. Article gives some inputs how to manage time become more effective and efficient in finishing project with CPM method. With using CPM method in “fly over project Ahmad Yani-Karawang”, is figured out the optimal time to finish this project which is 184 days.Keywords: 

Copyrights © 2005