Journal : International Journal of Engineering, Science and Information Technology

Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya’s City Outer East Ring Road Construction Project (Segment 1) Syahrur Romadhona; Fredy Kurniawan; Julistyana Tistogondo
International Journal of Engineering, Science and Information Technology Vol 1, No 2 (2021)
Publisher : Master Program of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1400.21 KB) | DOI: 10.52088/ijesty.v1i2.56

Abstract

The project acceleration by the Crash Program is one of the ways that is often used to make time and cost efficiency on an ongoing project. Acceleration of project completion time will affect the efficiency of equipment and labor productivity. In the case study of the Surabaya Outer East Ring Road Project Construction Segment 1, a project that has the potential to be accelerated is discussed in order to obtain efficiency values in terms of time and cost, Project acceleration by means of the Crash Program using the Precedence Diagram Method (PDM) method to determine the value of efficiency. This project uses resources, in this research the software used is Microsoft Project 2016. The research method used is to design network planning, find the critical path for each job, determine the work that has the potential to be accelerated, calculate the crash cost in additional working hours. and work shifts, calculating direct costs and indirect costs for each activity that changes due to changes in the duration of implementation, calculating the cost slope. Application of the Crash Program in the work of Asphalt Concrete Surface Layers (AC) thick 5 cm in the project will have an impact on increasing the time efficiency previously planned from 180 working days to 175 working days and efficiency with the difference in project costs of Rp. 18.313.935,8 with a ratio of 0,997 between the PDM method compared to the cost of the contract value calculated using the crashing project method.
Case Study of Public-Private Partnership on Infrastructure Projects of Tibar Bay Port in Timor-Leste Zeferino Soares Lopes; Fredy Kurniawan; Julistyana Tistogondo
International Journal of Engineering, Science and Information Technology Vol 1, No 3 (2021)
Publisher : Master Program of Information Technology, Universitas Malikussaleh, Aceh Utara, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1103.367 KB) | DOI: 10.52088/ijesty.v1i3.79

Abstract

Public - Private Partnership (PPP) offers many potential benefits for the government in providing infrastructure facilities. However, the implementation of the Public Private Partnership project is not easy. Infrastructure Development is one of the development priorities in developed and developing countries, including Timor-Leste. As one of the priorities of national development, cost limitations are the main problem faced by the government. Therefore, to overcome the lack of funding, the government can involve the private sector in terms of providing funds to finance the construction of infrastructure facilities.The Government of the Democratic Republic of Timor-Leste (RDTL) must have good regulations to achieve the goals of Timor-Leste in the future through cooperation between the government and the private sector. Good regulation is one of the best ways for good cooperation between the government and the private sector.In this study, the chosen location is the Tibar Bay Port in Timor-Leste. Based on the results of research that has been done, infrastructure development efforts do not have to rely on the Timor-Leste government as a single actor, the involvement of other parties such as the private sector is also needed for infrastructure development. The Government of Timor-Leste is fulfilling a big dream for the the future through the development of infrastructure in accordance with the strategic development plan for 2011-2030 to come, because the Government of Timor-Leste prepares a bright future for a country to become a developed country like other countries.