Claim Missing Document
Check
Articles

Found 2 Documents
Search

Levenberg-Marquardt Recurrent Networks for Long-Term Electricity Peak Load Forecasting Yusak Tanoto; Weerakorn Ongsakul; Charles O.P. Marpaung
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 9, No 2: August 2011
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v9i2.696

Abstract

 Increasing electricity demand in Java-Madura-Bali, Indonesia, must be addressed appropriately to avoid blackout by determining accurate peak load forecasting. Econometric approach may not be sufficient to handle this problem due to limitation in modelling nonlinear interaction of factors involved. To overcome this problem, Elman and Jordan Recurrent Neural Network based on Levenberg-Marquardt learning algorithm is proposed to forecast annual peak load of Java-Madura-Bali interconnection for 2009-2011. Actual historical regional data which consists of economic, electricity statistic and weather during 1995-2008 are applied as inputs. The networks structure is firstly justified using true historical data of 1995-2005 to forecast peak load of 2006-2008. Afterwards, peak load forecasting of 2009-2011 is conducted subsequently using actual historical data of 1995-2008. Overall, the proposed networks shown better performance compared to that obtained by Levenberg-Marquardt-Feedforward network, Double-log Multiple Regression, and with projection by PLN for 2006-2010.
Studi Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Di Kecamatan Ngadu Ngala, Kabupaten Sumba Timur, NTT Tirta Samuel Mehang; Murtiyanto Santoso; Yusak Tanoto
Jurnal Teknik Elektro Vol. 10 No. 1 (2017): Maret 2017
Publisher : Institute of Research and Community Outreach

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/jte.10.1.1-10

Abstract

Saat ini di Kecamatan Ngadu Ngala, Kabupaten Sumba Timur sudah ada PLTD dengan kapasitas daya sebesar 2x25 kVA dan listrik dapat dinikmati selama 6 jam per hari. Pada studi ini dilakukan perencanaan untuk kebutuhan listrik 10 tahun kedepan dengan pola penyediaan menyala selama 6 jam dan selama 24 jam per hari. Alternatif yang digunakan adalah konfigurasi PLTD, konfgurasi PLTS hybrid dengan PLTD dan konfigurasi PLTS. Berdasarkan analisa data yang dilakukan menggunakan HOMER untuk perencanaan kebutuhan listrik 10 tahun kedepan dengan pola penyalaan selama 6 jam per hari konfigurasi terbaik adalah PLTS hybrid dengan PLTD dengan kapasitas PLTS sebesar 4 kWp, PLTD sebesar 26 kW dan memiliki biaya energi sebesar USD 0,368 per kWh sedangkan untuk pola penyalaan selama 24 jam per hari konfigurasi terbaik adalah PLTS hybrid dengan PLTD dengan kapasitas PLTS sebesar 200 kWp, PLTD sebesar 72 kW dan memiliki biaya energi sebesar USD 0,281 per kWh.