Sustainable Civil Building Management and Engineering Journal
Vol. 1 No. 1 (2024): January

Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember

Merlita Eriyanti (Universitas Muhammadiyah Jember)
Totok Dwi Kuryanto (Universitas Muhammadiyah Jember)
Amri Gunasti (Universitas Muhammadiyah Jember)



Article Info

Publish Date
20 Jan 2024

Abstract

The rehabilitation of the D.I Sumber Nangka Irrigation Network takes 180 days or about 6 months to implement, with a budget of Rp. 4,077,964,693. In this study, the authors will analyze the data using the Earned Value method. Therefore, there is no shortage of research on the basic components of project work costs and the realization of completion of work in the field is not too late. The purpose of this research is to calculate the cost of BCWS, BCWP, and ACWP. The results of the D.I Sumber Nangka Irrigation Network Rehabilitation study, Kec. Ledokombo was completed in the 24th week with a total cost of Rp. 4,077,964,693. in the 1st week to the 24th week the fee used is Rp. 3,702,175,554.

Copyrights © 2024






Journal Info

Abbrev

civilengineering

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering

Description

Sustainable Civil Building Management and Engineering Journal is an academic journal organized which a focus and scope: Sustainable Building Design and Construction, Civil Engineering for Sustainability, Building Management and Maintenance, Environmental and Social Considerations. The scope of ...