Faktor Exacta
Vol 16, No 2 (2023)

Perencanaan Produksi Menggunakan Metode Algoritma Fuzzy Time Series Average – Based, Strategi Perencanaan Agregat dan Metode Transportasi

Sarah Julieta Simanjuntak (Universitas Indraprasta PGRI)
Drajat Indrajaya (Universitas Indraprasta PGRI)



Article Info

Publish Date
17 Jul 2023

Abstract

Companies often have difficulty determining the right amount of production to meet demand. This is due to fluctuations in consumer demand from time to time. Production planning is related to the future, therefore production planning needs to be prepared on the basis of estimates made based on past data using several assumptions. The Fuzzy Time Series Average-Based Algorithm is a forecasting method with a fairly good level of accuracy because it implements an average system that is able to determine the length of the effective interval. In addition, it is important to determine the right strategy to minimize costs. This research produces forecasts for the next 1 year. The Mean Absolute Percentage Error (MAPE) value is 10.6% and the results are classified as Good. For the Aggregate Planning Strategy for tire products with a Level strategy, a fee of IDR 28,952,251,200 is obtained. While the Chase strategy costs Rp. 5,437,770,000 and for the Mixed strategy, a fee of Rp. 28,945,051,200. Then the alternative method of transportation for permanent workers results in a cost of Rp. 21,575,275,000 while the alternative workforce changed by Rp. 25,613,475,000. Then the calculation of the aggregate planning strategy using the Chase strategy method is the best method that can be used to meet production demands by minimizing production costs.Companies often have difficulty determining the right amount of production to meet demand. This is due to fluctuations in consumer demand from time to time. Production planning is related to the future, therefore production planning needs to be prepared on the basis of estimates made based on past data using several assumptions. The Fuzzy Time Series Average-Based Algorithm is a forecasting method with a fairly good level of accuracy because it implements an average system that is able to determine the length of the effective interval. In addition, it is important to determine the right strategy to minimize costs. This research produces forecasts for the next 1 year. The Mean Absolute Percentage Error (MAPE) value is 10.6% and the results are classified as Good. For the Aggregate Planning Strategy for tire products with a Level strategy, a fee of IDR 28,952,251,200 is obtained. While the Chase strategy costs Rp. 5,437,770,000 and for the Mixed strategy, a fee of Rp. 28,945,051,200. Then the alternative method of transportation for permanent workers results in a cost of Rp. 21,575,275,000 while the alternative workforce changed by Rp. 25,613,475,000. Then the calculation of the aggregate planning strategy using the Chase strategy method is the best method that can be used to meet production demands by minimizing production costs.

Copyrights © 2023






Journal Info

Abbrev

Faktor_Exacta

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering Industrial & Manufacturing Engineering

Description

Faktor Exacta is a peer review journal in the field of informatics. This journal was published in March (March, June, September, December) by Institute for Research and Community Service, University of Indraprasta PGRI, Indonesia. All newspapers will be read blind. Accepted papers will be available ...