Zahrul Fuadi
Jurusan Teknik Mesin, Fakultas Teknik, Universitas Syiah Kuala

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perancangan Sistem Pembangkit Listrik Hibrida untuk Menggerakkan Pompa Air di Area Pertanian Fazri Fazri; Ahmad Syuhada; Zahrul Fuadi
Jurnal Teknik Mesin Unsyiah Vol 4, No 1 (2016)
Publisher : Jurnal Teknik Mesin Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (17.41 KB)

Abstract

The economic development and population growth in Indonesia has been increasing rapidly. Most of the agricultural land converted into residential and industrial areas, while many farmers moved to a mountainous area. Farmers in mountainous agricultural area using existing sources of water in a small mountainous rivers to irrigate agricultural land, they use man power to lift water from a small river to agricultural land, it is highly ineffective in agricultural products. Farmers with adequate financial can use pumps for raising the water to agricultural land. But because it is far from the power source, pump can only work with the use of expensive fossil fuels. Therefore, to overcome this problem it is necessary to use a renewable energy source which is available in the area such as solar energy and wind or both of them. This research examines about the hybrid power plant (PLTH) of solar and wind energy to power the agriculture pump. The wind speed and solar radiation data is obtained from measurements by BMKG-SMPK-Plus Sare. The output power of the Photovoltaic is equal to 193 W with the exposure time of 5 hours/day, while the power output of the wind turbine is 459.84 W with a 3m blade diameter long and 7 hours/day blowing wind. The pump power was 558 W with a capacity of 20,160 liters/hour, it is used for 15 ha of agricultural area. Based on the analysis results, the proposed system will generate an initial investment cost of US$ 14.938 with power production equal to 3.210 kW/year.
Analisis Kenyamanan Thermal Pada Ruang Pendaftaran Pasien Gedung RSUD Meuraxa Banda Aceh Junaidi Junaidi; Ahmad Syuhada; Zahrul Fuadi
Jurnal Teknik Mesin Unsyiah Vol 3, No 1 (2015)
Publisher : Jurnal Teknik Mesin Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The improvement status of RSUD Meuraxa from non referral to full service and equipped hospital brought several implications to the hospital services particularly in dealing with the increase of patients. The increasing flow of patients in line results in the escalation of the room temperature. The condition was affected by thermal inconveniency caused by direct thermal radiation from the sun, embedded and congenital metabolism of patients (Met), patient clothing insulation (Clo), room equipments and room air circulation. The phenomena affect human performance in their activities. To maintain its status as a general hospital, the impaired condition should be addressed by knowing first the source of the cause. Several measures are normally conducted through direct assessment of the room thermal condition involving the temperature measurement, relative humidity, rate of air flow, and sun ray intensity. Based on the measurement and analysis, it is found that the increase in the room’s occupation has resulted in average increase of room temperature and relative humidity of 30C and 2%, respectively.Themaximum indoor temperature reached 360 while the minimum humidity was 44%. The average indoor air flow rate was less than 1 m/s. It is suggested that one possible solution to improve the thermal inconvenience on the room is by installing the air blower to improve the air circulation of the room.