eProceedings of Engineering
Vol 6, No 2 (2019): Agustus 2019

Identical Parallel Machine Scheduling Using Genetic Algorithm To Minimize Total Tardiness For Cnc 4 Axis In Pt Dirgantara Indonesia (persero)

Muflih Hafidz Danurhadi (Telkom University)
Dida Diah Damayanti (Telkom University)
Widia Juliani (Telkom University)



Article Info

Publish Date
01 Aug 2019

Abstract

Abstract in manufacturing operations, fulfilling the demand by the due dates is one way to keep customer satisfaction level. if the demand was delivered after the due dates, the tardiness penalty was occurred due to maintain the customer satisfaction level. scheduling was needed to reduce the tardiness that may occur in manufacturing operations. the production scheduling system in part fabrication is considered parallel machine scheduling due to several machine with same capabilities and characteristic. thus in order to get optimal solution to reduce tardiness, this research used genetic algorithm. keyword: parallel machine, scheduling, tardiness, genetic algorithm

Copyrights © 2019






Journal Info

Abbrev

engineering

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Engineering Industrial & Manufacturing Engineering

Description

Merupakan media publikasi karya ilmiah lulusan Universitas Telkom yang berisi tentang kajian teknik. Karya Tulis ilmiah yang diunggah akan melalui prosedur pemeriksaan (reviewer) dan approval pembimbing ...