ANALISIS MANAJEMEN KONSTRUKSI PEMBANGUNAN RUMAH SAKIT PERMATA KOTA CIREBON

Andri Prabowo (Universitas Swadaya Gunung Djati Cirebon)
Suheryanto Suheryanto (Universitas Swadaya Gunung Djati Cirebon)
Saihul Anwar (Universitas Swadaya Gunung Djati Cirebon)



Article Info

Publish Date
19 Jul 2020

Abstract

ABSTRAKManajemen proyek merupakan proses terpadu dimana individu-individu sebagai bagian dari organisasi dilibatkan untuk memelihara, mengembangkan, mengendalikan, dan menjalankan program dengan menggunakan sumber daya terbatas secara efisien, efektif dan tepat waktu dalam menyelesaikan suatu proyek yang telah direncanakan, yang kesemuanya diarahkan pada sasaran yang telah ditetapkan dan berlangsung terus menerus seiring berjalannya waktu.Penelitian ini dilakukan untuk menganalisa Manajemen Konstruksi Perencanaan Pembangunan Rumah Sakit mulai dari Menghitung Volume, Rencana Anggaran Biaya, Metode Barchart, Kurva S dan menganalisa Critical Path Method. Tujuan dicapai melalui Studi Literatur, Pengumpulan data-data teknis, dan Peninjauan data berupa Gambar Bestek.Hasil Penelitian menunjukkan bahwa Rencana Anggaran Biaya yang dikeluarkan untuk Pembangunan Rumah Sakit 3 lantai sebesar Rp. 50.604.221.876,50. Kemudian dengan menggunakan Analisa Critical Path Method Penyelesaian Pekerjaan membutuhkan waktu selama 50 minggu. Kata kunci   : Manajemen Konstruksi, Volume, RAB, Barchart, Kurva S, dan Critical Path Method. ABSTRACTProject management is the process by which individuals are integrated as part of an organization involved to maintain, develop, control, and work the program by using limited resources in an efficient, effective and timely in completing a project that has been planned, all of which are directed at targets has established and continues over time.This study was conducted to analyze the Construction Management Development Planning office ranging from Calculates Volume, Budget Plan,Barchart Method, S Curve and Critical Path Method Analysis. The goal is achieved through Literature, Accumulation of technical data, and review of data in the form building design.Research shows that the Budget Plan issued for construction of a 3th floor in the amount of Rp. 50.604.221.876,50. Then by using Critical Path Method Analysis Completion takes as long as 50 weeks. Keyword : Construction Management, Volume, RAB, Barchart, S Curve, andCritical Path Method.

Copyrights © 2017






Journal Info

Abbrev

Konstruksi

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Jurnal Konstruksi dan Infrastruktur (JKI) merupakan kelanjutan dari Jurnal Konstruksi yang diterbitkan oleh Program Studi Teknik Sipil Fakultas Teknik Universitas Swadaya Gunung Djati Cirebon, Indonesia dengan p-issn 2085-8744. Tujuan penerbitan Jurnal Konstruksi dan Infrastruktur (JKI) adalah: (1) ...