cover
Contact Name
Mohammad Adam Jerusalem
Contact Email
adam_jerusalem@uny.ac.id
Phone
+6281542562014
Journal Mail Official
jeatech@uny.ac.id
Editorial Address
2nd Floor, KPLT Building, Faculty of Engineering, Universitas Negeri Yogyakarta Karangmalang, Yogyakarta 55281, Indonesia
Location
Kab. sleman,
Daerah istimewa yogyakarta
INDONESIA
Journal of Engineering and Applied Technology
ISSN : 27162257     EISSN : 27162265     DOI : https://doi.org/10.21831/jeatech
Core Subject : Engineering,
Journal of Engineering and Applied Technology (JEATech) is an open-access double-blind peer-reviewed journal of Engineering, Technology, and Applied Technology. Authors are invited to disseminate theoretical and practice-oriented topics relevant to: Electrical Engineering Electronic Engineering Informatics engineering Computer Science Mechatronics Engineering Mechanical Engineering Automotive Engineering Civil Engineering Industrial Engineering Applied technology related to the previous fields of engineering
Articles 5 Documents
Search results for , issue "Vol 1, No 2 (2020): (August)" : 5 Documents clear
Scheduling design of Jakarta-Cikampek II elevated toll road project (P.186 – P.187) Abdul Khalim; Harun Usman Ghifarsyam; Nikko Rozy; Faqih Ma’arif
Journal of Engineering and Applied Technology Vol 1, No 2 (2020): (August)
Publisher : Faculty of Engineering, Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/jeatech.v1i2.34957

Abstract

The key to achieving effective and efficient development goals is by increasing the quality of construction management by collecting up-to-date data about the project's resources, mainly about productivity. In this research space, productivity will be discussed, including human resources and their management. The case study is the project of Jakarta-Cikampek II Elevated Toll Road. This project was a developing project to improve the capacity of the existing Jakarta-Cikampek toll road. This elevated structure will be built right in the area (median and side edge) of the existing toll road, making it interesting to discuss how the construction is carried out. Scheduling analysis in this study was carried out at points P.186 to P.187 of the construction project. The analysis includes identifying the productivity index of labor resources and equipment that has a major role in shaping the scheduling concept. The concept will be performed by determining a network diagram that will use the Critical Path Method (CPM) rule. The data used in this analysis are construction drawing, s-curve plan, worker data, weekly job plan, work method, and some interviews with worker and field project manager. These results obtained the large productivity of workers and equipment, and the duration required to complete the construction starting prom point P.186 to P.187 is 248 working days
Simulation of school business process Usman Jeylani; Muhammad Falihul Isbah; Muhammad Ainul Yaqin; Pinkan Veri Diana E
Journal of Engineering and Applied Technology Vol 1, No 2 (2020): (August)
Publisher : Faculty of Engineering, Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/jeatech.v1i2.28313

Abstract

School is an institution where people learn reading, writing, and learning to have good character. The school has a social interaction system in an organizational relationship. Every institution must have a business process to achieve its vision and mission. The business process has activities carried out to provide services or products. This study analyzes business process systems in schools by designing school business process simulation scenarios and then implementing the design of AnyLogic Software and it can contribute to optimizing the management of business processes within schools, where processes are more structured and systematic. The method used in this study is the Business Process Improvement (BPI) Method to eliminate errors and provide competitive benefits by improving business processes. In applying the BPI method, the results obtained are recommendations for improving school business processes: (1) Adding Buses to schools, (2) Adding School Cooperative Staff to transport goods, and (3) Adding Cashiers in School Cooperatives.
Lean distribution to minimize waste of time in the stripping process at PT. Pelabuhan Indonesia IV Ambon Branch Daniel Bunga Paillin; B.J. Camerling; Cristin Nasarany
Journal of Engineering and Applied Technology Vol 1, No 2 (2020): (August)
Publisher : Faculty of Engineering, Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/jeatech.v1i2.35091

Abstract

Stripping process at PT. Port Indonesia IV (Persero) Ambon Branch plays a very important role for expeditions to receive goods from outside its area to meet market needs. However, in the process of distributing containers to stripping blocks, there is a delay in delivery thus it does not reach the target as a result of waste. Based on the data, it is identified that the total lead time of the stripping process is 3,670 minutes which has a non-value-added activity of 3,090 minutes. It is still found delay that causes the waste so that it needs improvement by minimizing the waste. The purpose of this study is to calculate the efficiency of identified wastes and the total activity of the initial time and time after improvement. Data analysis tools used lean distribution conducted by field observations, interviews, questionnaires, and documentation with data processing techniques in the form of big picture mapping, waste identification, value stream analysis tools (VALSAT), process activity mapping, fishbone diagrams, 5W+1H methods, as well as calculating the efficiency of the improvement time. The result of this study showed that there are four wastes of seven wastes identified namely waste of transportation, waste on unnecessary inventory, waste of defects, and waste of waiting time. Waste of waiting time is a critical waste with a percentage of 29.8% based on the results of questionnaires with the causative factors namely careless parking, not paying attention to stock/targets, limited places, indiscipline, and negligence. After the improvement by minimizing waste, the lead time is 1,550 minutes with a total efficiency of activities of 42%. 
Hybrid method integrating SQL-IF and Naïve Bayes for SQL injection attack avoidance Faisal Yudo Hernawan; Indra Hidayatulloh; Ipam Fuaddina Adam
Journal of Engineering and Applied Technology Vol 1, No 2 (2020): (August)
Publisher : Faculty of Engineering, Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/jeatech.v1i2.35497

Abstract

Web applications are the objects most targeted by attackers. The technique most often used to attack web applications is SQL injection. This attack is categorized as dangerous because it can be used to illegally retrieve, modify, delete data, and even take over databases and web applications. To prevent SQL injection attacks from being executed by the database, a system that can identify attack patterns and can learn to detect new patterns from various attack patterns that have occurred is required. This study aims to build a system that acts as a proxy to prevent SQL injection attacks using the Hybrid Method which is a combination of SQL Injection Free Secure (SQL-IF) and Naïve Bayes methods. Tests were carried out to determine the level of accuracy, the effect of constants (K) on SQL-IF, and the number of datasets on Naïve Bayes on the accuracy and efficiency (average load time) of web pages. The test results showed that the Hybrid Method can improve the accuracy of SQL injection attack prevention. Smaller K values and larger dataset will produce better accuracy. The Hybrid Method produces a longer average web page load time than using only the SQL-IF or Naïve Bayes methods.
The performance of stability test using Bantak aggregate and AC50/70 as polymer on Marshall characteristic Tino Putro Pangestu; Wasiu Akande Ahmad; Adi Setiabudi Bawono; Mohamad Aqifd
Journal of Engineering and Applied Technology Vol 1, No 2 (2020): (August)
Publisher : Faculty of Engineering, Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21831/jeatech.v1i2.39232

Abstract

This study aims to determine Marshall's characteristics using asphalt binder modified polymer AC 50/70 (Starbit E-55) using local Bantak material. The test method used is a hot mix asphalt (Hot Mix) with the Marshall method. The asphalt content used was 5% successively; 5.5%; 6%; 6.5%; and 7% consisting of 3 specimens for each variant. The research was carried out at the Material Laboratory of the Department of Civil Engineering and Planning, Faculty of Engineering, Yogyakarta State University. The results of the Marshall characteristic performance test at the Optimum Asphalt Level (KAO) 6.5% are as follows: Marshall stability mean value is 1197.6 kg, Density mean value is 2.34 gr/cc, the mean value of melt (Flow) is 3, 1 mm, the mean value of VIM (Void in Mix) was 4.83%, the mean value of VMA (Void in Mineral Aggregate) was 13.40%, the mean value of VFB (Void Filled Bitumen) was 60.61%, and the mean value of MQ (Marshall Quotient) 391.08 kg/mm.

Page 1 of 1 | Total Record : 5