cover
Contact Name
Ujang Wiharja
Contact Email
ujangwiharja@unkris.ac.id
Phone
+628128004064
Journal Mail Official
ujangwiharja@unkris.ac.id
Editorial Address
Jl. Kampus Unkris RT. 01 RW. 05 No. 34, Jaticempaka, Pondok Gede, Kota Bks RT 003 4, RT.009/RW.005, Jatiwaringin, Kec. Pondok Gede, Kota Bekasi, Jawa Barat 17411
Location
Kota bekasi,
Jawa barat
INDONESIA
Teknokris
ISSN : 14110539     EISSN : 26228300     DOI : -
Karya Ilmiah untuk mahasiswa dan dosen pada bidang Teknik Mesin, Teknik Elektro, Teknik Industri, Teknik Informatika, Teknik Sipil, Perencanaan Wilayah dan Kota, Arsitektur dan Sistem Informasi terbit setahun dua kali, setiap Juni dan Desember
Articles 5 Documents
Search results for , issue "Vol 25 No 2 (2022): Jurnal Teknokris Edisi Desember" : 5 Documents clear
ANALISIS KINERJA JARINGAN LAN MENGGUNAKAN METODE QUALITY OF SERVICE (QOS) (Studi Kasus : PT. Transportasi Gas Indonesia Di Jambi) sudrajat sudrajat; Mega Wahyu Ramadhani
TEKNOKRIS Vol 25 No 2 (2022): Jurnal Teknokris Edisi Desember
Publisher : Fakultas Teknik Unkris Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Transportation Gas Indonesia is a company engaged in the oil and gas, specialy as a natural gas distributor. In operasionality has some fairly complex gas field. In some of the gas field using a network of Wireless Local Area Network (WLAN). To find out how much the performance (performance) PT.Transportasi Gas network in Indonesia, it should be an examination and analysis of network performance with base on quality of service (QoS). QoS is the ability to assure delivery of network data flow or a set of criteria that determine the level of satisfaction capability of using a jaringan.Parameter QoS is composed of bandwidth, delay and packet loss.
IMPLEMENTASI SISTEM PAKAR UNTUK MENDIAGNOSA PENYAKIT GIGI MENGGUNAKAN METODE TEOREMA BAYES Fadhila Anggraini; Nur Hikmah; herry wahyono
TEKNOKRIS Vol 25 No 2 (2022): Jurnal Teknokris Edisi Desember
Publisher : Fakultas Teknik Unkris Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Teeth are one of the most vital organs of the human body, therefore maintaining dental health is very important. The reason why people only do dental check-ups when their teeth are sick and the lack of public awareness of themselves about dental health and the long queues that cause crowds at the dental clinic are the reasons why people are reluctant to come to the dental clinic during the pandemic which is still in existence in Indonesia. Therefore we need a system to facilitate both the handling and prevention of early symptoms of dental disease that can be done online. The method used in this study is the Bayes theorem method, where this method can calculate how often the symptoms appear. The results of the research on the implementation of an expert system for diagnosing dental disease is a website-based application that can help identify dental diseases with a percentage of 80%
ANALISIS PERBANDINGAN ALGORITMA C4.5 DAN ID3 UNTUK FAKTOR KEPUASAN KONSUMEN WARUNG ICHA STEAK & SEAFOOD Muhammad Farhan Arief; Herry wahyono; Nuke Chusna
TEKNOKRIS Vol 25 No 2 (2022): Jurnal Teknokris Edisi Desember
Publisher : Fakultas Teknik Unkris Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Warung Icha Steak & Seafood is an MSME type food stall business that focuses on the culinary field that sells food in the form of steak and processed food from the sea. Efforts to retain consumers are certainly not an easy thing, especially the thing that is now being faced by Icha Steak & Seafood stalls is declining the number of consumers and customers. This is a threat that is being faced by the msme because it will have an impact on revenue turnover. The purpose of this study is to find out what factors need to be improved to achieve consumer satisfaction of Warung Icha Steak & Seafood. Apply the Classification method with C4.5 and ID3 algorithms to group the most influential factors for consumer satisfaction. Perform a Comparison of both C4.5 and ID3 algorithms with the Cross Validation method. Itwas concluded that the problem of determining the consumer satisfaction factor of Warung Icha Steak & Seafood can be solved using data mining techniques, namely with the C4.5 and ID3 algorithms, resulting in the same decision tree and 6 rules and the most dominant factor is Service Friendliness (C8) with a gain value of 0.41370089. Testing the ID3 algorithm has a high level of accuracy of 98.50%, a Precision value of 98.77% and a Recall value of 99.38%
IMPLEMENTATION OF PRODUCTION SCHEDULE BOARD TO DECIDE STANDARD PRODUCTION TIME IN MANUFACTURING INDUSTRY Johny Purnomo Joewono; Tan Kui Siong
TEKNOKRIS Vol 25 No 2 (2022): Jurnal Teknokris Edisi Desember
Publisher : Fakultas Teknik Unkris Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Manufacturing industry is always a challenging area because of the unpredictable uncertainties and obstacles that might occur anytime throughout the operation. For a company to maintain a profitable growth from time-to-time, different approaches in reducing its operation cost while improving the product quality, operation efficiency, and overall control must be taken to avoid its market share being dominated by the competitors. Those approaches raised the demand of new and evolved management systems and production scheduling system is one of the management tool that been widely used in manufacturing industries and has been proven its capabilities and effectiveness through many success histories. The approach of this project is to implement a production scheduling board on a roof manufacturing company that start seeing the advantages of implementing a production scheduling system on their production floor. The implementation process is comprised of few stages, where each of the stage will be carried out according to the right sequence. The company current production flow was analyzed in order to find out the optimum production time that plays a critical role in deciding the functional ability and reliability of the proposed scheduling board. Throughout the analysis process, modifications on implemented scheduling board were identified so that the system is improved and adopted according to the circumstances. The final output of this project is that the implementation of Production Planning System shows positive and encouraged improvement based on the data collected and compared with data before implementation where significant time were saved by using the scheduling method in managing flow of processes and orders. At the end of this project, an electronic version of scheduling board is constructed based on Microsoft Excel due the problem raised and suggestions given. Recommendations were suggested to improve the overall process of this project.
OPTIMALISASI PROYEK INSTALASI GAS MEDIS DENGAN MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) DI RSIA ASIH JAKARTA SELATAN Putra Lamjaya; Florida Butarbutar
TEKNOKRIS Vol 25 No 2 (2022): Jurnal Teknokris Edisi Desember
Publisher : Fakultas Teknik Unkris Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project scheduling is one of the elements of planning results that can provide information about the planned schedule and project progress in terms of resource performance in the form of costs, labor, equipment and materials as well as project duration plans with time progress to complete the required project. One method that is often used in scheduling and time and cost efficiency methods is CPM and PERT. The purpose of this research is to schedule the implementation and control of the medical gas installation project at RSIA ASIH to be more optimal. CPM is basically known as a critical path, namely a path in a network that has a series of activity components, with the longest total time and shows the fastest project completion time. The PERT method is a network-based project scheduling method that requires three time estimates for each activity, namely optimistic time, pessimistic time and realistic time. This research consists of 17 activities where the total time needed to work on this project is 33 weeks. By applying the CPM and PERT methods, the total time required is 30 weeks, so the processing time is 3 weeks more efficient. This can also reduce the costs needed in project work, where the total initial project cost required is . Rp1.165.500.000 to Rp 936.846.660 so that the work on this project will save Rp 228.653.340

Page 1 of 1 | Total Record : 5