Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : JURNAL TEKNIK SIPIL UNAYA

Potensi dan Kendala Pengembangan Angkutan Umum Pariwisata Kawasan Toba Amrizal Amrizal
Jurnal Teknik Sipil Unaya Vol 4, No 1 (2018): Januari 2018
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v4i1.29

Abstract

In the absence of a decent, efficient and economical public transportation service, it can be an obstacle for people, especially tourists, to be able to access their desired goals. Of course this will leave a less pleasant impression for tourists, which potentially reduces the attractiveness of tourists Toba Region which indirectly affect the income of the government and also the people of the tourism sector. Based on these considerations, it is time for both central and regional governments to develop tourist public transportation in Toba and surrounding areas more seriously to improve accessibility and mobility and affordability of travel costs in the region. This can be done by revitalizing the existing public transportation route to be transformed into a public transport route. Based on survey results of public transport users for tourist destinations the number is relatively moderate ie between 2-55% of the total passengers transported at the time of the survey. Recorded only from the Terminal shadow Simpang Pos to Brastagi City, Tongging and Paropo and Terminal Siantar to Parapat, Sidamanik and Tiga Ras indicating the existence of passengers with tourist destination. Based on survey results, only public transportation to Berastagi has Load Factor above 100% that is 124%, so it needs to increase the number of its fleet from 18 units to 24 units. Aspects of public transport services assessed include: travel time, waiting time, ease of getting tickets, seat availability, seating comfort and freedom of movement, stopping / terminals, security during travel, travel safety, route info / public transportation routes and complaint media / complaints about service. The survey was conducted on 255 respondents with the aim to see the perception of passengers on public transport services. From the general survey results for all aspects of public transport services assessed, the perception of passengers on public transport services / tours is still in the good category of 49.29%. However, it does not mean that public transport services / tours that are all there are good because passengers who assess public transport services / tours bad and very bad is also quite a lot in the average that is 1.76% and 7.41%.
KAJIAN KELAYAKAN EKONOMI PEMBANGUNAN JEMBATAN LAYANG SIMPANG SELAYANG KOTA MEDAN Amrizal Amrizal; Jeffry Lisra
Jurnal Teknik Sipil Unaya Vol 1, No 1 (2015): Januari 2015
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v1i1.3

Abstract

The purpose of this study is to create an economically effective flyover construction in Medan so that this study can inspire the local official. Total cost of the construction is Rp. 720 billion which consist of  Rp 10.8 billion of flyover base structure construction cost, mobilization and road hardening cost, design and supervision cost; Rp 7.641 billion annual maintenance unit cost; Rp 22.923 billion/5 years periodically maintenance cost; and Rp 4,375,000/m2 estimated  land acquisition cost. The calculated benefit is travel cost cut-off which is the difference between the total travel cost with and without project. The travel cost consists of Vehicle Operational Cost and Time Value. Based on year 2014 analysis, the total amount of the cut-off saving of Simpang Selayang Flyover is Rp 30.06 billion. Economic feasibility analysis of horizon years for 30 years showed that the benefit obtained based on NPV, which is Rp 61,1 billion, is not adequate enough for 12,5 % annual interest rate, this can be seen by the 10.99% Internal Rate Return (IRR), so, the value of Simpang Selayang Flyover construction is not economically feasible yet.