Claim Missing Document
Check
Articles

Found 2 Documents
Search

Identification of Milkfish Supply Chain in PT XYZ at Semarang City, Central Java Province Romdhon, M Mustopa; Asmarani Nurshabrina; Melli
Indonesian Journal of Agricultural Research Vol. 2 No. 2 (2019): InJAR, Vol. 2, No. 2, July 2019
Publisher : Talenta Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (887.991 KB) | DOI: 10.32734/injar.v2i2.1155

Abstract

Bandeng Presto is one of the typical foods of Semarang City, one of the famous milkfish processing industries is PT XYZ. This study aims to identify milkfish supply chains at PT XYZ in Semarang City. The collection of primary and secondary data was carried out in January-February 2019, which was used in describing the supply chain flow. The method of data analysis uses descriptive qualitative. The results obtained are 2 patterns of supply chain flow, the flow I pattern consists of companies - suppliers as well as farmers and flow patterns II consisting of companies - suppliers - farmers. The activities of each pattern are explained in the flow of product, information, and financial.
PERANCANGAN ULANG INSTALASI LISTRIK DI GEDUNG LABORATURIUM TEKNOLOGI HASIL PERKEBUNAN POLITEKNIK NEGERI KETAPANG Melli; Normansyah; Rizaldi, Muhammad Jimmi
Electrical Network Systems and Sources Vol 3 No 2 (2024): Electrical Network Systems and Sources
Publisher : entries

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/entries.v3i2.1609

Abstract

This final project is entitled "Redesign of Electrical Installations in the Plantation Technology Laboratory Building of Ketapang State Polytechnic." This study aims to redesign the electrical installations in the laboratory building to make them more efficient and safe. The methodology used includes analysis of existing conditions, calculation of electricity needs, and redesign of electrical installations in accordance with applicable standards. The results of this study are expected to provide optimal solutions in meeting the electricity needs of buildings, improving safety, and energy efficiency. The redesign of the installation must meet existing provisions and meet the things based on: reliability, accessibility, availability, beauty, security, and economy. The problem discussed is the redesign of electricity in the plantation technology laboratory building of Ketapang State Polytechnic including the number of light points and power installations including conductor sockets in the laboratory building. Keywords: Electrical Installation, Redesign, Energy Efficiency, Safety, Laboratory