cover
Contact Name
Unang arifin
Contact Email
bcsme@unisba.ac.id
Phone
+6282120524105
Journal Mail Official
bcsme@unisba.ac.id
Editorial Address
UPT Publikasi Ilmiah, Universitas Islam Bandung. Jl. Tamansari No. 20, Bandung 40116, Indonesia, Tlp +62 22 420 3368, +62 22 426 3895 ext. 6891
Location
Kota bandung,
Jawa barat
INDONESIA
Bandung Conference Series: Mining Engineering
ISSN : -     EISSN : 28282140     DOI : https://doi.org/10.29313/bcsme.v2i2
Bandung Conference Series: Mining Engineering (BCSME) menerbitkan artikel penelitian akademik tentang kajian teoritis dan terapan serta berfokus pada Teknik Pertambangan dengan ruang lingkup Analisis sensitivitas Net Present Value (NPV), Anggaran Biaya Crushing Plant, API 5L Grade B, Belt Conveyor, BESR II, Crude Oil, Crushing plant, Dimensi Paritan, Discounted Cash Flow (DCF), Dump Truck, Economic SR, Efisiensi Kerja Cassiterite, Gas, Korosi, Hopper, Internal Rate of Return (IRR), Kapasitas Sump Jalan Angkut, Lifetime Biaya Produksi, Loosematerials, Payback Periode (PBP), Pemompaan, Peringkat Batubara, Pipa Baja Karbon, Crude Oil, Pipa Baja, Pipa Transportasi, Pit Design BWE, Productin Rate Index Crushing Plant, Produktivitas Debit Air, Rencana Reklamasi, Roller, Sisa Umur Pakai Pipa Baja Karbon, Sisa Umur Pakai Pipa Reflektan Vitrinit, Sisa Umur Pakai, Sistem Dewatering, Target Ban, KPH, TUR, Variable Crushing Plan. Prosiding ini diterbitkan oleh UPT Publikasi Unisba. Artikel yang dikirimkan ke prosiding ini akan diproses secara online dan menggunakan double blind review minimal oleh dua orang mitra bebestari.
Articles 5 Documents
Search results for , issue "Vol. 1 No. 1 (2021): Bandung Conference Series: Mining Engineering" : 5 Documents clear
Perancangan Tambang (Pit Design) dan Pentahapan Tambang Batubara Pit Blok 3 dengan Stripping Ratio 7 : 1 di PT XYZ, Desa Lubuk Sini, Kecamatan Taba Penanjung, Kabupaten Bengkulu Tengah, Provinsi Bengkulu Ahmad Khairul
Bandung Conference Series: Mining Engineering Vol. 1 No. 1 (2021): Bandung Conference Series: Mining Engineering
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (201.611 KB) | DOI: 10.29313/bcsme.v1i1.68

Abstract

Abstract. The research was conducted at PT XYZ located in District of Taba Penanjung, Central Bengkulu Regency, Bengkulu Province. The purpose of this study, to make the pit design with economical SR, determines the mined reserves and mine life in the study area. The result of coal resource estimation from modeling result is 36.634.596 ton. The parameters needed to design Pit Block 3 are, among others, geometry of mining slope, pit limit, mine road, and economical stripping ratio (stripping ratio). Based on the calculation of BESR II (Break Even Stripping Ratio) and economical SR calculation at PT XYZ, it is found that the economic potential limits of stripping ratio is 1: 7. Therefore Pit Block 3 is designed in the center of IUP PT XYZ with depth Maximum Pit 79 meters and total open area of Block 3 pit 3 of 113 Ha with SR design <7. Based on the design optimization, the coal reserve in Pit Block 3 PT XYZ is 4,822,411 tons with an overburden volume of 34,097,854 BCM. The production target of PT XYZ per month is 57,990 ton / month and with SR 1: 7 it is necessary to peel overburden 405,927 bcm / month. So get the age of pit block 3 is for 6 years 11 months ≈ 7 years. Where for annual mine sterling total reserves of mined amounted to 695,875 tons of coal and 4,871,122 bcm overburden. Abstrak. Penelitian dilakukan di PT XYZ yang berada di Kecamatan Taba Penanjung, Kabupaten Bengkulu Tengah, Provinsi Bengkulu. Tujuan dari penelitian ini, untuk membuat rancangan pit dengan SR ekonomis, menentukan cadangan tertambang dan umur tambang di daerah penelitian. Hasil estimasi sumberdaya batubara dari hasil pemodelan sebesar 36.634.596 ton. Adapun parameter yang diperlukan untuk merancang Pit Blok 3 tersebut, diantaranya geometri lereng tambang, batas penambangan (pit limit), jalan tambang, dan nisbah kupas (stripping ratio) yang ekonomis. Berdasarkan hasil perhitungan BESR II (Break Even Stripping Ratio) dan perhitungan SR Ekonomis di PT XYZ diperoleh batas potensial ekonomis nisbah kupas yaitu 1 : 7. Oleh karena itu Pit Blok 3 yang dirancang berlokasi di bagian tengah IUP PT XYZ dengan kedalaman maksimal Pit 79 meter dan luas bukaan keseluruhan pit Blok 3 sebesar 113 Ha dengan SR desain <7. Berdasarkan optimasi desain, maka didapat cadangan batubara pada Pit Blok 3 PT XYZ adalah 4.822.411 ton dengan volume overburden 34.097.854 BCM. Target produksi PT XYZ per bulannya adalah sebesar 57.990 ton/bulan dan dengan SR 1:7 maka perlu mengupas overburden sebanyak 405.927 bcm/ bulan. Sehingga didapat umur pit blok 3 ini selama 6 tahun 11 bulan ≈ 7 tahun. Dimana untuk pentahapan tambang pertahun total cadangan tertambang adalah sebesar 695.875 ton batubara dan 4.871.122 bcm overburden.
Pengaruh Suhu terhadap Nilai Analisis Proksimat pada Proses Karbonisasi Batubara untuk Carbon Riser di PT. XYZ, Kota Samarinda, Provinsi Kalimantan Timur Guruh Tiedie Putra Prawira
Bandung Conference Series: Mining Engineering Vol. 1 No. 1 (2021): Bandung Conference Series: Mining Engineering
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (377.068 KB) | DOI: 10.29313/bcsme.v1i1.70

Abstract

Abstract. Carbonriser or carbon riser is a material that serves to increase hardness in the iron and steel smelting process industry. This material is formed from compounds that have high carbon conditions. The main carbon material used as raw material for the carbonriser is green coke or petroleum coke. Green coke is a carbon residue obtained from the refining of heavier petroleum, in addition to green coke the carbon material that is widely used for carbonrisers is anthrachite coal. The increase in the value of solid carbon or fixed carbon is carried out through the carbonization process, carbonization is the process of converting organic material into carbon or carbon residue through the pyrolysis process. Pyrolysis is the thermal decomposition or decomposition of organic matter through a heating process with no or little oxygen, where the organic material will undergo a chemical structure breakdown into gas. Decomposition in limited air conditions, compounds that are easily lost (volatile) will become gases, so that the volatile matter content decreases and the FC content increases. The increase in FC value is also influenced by the reduced water content. There are several tests carried out to determine the quality of coal including proximate analysis (Inherent Moisture, Ash, Volatile Matter, Fixed Carbon and total sulfur. From the test results obtained the average value of the sample inherent moisture 3.61%, ash 8.9%, volatile matter 8.2%, fixed carbon 79.27% ​​and total sulfur 0.2%, for coal at a temperature of 800-830 Inherent moisture 3.7%, ash 7.8%, volatile matter 9.3%, fixed carbon 79.09%, total sulfur 0.2%, for coal at heating process temperature 831-860. Inherent moisture 3.77%, ash 8.08%, volatile matter 8.8%, fixed carbon 79.3%, total sulfur 0.21%, for coal at heating temperature 861-890. Inherent moisture 3.4%, ash 8.2 % … Abstrak. Carbonriser atau carbon riser adalah material yang berfungsi untuk meningkatkan kekerasan pada industri proses peleburan besi dan baja. Material ini terbentuk dari senyawa yang memiliki kondisi karbon tinggi. Material karbon utama yang digunakan sebagai bahan baku carbonriser yaitu green coke atau petroleum coke. Green coke adalah residu karbon yang diperoleh dari penyulingan minyak bumi yang lebih berat, selain green coke material karbon yang banyak digunakan untuk karbonriser adalah batubara antrachite. Peningkatan nilai karbon padat atau fix carbon dilakukan melalui proses karbonisasi, karbonisasi merupakan proses konversi material organik menjadi karbon atau residu karbon melalui proses pirolisis. Pirolosis adalah penguraian atau dekomposisi termal bahan organic melalui proses pemanasan tanapa atau sedikit oksigen,dimana material organic akan mengalami pemecahan struktur kimia menjadi gas. Dekomposisi pada kondisi udara terbatas, senyawa yang mudah hilang (zat terbang) akan menjadi gas, sehingga kadar zat terbang berkurang dan kadar FC akan meningkat. Peningkatan nilai FC juga dipengaruhi oleh berkurangnya kadar air. Ada beberapa pengujian yang dilakukan untuk mengetahui kualitas batubara diantaranya analisis proksimat (Inherent Moisture, Ash, Volatile Matter, Fixed Carbon dan total sulfur. Dari hasil pengujian didapat nilai rata-rata sampel inherent moisture 3.61%, ash 8.9%, volatile matter 8.2%, fixed carbon 79.27% dan total sulfur 0,2%, untuk batubara pada proses pemanasan suhu 800-830 Inherent moisture 3.7%, ash 7.8%, volatile matter 9.3%, fixed carbon 79.09%, total sulfur 0,2%, untuk batubara pada proses pemanasan suhu 831-860. Inherent moisture 3.77%, ash 8.08%, volatile matter 8.8%, fixed carbon 79.3%, total sulfur 0,21%,untuk batubara pada proses pemanasan suhu 861-890 . Inherent moisture 3.4%, ash 8.2%, …
Kajian Teknis Produktivitas Alat Gali-Muat dan Alat Angkut terhadap Pencapaian Target Produksi 33.792 LCM per Bulan pada Kegiatan Penambangan Andesit di PT XYZ Kecamatan Bojonegara, Kabupaten Serang, Provinsi Banten Indra Anugrah Sidki
Bandung Conference Series: Mining Engineering Vol. 1 No. 1 (2021): Bandung Conference Series: Mining Engineering
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (256.52 KB) | DOI: 10.29313/bcsme.v1i1.71

Abstract

Abstract. PT XYZ is a manufacturing industry company that has a mine located in the bojonegara sub-district, Serang district, which has a production operation IUP covering an area of 30 ha. The activity is carried out using the open pit mining method (quarry) with a production target of 33,792 LCM/month or 1,251.56 LCM/day by operating 2 excavators Komatsu PC-200 with a capacity of 0.9 LCM and 9 Hino Ranger FG 235 conveyances. JJ capacity 16 LCM. Several technical factors that can affect the achievement of production targets include work efficiency, circulation time and filling factor. So it is necessary to conduct a technical study to achieve the production target. Based on the results of the study, the productivity of 2 theoretical digging and loading equipment was 28,481.85 LCM/month, while the productivity of the conveyance in the condition of shedding material at Hopper was 7,973.50 LCM/month and the productivity of the conveyance in shedding conditions in Stock Raw was 20,398.68 LCM/month, then the total production of transportation equipment is 28,372.18 LCM/month. To achieve productivity, a technical study of improvements to the haul road geometry is carried out to estimate the reduction in cycle time. Where the circulation time of the conveyance is the shedding condition at Hopper from 41.97 minutes to 28.48 minutes and the shedding condition in Stock Raw from 37.86 minutes to 24.18 minutes. Then the productivity of the theoretical conveyance for shedding conditions at Hopper is 11,695.33 LCM/month and for shedding conditions in Stock Raw is 31,914.69 LCM/month, so the total is 43,610.02 LCM/month, so that the company's target can be achieved. Abstrak. PT XYZ adalah perusahaan industri manufaktur yang memiliki tambang berlokasi di kecamatan bojonegara, kabupaten Serang memiliki IUP opersi produksi seluas 30 Ha. Kegiatan dilakukan dengan menggunakan metode tambang terbuka (quarry) dengan target produksi sebesar 33.792 LCM/bulan atau 1.251,56 LCM/hari dengan mengoperasikan 2 alat gali-muat Excavator Komatsu PC-200 kapasitas 0,9 LCM dan 9 alat angkut Hino Ranger FG 235 JJ kapasitas 16 LCM. Beberapa faktor teknis yang dapat mempengaruhi tercapainya target produksi diantaranya efisiensi kerja, waktu edar dan faktor pengisian. Maka perlu dilakukan kajian teknis untuk mencapai target produksi. Berdasarkan hasil penelitian didapatkan produktivitas dari 2 alat gali-muat teoritis sebesar 28.481,85 LCM/bulan, sedangkan produktivitas alat angkut kondisi penumpahan material di Hopper sebesar 7.973,50 LCM/bulan dan produktivitas alat angkut kondisi penumpahan di Stock Raw 20,398.68 LCM/ bulan, maka total produksi alat angkut sebesar 28.372,18 LCM/bulan. Untuk mencapai produktivitas, maka dilakukan kajian teknis perbaikan terhadap geometri jalan angkut untuk mengestimasikan pengurangan waktu edar. Dimana waktu edar alat angkut kondisi penumpahan di Hopper dari 41,97 menit menjadi 28,48 menit dan kondisi penumpahan di Stock Raw dari 37,86 menit menjadi 24,18 menit. Maka didapatkan produktivitas alat angkut teoritis untuk kondisi penumpahan di Hopper sebesar 11.695,33 LCM/bulan dan kondisi penumpahan di Stock Raw sebesar 31.914,69 LCM/bulan, maka total sebesar 43.610,02 LCM/bulan, sehingga target perusahaan dapat tercapai.
Aplikasi Metode Pengindraan Jauh (Remote Sensing) untuk Identifikasi Keterdapatan Potensi Bahan Galian Pasir Kuarsa di Desa Kotawaringin, Kecamatan Puding Besar, Bangka Belitung Muhamad Rijaludin
Bandung Conference Series: Mining Engineering Vol. 1 No. 1 (2021): Bandung Conference Series: Mining Engineering
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (613.341 KB) | DOI: 10.29313/bcsme.v1i1.72

Abstract

Abstract. Quartz sand is a type of sand that basically comes from erosion or erosion of rocks and other natural objects, both because of water and air. Quartz sand is usually used as a material for making glass, making ceramics, and a mixture of construction materials. For preliminary exploration, it can now be supported by a method that is remote sensing technology. This method aims to determine the zone or area that has an excavation of minerals based on certain parameters. Initial data used in the form of images from Landsat 8 OLI / TIRS. The main data for the application of remote sensing are Landsat 8 images, and SRTM DEM radar images. The data is then processed using the help of ArcMap Version 10.3 and Global Mapper Version 17.0 so that areas with potential quartz sand deposits can be identified.The results of the data processing are then used as a basic reference to determine areas that have deposited quartz sand from formation information based on hue / color and surface relief.Based on these aspects of the formation, then the correlation between the formation based on hue / color and formation based on relief. So that there can be identified areas with potential for quartz sand based on hue / color. Abstrak. Pasir kuarsa merupakan salah satu jenis pasir yang pada dasarnya berasal dari erosi atau pengikisan dari batuan dan benda alam lainnya, baik karena air maupun udara. Biasanya pasir kuarsa dimanfaatkan sebagai bahan pembuatan kaca, pembuatan keramik, dan bahan campuran kontruksi. Untuk eksplorasi pendahuluan, kini dapat ditunjang dengan suatu metode yaitu teknologi penginderaan jauh (Remote Sensing). metode ini bertujuan untuk menentukan zona atau daerah yang memiliki suatu keterdapatan bahan galian berdasarkan parameter tertentu. Data awal yang digunakan berupa citra dari landsat 8 OLI/TIRS. Data utama untuk penerapan remote sensing yaitu citra landsat 8 OLI/TIRS, dan citra radar DEM SRTM. Data tersebut kemudian diolah menggunakan bantuan software ArcMap Versi 10.3 dan Global Mapper Versi 17.0 sehingga dapat diidentifikasi daerah yang berpotensi terdapat endapan pasir kuarsa. Hasil dari pengolahan data tersebut lalu digunakan sebagai acuan dasar untuk menentukan daerah yang memiliki keterdapan endapan pasir kuarsa dari informasi formasi berdasarkan rona/warna dan relief permukaan. Berdasarkan aspek formasi tersebut, kemudian dilakukan korelasi antara formasi berdasarkan rona/warna dan formasi berdasarkan relief. Sehingga dapat diidentifikasi adanya daerah yang berpotensi terdapat endapan pasir kuarsa berdasarkan rona/warna.
Optimalisasi Alat Crushing Plant untuk Memenuhi Target Produksi Batuan Andesit di PT XYZ Desa Lagadar, Kecamatan Margaasih, Kabupaten Bandung, Provinsi Jawa Barat M Al Arief Mufthian
Bandung Conference Series: Mining Engineering Vol. 1 No. 1 (2021): Bandung Conference Series: Mining Engineering
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (249.084 KB) | DOI: 10.29313/bcsme.v1i1.73

Abstract

Abstract. Along with the rapid pace of development that is being carried out, the need for andesite rock in Indonesia is increasing. To meet these needs, it is necessary to carry out a comminution process or size reduction after mining activities are carried out. This size reduction is a process carried out to get the results in the form of split stones that will be used to meet market needs. And the process of reducing this size is done by using a rock crusher (crusher). PT. XYZ itself has 2 units of Crushing Plant to achieve the set production target of 15,420 tons/month. However, the production capacity of these 2 crushing plant units has not been able to meet the production target desired by the company. According to (B.A Wills, 1980:232) the size of the product resulting from the crushing of the cone crusher is influenced by the Close Side Setting (CSS) setting on the cone crusher. The larger the CSS size, the larger the percentage of product size produced, and the production capacity will also be large. If the CSS size is reduced, the percentage of product size produced is also smaller, and the product capacity will also be small. Therefore, an experiment was carried out in changing the CSS size, which had an initial size of 20mm, to 30mm so that the production target increased by 37% and reached 15,455.41 tons/month. Apart from that, after the experiment was carried out on setting the CSS size, the performance of the Secondary Crusher tool was getting better, so that the obstacles that often occurred before the experiment were carried out were reduced after the CSS size change was made. The amount of time that was reduced due to a change in the size of the CSS in the Secondary Crusher was from 2.60 hours/day to 0.83 hours/day. From the results of these experiments, the performance efficiency of the… Abstrak. Seiring dengan pesatnya laju pembangunan yang sedang dilaksanakan kebutuhan akan batuan andesit di Indonesia semakin meningkat Untuk memenuhi kebutuhan tersebut, maka perlu dilakukannya proses kominusi atau pengecilan ukuran setelah kegiatan penambangan dilakukan. Pengecilan ukuran ini merupakan proses yang dilakukan untuk mendapatkan hasil berupa batu split yang akan digunakan untuk memenuhi kebutuhan pasar. Dan proses pengecilan ukuran ini dilakukan dengan menggunakan alat peremuk batuan (crusher). PT. XYZ sendiri memiliki 2 unit Crushing Plant untuk pencapaian target produksi yang telah ditetapkan yaitu sebesar 15.420 ton/bulan. Namun kapasitas produksi dari 2 unit crushing plant ini belum dapat memenuhi target produksi yang diinginkan oleh perusahaan. Menurut (B.A Wills, 1980:232) ukuran produk hasil peremukan cone crusher dipengaruhi oleh pengaturan Close Side Setting (CSS) pada cone crusher. Semakin besar ukuran CSS maka persentase ukuran produk yang dihasilkan lebih besar, dan kapasitas produksi juga akan besar. Apabila ukuran CSS dikecilkan maka persentase ukuran produk yang dihasilkan juga lebih kecil, dan kapasitas produk juga akan kecil. Maka dari itu dilakukannya percobaan dalam mengubah ukuran CSS yang memiliki ukuran awal sebesar 20mm, menjadi 30mm sehingga target produksi mengalami peningkatan sebesar 37% dan mecapai 15.455,41 ton/bulan. Selain dari itu setelah dilakukannya percobaan pada pengaturan ukuran CSS, kinerja dari alat Secondary Crusher semakin membaik, sehingga hambatan-hambatan yang sering terjadi pada saat sebelum percobaan dilakukan semakin berkurang setelah dilakukannya perubahan ukuran CSS. Adapun besaran waktu yang berkurang akibat adanya perubahan ukuran CSS pada Secondary Crusher yaitu yang asalnya 2,60 jam/hari menjadi 0,83 jam/hari. Dari hasil percobaan tersebut efisiensi kinerja pada alat …

Page 1 of 1 | Total Record : 5