Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
Vol. 2 No. 2 (2024): April: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sip

Analisis Faktor-Faktor Pekerjaan Proyek Prasarana Jalan Lingkungan Kelurahaan Sukma Jaya Kecematan Sukma Jaya Kota Depok

Wennas Alau (Universitas Tama Jakarsa)
Sempurna Bangun (Universitas Tama Jakarsa)
Kristina Sembiring (Universitas Tama Jakarsa)



Article Info

Publish Date
27 Feb 2024

Abstract

The factors that can affect the delay in the completion of road construction projects within the government of the Depok City Public Works Agency which are obtained from the analysis are poor material procurement; insufficient human resources; less than optimal contract management; procurement of construction equipment that is not managed; there is a request for changes to the work being done; financial problems; poor construction work monitoring and control; negative intervention from the community; slow decision making by the owner and changes in field conditions (weather, accidents, etc.). Based on the relative index method, the most influential factors are: 1. Unmanaged procurement of construction equipment 2. Changes in field conditions. Meanwhile, in the factor analysis method, it is obtained: Inadequate human resources (in the form of quantity and quality) less incompatible with the existing location of activities CCO (Contract Change Order) often occurs.

Copyrights © 2024






Journal Info

Abbrev

Konstruksi

Publisher

Subject

Chemical Engineering, Chemistry & Bioengineering Computer Science & IT Electrical & Electronics Engineering Engineering

Description

research journal of the Engineering Science Clump. The fields of study in this journal include the sub-groups of Civil Engineering and Spatial Planning, Industrial Engineering, Electrical and Computer Engineering, Earth and Marine ...