Claim Missing Document
Check
Articles

Found 6 Documents
Search

Food product design with Wijaya Kusuma character based on pleasurable design Johan Paing Heru Waskito; Endang Retno Wedowati; Fungki Sri Rejeki; Emmy Wahyuningtyas
International Journal of Engineering, Science and Information Technology Vol 2, No 1 (2022)
Publisher : Master Program of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (438.927 KB) | DOI: 10.52088/ijesty.v2i1.193

Abstract

Understanding and appreciation of the identity of the Universitas Wijaya Kusuma Surabaya with the motto Anggung Wimbuh Linuwih, which means always growing and developing for the better, needs to be done. The strategy that can be applied is to design a superior product that has the character of Wijaya Kusuma This food product was designed with the nuances of the character of Wijaya Kusuma. The product that reviewed in this research is chocolate product. Food product design in this study used the concept of pleasurable design, which reviews product design from the aspects of functionality, usability, and pleasure. Pleasurable design was chosen with the consideration that this product design method involves customers as product users to participate in building product designs as needed and   wanted. The purpose of this study was to determine the attributes of chocolate products according to market demand, as well as to design a chocolate product design with the character of Wijaya Kusuma values. Based on the research results obtained 16 product configurations based on seven product attributes (taste, sweetness level, texture, shape, packaging method, health benefits, and appearance/profile). Attributes that have a high importance value are attributes of appearance/profile and taste. Attributes of appearance/profile can directly describe the character of Universitas Wijaya Kusuma Surabaya. while the taste attribute is one of the key attributes in food products.   Product design 5 (chocolate taste, slightly sweet, texture of slightly hard, rectangle shape, folded packaging method, no preservatives, and UWKS logo profile) became the selected product with a total utility value of 10.75.
PERCEPATAN PELAKSANAAN PROYEK MENGGUNAKAN METODE CPM DAN PERT (STUDI KASUS PROYEK PEKERJAAN KONSTRUKSI LANJUTAN F-MIPA TOWER MENARA SAINS TAHUN 2020 KAMPUS ITS) Muhammad Fany Tamzidhillah; Johan Paing Heru Waskito
axial : jurnal rekayasa dan manajemen konstruksi Volume 10, Nomor 2, Agustus Tahun 2022
Publisher : axial : jurnal rekayasa dan manajemen konstruksi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30742/axial.v10i2.2485

Abstract

ABSTRAK: Proyek adalah suatu kegiatan usaha guna meraih tujuan akhir dengan seluruh batasan yang ada seperti waktu, serta anggaran yang ada. Pada proyek Pekerjaan Konstruksi Lanjutan Pembangunan Gedung FMIPA Tower (Menara Sains) Tahun 2020 Kampus ITS Sukolilo, Surabaya. Terdapat pekerjaan yang komplek dan mengalami keterlambatan. Berdasarkan permasalahan tersebut, riset ini mengenakan metode Critical Path Method (CPM) serta Program Evaluation and Review Technique (PERT) guna memastikan jaringan kerja, aktivitas kritis, jalur kritis, serta menganalisa durasi ataupun bayaran yang optimal. Diketahui bahwa jangka waktu pelaksanaan normal proyek ini selama 180 hari dengan biaya sebesar Rp. 27.560.854.634. Berdasarkan dari hasil penelitian ini diketahui jalur kritis pada Pekerjaan Persiapan (A) – Pekerjaan Dinding dan Lapisan (LT 4 - LT Atap) (B) - Pekerjaan Lantai (LT 4 - LT 10) (C) - Pekerjaan Plafond (LT 4 - LT Atap) (D) - Pekerjaan Pengecatan (LT 4 - LT Atap) (E) - Pekerjaan Kaca Jendela dan Pintu (LT 4 - LT Atap) (F) - Pekerjaan Sanitair (LT 4 - LT 10) (H) - Pekerjaan Doorjamb Lift(LT Dasar - LT 10) (I) - Pekerjaan Electrikal (LT 4 - LT Atap) (J) - Pekerjaan Air Conditioner (AC) (LT 4 - LT Atap) (K) - Pekerjaan Elektronik (LT 4 - LT Atap) (L) - Pekerjaan Mekanikal (LT 4 - LT Atap) (M) dan dapat dipercepat hingga 140 hari dengan total biaya Rp. 29.553.761.340 dengan probabilitas penyelesaian sebesar 99,89 persen.  KATA KUNCI : CPM, PERT, Manajemen Proyek, Cost Slope, Crashing Time
EVALUASI PERCEPATAN WAKTU PADA PROYEK PEMBANGUNAN JALAN LINGKAR LUAR BARAT (SEMEMI UTARA) MENGGUNAKAN METODE CRASHING PROGRAM Agil Tri Setya; Johan Paing Heru Waskito
axial : jurnal rekayasa dan manajemen konstruksi Volume 10, Nomor 2, Agustus Tahun 2022
Publisher : axial : jurnal rekayasa dan manajemen konstruksi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30742/axial.v10i2.2483

Abstract

ABSTRAK: Evaluasi Percepatan Waktu Pada Proyek Pembangunan Jalan Lingkar Luar Barat (Sememi Utara) mengalami keterlambatan. Perlu dilakukan percepatan penyelesaian pada proyek tersebut dengan penambahan jam kerja. Rumusan masalah dalam penelitian ini bagaimana mengoptimalkan percepatan durasi serta biaya yang dibutuhkan dari setiap percepatan durasi pada proyek tersebut. Penelitian ini bertujuan untuk menghitung dan menganalisa waktu dan biaya penyelesaian pekerjaan setelah dilakukan analisa dan percepatan. Metode penelitian yang digunakan dalam penelitian ini adalah metode kuantitatif. Hasil penelitian dengan menggunakan metode Crashing Program pada proyek adalah hasil yang optimasi dijelaskan bahwa penambahan jam kerja (lembur) sebanyak 7 jam sehari maka didapatlah hasil waktu optimal sebanyak 30 HK dengan menghabiskan total biaya optimal sebesar Rp 94.582.966.951,14 pada Evaluasi Percepatan Waktu Pada Proyek Pembangunan Jalan Lingkar Luar Barat (Sememi Utara) lebih optimal dibandingkan dengan menambahkan jam kerja lembur selama 4 jam kerja. KATA KUNCI : proyek jalan, percepatan durasi, crashing program, time cost trade off
Digitalisasi Konsep Numerology sebagai Alternatif Tools untuk Rekruitmen SDM di Bidang Konstruksi Nonot Wisnu Karyanto; Johan Paing Heru Waskito; Andaryati Andaryati
ILKOMNIKA: Journal of Computer Science and Applied Informatics Vol 5 No 1 (2023): Volume 5, Nomor 1, April 2023
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.28926/ilkomnika.v5i1.511

Abstract

Pada era teknologi informasi ini, hampir semua bidang ilmu diimplementasikan dengan teknologi informasi, tanpa terkecuali dalam mempelajari ilmu numerologi. Salah satu penerapan dari ilmu numerologi adalah pada bidang manajemen sumber daya manusia, khususnya saat proses rekuitmen dan penempatan sumber daya manusia agar sesuai dengan prinsip right man on the right place. Numerologis mengenali angka 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 memiliki signifikansi spesifik mereka sendiri. Angka-angka tersebut mencerminkan ciri-ciri kepribadian yang berbeda, baik positif maupun negatif. Angka-angka yang berasal dari nama dan tanggal lahir dapat memberi tahu tentang apa kekuatan dan kelemahan, dan pada gilirannya sifat-sifat apa yang akan terus dikembangkan, dan sifat-sifat apa yang perlu diperhatikan. Untuk proses digitalisasi mempergunakan pemrograman Java dan MathLab serta dibantu dengan program aplikasi Excel. Untuk proses perancangan digunakan konsep Rapid Aplication Development (RAD). RAD ini adalah salah satu alternatif dari System Development Life Cycle (SDLC). System SDLC digunakan untuk mengatasi kendala keterlambatan ketika menggunakan metode konvensional. Metoda Perancangan Sistem meliputi tiga tahap, yaitu Rencana Kebutuhan, Disain Proses Kerja dan Disain Perancangan. Selanjutnya, dilakukan proses development. Hasil akhir aplikasi digunakan untuk penelusuran karakter dan dibandingkan dengan metoda standard yaitu Person Personality, MBTI dan MMPI. Sebagai uji aspek user friendly, dilakukan uji kepada 200 pegiat HRD. Pendapat dari para responden adalah tampilan aplikasi menarik (P1), materi dalam aplikasi mudah dipahami (P2), penggunaan Bahasa mudah dipahami (P3), ilustrasi / gambar memperjelas pemahaman (P4), keterangan dalam reference sangat membantu pemahaman (P5), aplikasi cukup interaktif (P6), tampilan menu tertata rapi (P7), aplikasi dapat berjalan lancar di handphone (P8), aplikasi mudah di gunakan/user friendly (P9) dan aplikasi ini sangat membantu dalam proses prediksi karakter dasar (P10).
IDENTIFIKASI FAKTOR-FAKTOR YANG MEMPENGARUHI KEUNTUNGAN KONTRAKTOR GRADE KUALIFIKASI KECIL DI KOTA SURABAYA Didan Dwi Izza Lukmana; Johan Paing Heru Waskito
axial : jurnal rekayasa dan manajemen konstruksi Volume 11, Nomor 2, Agustus Tahun 2023
Publisher : axial : jurnal rekayasa dan manajemen konstruksi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30742/axial.v11i3.3261

Abstract

ABSTRAK: Kontraktor yang berskala besar atau kontraktor kualifikasi besar akan memberi perhatian yang lebih kepada faktor-faktor yang dapat mempengaruhi proyek, sedangkan kontraktor berskala kecil kurang memberi perhatian yang lebih dalam mengantisipasifaktor-faktor yang akan mempengaruhi proyek. Penelitian ini memiliki tujuan mengidentifikasi dan menganalisis faktor yang paling mempengaruhi keuntungan kontraktor grade kualifikasi kecil dan peringkat faktor yang paling berpengaruh terhadap keuntungan kontraktor grade kualifikasi kecil. Penelitian ini menggunakan metode kuantitatif. pengumpulan menggunakan metode kuesioner dan interview. Hasil penelitian yang sudah dilakukan terdapat tujuh variable dan tiga puluh enam indikator yang mempengaruhi keuntungan kontraktor kualifikasi kecil di kota Surabaya. Adapun tujuh variable tersebut adalah keterlambatan proyek, produktifitas tenaga kerja, produktifitas material, produktifitas peralatan, manajemen dan perencanaan, pinalti atau denda, lain-lain. KATA KUNCI : Kontraktor, Kualifikasi Kecil, Proyek
EVALUASI PELAKSANAAN PROYEK DENGAN METODE CPM DAN PERT (STUDI KASUS PROYEK PEKERJAAN FINISHING LANJUTAN PEMBANGUNAN GEDUNG PROGRAM STUDI DESAIN INTERIOR TAHUN 2019 KAMPUS ITS) Apriyanto Dwi Nugraha; Johan Paing Heru Waskito
axial : jurnal rekayasa dan manajemen konstruksi Volume 11, Nomor 2, Agustus Tahun 2023
Publisher : axial : jurnal rekayasa dan manajemen konstruksi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30742/axial.v11i3.3258

Abstract

ABSTRAK: Proyek dapat diartikan sebagai rangkaian beberapa kegiatan dalam jangka waktu yang terbatas dengan mengalokasikan sumber daya yang ada dengan tujuan menghasilkan produk yang mutunya telah digariskan dengan jelas. Proyek Pekerjaan Finishing Lanjutan Pembangunan Gedung Program Studi Desain Interior Kampus ITS Sukolilo Tahun 2019 mengalami keterlambatan waktu penyelesaian. Berdasarkan permasalahan tersebut, penelitian ini dilakukan untuk mengetahui jalur kritis, serta waktu maupun biaya yang optimal dengan menggunakan metode Critical Path Method (CPM) dan Program Evaluation and Review Technique (PERT). Diketahui bahwa waktu pelaksanaan normal proyek tersebut adalah 171 hari dengan total biaya Rp.9,024,840,000.00. Berdasarkan hasil penelitian ini dapat diketahui bahwa jalur kritis pada proyek tersebut adalah Pekerjaan Persiapan (A) – Pekerjaan Pasangan Dinding lt.1-lt.atap (B) – Pekerjaan Plesteran lt.1-lt.atap (C) – Pekerjaan Partisi lt.1-lt.4 (E) – Pekerjaan Pintu & Jendela lt.1-lt.4 (F) – Pekerjaan Sanitair lt.1-lt.4 (K). Durasi optimal proyek tersebut adalah 23 minggu dengan nilai probabilitas sebesar 5,37 persen. Total biaya optimal proyek tersebut adalah sebesar Rp.9,096,120,000.00.. KATA KUNCI : CPM, Evaluasi, Jalur Kritis, Manajemen Proyek, PERT