eProceedings of Engineering
Vol 6, No 2 (2019): Agustus 2019

Analisis Beban Kerja Mental Dan Perancangan Kebutuhan Jumlah Pegawai Menggunakan Metode Nasa-tlx Pada Divisi Human Resource Department Di Pt Pikiran Rakyat Bandung

Ovie Isnanda Irsa (Telkom University)
Christanto Triwibisono (Telkom University)
Fida Nirmala Nugraha (Telkom University)



Article Info

Publish Date
01 Aug 2019

Abstract

Abstrak - PT Pikiran Rakyat Bandung adalah perusahaan yang bergerak dalam bisnis media cetak. Pada divisi Human Resources Department (HRD) di PT Pikiran Rakyat , terjadi ketidak seimbangan beban kerja yang diakibatkan oleh perubahan strategi bisnis dan beban kerja yang tidak merata. Oleh karena hal tersebut dibutuhkan analisis beban kerja mental untuk menghitung jumlah karyawan ideal pada divisi tersebut. NASATLX merupakan salah satu metode yang dapat digunakan untuk menghitung beban kerja mental. Metode NASA-TLX membagi beban kerja menjadi 6 dimensi elemen kerja. Berdasarkan hasil analisis beban kerja menggunakan metode NASA-TLX didapatkan urutan beban kerja grup tertinggi hingga ke terendah yaitu: grup D (213,42) – grup B (133,53) – grup C – (117,37) – grup F (114,96) – grup E (77,92) – grup A (56,69). Jumlah karyawan HRD PT Pikiran Rakyat saat ini adalah 12 orang. Berdasarkan hasil perhitungan karyawan ideal, didapatkan bahwa dibutuhkan tambahan 2 orang karyawan tambahan yaitu 1 orang sebagai kepala urusan (grup B) dan 1 orang sebagai staf perencanaan dan pengembangan (grup E). Kata kunci : beban kerja, NASA-TLX, kebutuhan pegawai Abstract - PT Pikiran Rakyat Bandung is a company engaged in the print media business. In the Human Resources Department (HRD) division at PT Pikiran Rakyat, workload imbalances occur due to changes in business strategies and uneven workloads. Therefore, this requires an analysis of the mental workload to calculate the ideal number of employees in the division. NASA-TLX is a method that can be used to calculate mental workload. NASA-TLX method divides workload into 6 dimensions of work elements. Based on the results of the workload analysis using the NASA-TLX method, the highest to lowest group workload sequences are: group D (213.42) - group B (133.53) - group C - (117.37) - group F (114 , 96) - group E (77.92) - group A (56.69). The current number of HRD employees of PT Pikiran Rakyat is 12 people. Based on the calculation of ideal employees, it was found that additional 2 additional employees were needed, namely 1 person as head of affairs (group B) and 1 person as planning and development staff (group E). Keywords : workload, NASA-TLX , employee need

Copyrights © 2019






Journal Info

Abbrev

engineering

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Merupakan media publikasi karya ilmiah lulusan Universitas Telkom yang berisi tentang kajian teknik. Karya Tulis ilmiah yang diunggah akan melalui prosedur pemeriksaan (reviewer) dan approval pembimbing ...