Mitigation of power quality problems using series active filter in a microgrid system Awais Farooqi; Muhammad Murtadha Othman; Ahmad Farid Abidin; Shahril Irwan Sulaiman; Mohd Amran Mohd Radzi
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 10, No 4: December 2019
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1115.912 KB) | DOI: 10.11591/ijpeds.v10.i4.pp2245-2253

Abstract

Dynamic voltage restorer (DVR) is a series active filter device that is used to protect sensitive loads from power quality issues such as voltage sag, swell, harmonics or disturbances. This implies that the DVR is capable to mitigate power quality disturbances at load terminal. Harmonic is a major power quality problem polluting distribution network causing the end-user equipment to fail operating due to the occurrence of disturbances in voltage, current or frequency. This paper discusses on the DVR used as the proposed technique to mitigate the voltage sag and swell in a distribution network connected with energy storage system and mini-hydro turbine system.
Energy efficiency enhancement using dynamic voltage restorer (DVR) Muhammad Murtadha Othman; Nik Muhamad Lokman Fahmi Nek Rakami; Zulkiffli Abdul Hamid; Ismail Musirin; Mohammad Lutfi Othman
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 10, No 3: September 2019
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (382.885 KB) | DOI: 10.11591/ijpeds.v10.i3.pp1308-1316

Abstract

Dynamic voltage restorer (DVR) is a device that can compensate harmonic, voltage sag and voltage swell condition that exists in a three-phase system. Other than that, DVR can also be used to enhance the energy efficiency or energy saving by reducing excessive amount of incoming power via the reduction incoming voltage at allowable limit. The DVR can inject the required voltage in the system so that the interruption of supply voltage can be compensated. The compensation of voltage supply interruption is improved based on the hysteresis voltage output of controller used in the DVR to detect the difference between reference voltage and disrupted voltage. The hysteresis voltage control mainly controlled by relays switching so that the signal can be sent to IGBT switches controller. The hysteresis voltage control and unipolar SPWM is supplied to control the IGBT switches by the DC supply for voltage interruption compensation. The unipolar SPWM technique converts the DC supply voltage into AC supplied voltage, thus making the DVR injection become easier to inject the AC voltage into the system to compensate voltage sag and voltage swell.
Improved reliability assessment of backup battery storage integrated with power supply system in a building Muhammad Murtadha Othman; Muhamad Amirul Naim Mohd Jamaluddin; Faisal Fauzi; Ismail Musirin; Mohammad Lutfi Othman
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 10, No 3: September 2019
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijpeds.v10.i3.pp1538-1546

Abstract

This paper presents the improved analysis of reliability for battery storage used in power system. The reliability assessment of this paper includes the evaluation of reliability of the system components, battery module and power electronic components. Battery storage is considered as one of energy storage and energy source that commonly used in power system. The evaluation of the reliability of power systems utilising with the storage batteries is performed by using the Markov chain process. The computation of the reliability is conducted by referring to the generated reliability block begins from power supply system. Every part of the system is evaluated regarding two specific states that are in normal or failure mode. By using the Markov method, the system unavailability and failure frequency can be computed.This paper presents the improved analysis of reliability for battery storage used in power system. The reliability assessment of this paper includes the evaluation of reliability of the system components, battery module and power electronic components. Battery storage is considered as one of energy storage and energy source that commonly used in power system. The evaluation of the reliability of power systems utilising with the storage batteries is performed by using the Markov chain process. The computation of the reliability is conducted by referring to the generated reliability block begins from power supply system. Every part of the system is evaluated regarding two specific states that are in normal or failure mode. By using the Markov method, the system unavailability and failure frequency can be computed.
Dynamic voltage restorer (DVR) in a complex voltage disturbance compensation Muhammad Alif Mansor; Muhammad Murtadha Othman; Ismail Musirin; Siti Zaliha Mohammad Noor
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 10, No 4: December 2019
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1103.199 KB) | DOI: 10.11591/ijpeds.v10.i4.pp2222-2230

Abstract

Nowadays, a distribution network is operating in a stressful manner because of a complex voltage disturbance stirred by its nonlinear, intensified, sensitive and complex loading condition with vast proliferation of electronic equipment required for the integration of renewable energy. A distribution network that mostly inflicted by the complex voltage disturbance can be referred to as the merge of stationary voltage disturbances with a short duration voltage disturbance under a nonlinear loading condition. Therefore, the dynamic voltage restorer (DVR) integrating with the battery bank will have enough energy storage to overcome long and deep complex voltage disturbance that occurs in a distribution network installed with the photovoltaic (PV) system. The results are obtained with satisfactorily findings in compensating the complex voltage disturbance using DVR.
Performance comparison of artificial intelligence techniques in short term current forecasting for photovoltaic system Muhammad Murtadha Othman; Mohammad Fazrul Ashraf Mohd Fazil; Mohd Hafez Hilmi Harun; Ismail Musirin; Shahril Irwan Sulaiman
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 10, No 4: December 2019
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (292.241 KB) | DOI: 10.11591/ijpeds.v10.i4.pp2148-2156

Abstract

This paper presents artificial intelligence approach of artificial neural network (ANN) and random forest (RF) that used to perform short-term photovoltaic (PV) output current forecasting (STPCF) for the next 24-hours. The input data for ANN and RF is consists of multiple time lags of hourly solar irradiance, temperature, hour, power and current to determine the movement pattern of data that have been denoised by using wavelet decomposition. The Levenberg-Marquardt optimization technique is used as a back-propagation algorithm for ANN and the bagging based bootstrapping technique is used in the RF to improve the results of forecasting. The information of PV output current is obtained from Green Energy Research (GERC) University Technology Mara Shah Alam, Malaysia and is used as the case study in estimation of PV output current for the next 24-hours. The results have shown that both proposed techniques are able to perform forecasting of future hourly PV output current with less error.
Continuous domain ant colony optimization for distributed generation placement and losses minimization Zulkiffli Abdul Hamid; Ismail Musirin; Ammar Yasier Azman; Muhammad Murtadha Othman
IAES International Journal of Artificial Intelligence (IJ-AI) Vol 9, No 2: June 2020
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (31.062 KB) | DOI: 10.11591/ijai.v9.i2.pp261-268

Abstract

This paper proposes a method for distributed generation (DG) placement in distribution system for losses minimization and voltage profile improvement. An IEEE 33-bus radial distribution system is used as the test system for the placement of DG. To facilitate the sizing of DG capacity, a meta-heuristic algorithm known as Continuous Domain Ant Colony Optimization (ACOR) is implemented. The ACOR is a modified version of the traditional ACO which was developed specially for solving continuous domain optimization problem like sizing a set of variables. The objective of this paper is to determine the optimal size and location of DG for power loss minimization and voltage profile mitigation. Three case studies were conducted for the purpose of verification. It was observed that the proposed technique is able to give satisfactory results of real power loss and voltage profile at post-optimization condition. Experiment under various loadings of the test system further justifies the objective of the study.
Dynamic Economic Dispatch Assessment Using Particle Swarm Optimization Technique Muhammad Murtadha Othman; Mohd Affendi Ismail Salim; Ismail Musirin; Nur Ashida Salim; Mohammad Lutfi Othman
Bulletin of Electrical Engineering and Informatics Vol 7, No 3: September 2018
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (478.557 KB) | DOI: 10.11591/eei.v7i3.1278

Abstract

This paper presents the application of particle swarm optimization (PSO) technique for solving the dynamic economic dispatch (DED) problem. The DED is one of the main functions in power system planning in order to obtain optimum power system operation and control. It determines the optimal operation of generating units at every predicted load demands over a certain period of time. The optimum operation of generating units is obtained by referring to the minimum total generation cost while the system is operating within its limits. The DED based PSO technique is tested on a 9-bus system containing of three generator bus, six load bus and twelve transmission lines.
Dynamic Economic Dispatch Assessment Using Particle Swarm Optimization Technique Muhammad Murtadha Othman; Mohd Affendi Ismail Salim; Ismail Musirin; Nur Ashida Salim; Mohammad Lutfi Othman
Bulletin of Electrical Engineering and Informatics Vol 7, No 3: September 2018
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (478.557 KB) | DOI: 10.11591/eei.v7i3.1278

Abstract

This paper presents the application of particle swarm optimization (PSO) technique for solving the dynamic economic dispatch (DED) problem. The DED is one of the main functions in power system planning in order to obtain optimum power system operation and control. It determines the optimal operation of generating units at every predicted load demands over a certain period of time. The optimum operation of generating units is obtained by referring to the minimum total generation cost while the system is operating within its limits. The DED based PSO technique is tested on a 9-bus system containing of three generator bus, six load bus and twelve transmission lines.
Dynamic Economic Dispatch Assessment Using Particle Swarm Optimization Technique Muhammad Murtadha Othman; Mohd Affendi Ismail Salim; Ismail Musirin; Nur Ashida Salim; Mohammad Lutfi Othman
Bulletin of Electrical Engineering and Informatics Vol 7, No 3: September 2018
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (478.557 KB) | DOI: 10.11591/eei.v7i3.1278

Abstract

This paper presents the application of particle swarm optimization (PSO) technique for solving the dynamic economic dispatch (DED) problem. The DED is one of the main functions in power system planning in order to obtain optimum power system operation and control. It determines the optimal operation of generating units at every predicted load demands over a certain period of time. The optimum operation of generating units is obtained by referring to the minimum total generation cost while the system is operating within its limits. The DED based PSO technique is tested on a 9-bus system containing of three generator bus, six load bus and twelve transmission lines.
Comparative study of net energy metering and feed-in tariff for the 496kWp UiTM segamat solar photovoltaic system Muhamad Firdaus Zambri; Muhammad Murtadha Othman; Kamrul Hasan; Muhamad Nabil Hidayat; Abdul Kadir Ismail; Ismail Musirin
Indonesian Journal of Electrical Engineering and Computer Science Vol 27, No 2: August 2022
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijeecs.v27.i2.pp601-610

Abstract

The Energy and natural resources ministry (KeTSA) of Malaysia has introduced the net energy metering (NEM) 3.0, which provides an opportunity for consumers to install solar photovoltaic (PV) systems to reduce electricity bills. The NEM 3.0 introduces three new initiatives that offer 500 MW quota from 2021 till 2023. NEM has been implemented since 2016, replacing the feed-in tariff (FiT) strategy by promoting the users to utilize the generated energy in the first place before selling any surplus to the utility. As in the FiT strategy, users can only sell the generated energy at a fixed rate without utilizing it. This paper presents the comparative study between NEM and FiT for 496 kWp solar photovoltaic system in UiTM Segamat, Johor in the perspective of economy and energy practice based on the simulation result of MATLAB/Simulink software.