Perencanaan MCK dan Septic Tank Komunal di Desa Weninggalih, Kecamatan Jonggol, Kabupaten Bogor Arthono, Andri; Ekadipta, Ekadipta; Salman, Nurcholis; Taqwa, Fadhila Muhammad Libasut
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 7 No. 1 (2023)
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v7i1.7368

Abstract

Abstrak: Indonesia sebagai negara berkembang berupaya meningkatkan pembangunan di semua aspek kehidupan salah satunya sanitasi. Semakin bertambahnya jumlah perumahan dan perkampungan yang mendiami satu area lingkungan, semakin berat pula lingkungan tersebut menetralisir air limbah yang sebagian besar didapatkan dari sisa penggunaan air bersih. Pada lokasi studi di lingkungan desa Weninggalih, Kecamatan Jonggol, Kabupaten Bogor, Air limbah pada umumnya langsung dibuang ke badan sungai tanpa dilakuan pengolahan (treatment) terlebih dahulu, hal tersebut mengancam kelestarian lingkungan, karena keterbatasan kemampuan self-purification lingkungan. Penelitian ini bertujuan untuk merencanakan desain WC/toilet serta tangki septik komunal yang ekonomis, mudah dirawat dan dapat melayani kebutuhan sanitasi warga. Dari analisis yang telah dilakukan, untuk memenuhi kebutuhan 50 orang pengguna, direncanakan MCK komunal dengan 5 (unit) kloset, yang dilengkapi dengan tampungan air bersih dengan kapasitas 400 l. Dengan debit air limbah sebanyak 40 l/org/thn, produksi lumpur septic tank adalah sebanyak 4000 l/tahun. Tangki septik komunal direncanakan memiliki kapasitas 18,97 m3.Kata Kunci: sanitasi, MCK komunal, tangki septik komunal.Abstract: Indonesia as a developing country is trying to increase development in all aspects of life, one of which is sanitation. The increasing number of housing and settlements that inhabit an area of the environment, the more difficult it is for the environment to neutralize wastewater, which is mostly obtained from the remaining use of clean water. At the study site in Weninggalih village, Jonggol District, Bogor Regency, wastewater is generally discharged directly into river bodies without prior treatment, this threatens environmental sustainability, due to the limited ability of environmental self-purification. This study aims to design a communal toilet/toilet and septic tank that is economical, easy to maintain, and can serve the sanitation needs of the residents. From the analysis that has been carried out, to meet the needs of 50 users, a communal MCK with 5 (unit) toilets is planned, equipped with a clean water reservoir with a capacity of 400 l. With a wastewater discharge of 40 l/person/year, the production of septic tank sludge is as much as 4000 l/year. The communal septic tank is planned to have a capacity of 18.97 m3.Key words: sanitation, Communal MCK, communal septic tank.
Analisis Biaya dan Waktu dengan Menggunakan Metode Nilai Hasil (Earned Value) pada Proyek Pembangunan Mako Polres Jakarta Barat Arthono, Andri; Rahayu, Diana; Purbakawaca, Rady
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 8 No. 2 (2024):
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v8i2.15427

Abstract

In carrying out a construction project, the project should be a solid building and have a long life. Criteria and characteristics of a good building of course. It should be realized that changes may occur in the future and will affect the pattern of the plan it self. The length of time for project completion has a major impact on the increase in overall project costs. has been completed or implemented When viewed from the amount of work completed, the concept of Earned Value is one of the control methods used to control project costs and time in an integrated manner. This method is used to analyze implementation performance and make project completion estimates that provide information on project performance in a reporting period and produce cost and time estimates for the completion of all project work. This project is planned for 204 days or about 29 weeks with a contract value of Rp. 106,671,014,961.00