Syukron Taufiqurrohman Halifah
Teknik Industri Universitas Muhammadiyah Malang

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Model Economic Production Quantity dengan Rework Process dan Batasan Gudang Dana Marsetiya Utama; Dwi Pramudia Wardani; Syukron Taufiqurrohman Halifah; Dimas Caesario Pradikta
Jurnal Sistem dan Manajemen Industri Vol. 3 No. 1 (2019)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (420.813 KB) | DOI: 10.30656/jsmi.v3i1.1017

Abstract

Rework products and warehouse capacity are common problems experienced by companies in the production process. Several Economic Production Quantity (EPQ) models were developed to minimize the costs of purchasing raw materials. This study aims to develop an Economic Production Quantity (EPQ) model with rework processes and warehouse constraints, assuming that the product is not perfect and can rework. The proposed model considers several cost components, including setup, holding, production, rework, and warehouse. The two proposed models are EPQ models with reworks and warehouse costs, and EPQ models with reworks and warehouse constraints. Based on several tests conducted, it obtains that the increase in the value of the maximum inventory amount did not have an impact on the production costs and the cost of the rework process. Based on several numerical experiments, the total cost of the rework process and production costs do not change to the maximum inventory value.