ANALISIS PRODUKTIFITAS KERJA DENGAN TIME STUDY METHOD Arman Jayady; M Heri Zulfiar; Yusuf Ekoprasetyo
Jurnal Karkasa Vol 7 No 1 (2021): Jurnal Karkasa - Juli 2021
Publisher : LPPM Politeknik Saint Paul Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32531/jkar.v7i1.300

Abstract

Pada pengerjaan atap baja ringan di perumahan Green Hilss Malang yang kemungkinan mengalami keterlambatan proyek hingga mencapai 79,8%, keterlambatan itu terjadi karena beberapa faktor yaitu faktor cuaca dan faktor pekerja. Penelitian ini bertujuan agar mengetahui nilai produktivitas pekerja struktur bawah yaitu pondasi borepile pada proyek pembangunan Gedung Student Dormitory Universitas Muhammadiyah Yogyakarta dan mengetahui apa saja faktor-faktor yang dapat menghambat produktivitas pekerja pada proyek pembangunan Gedung Student Dormitory Universitas Muhammadiyah Yogyakarta. Dalam menentukan nilai produktivitas penelitian ini menggunakan metode time study, sehingga dapat mengasilkan nilai rata-rata produktivitas pekerja untuk tiap pekerjaan struktur pondasi. Pekerjaan penulangan pada diameter 80 cm 3378,83 kg/hari untuk kelompok pekerja 4 orang dan 4045,70 kg/hari untuk kelompok pekerja 5 orang. Pekerjaan penulangan pada diameter 100 cm 4569,00 kg/hari untuk kelompok pekerja 4 orang, dan 5506,40 kg/hari untuk kelompok pekerja 5 orang. Pekerjaan Pengeboran pada diameter 80 cm = 93,30 m/hari untuk kelompok pekerja yang terdiri dari 5 orang. Pekerjaan pengeboran pada diameter 100 cm = 70,02 m/hari untuk kelompok pekerja yang terdiri dari 4 orang , dan 95,24 m/hari untuk kelompok pekerja yang terdiri dari 5 orang. Pekerjaan Pengecoran pada diameter 80 cm = 40,50 m3/hari, kelompok pekerja yang terdiri dari 4 orang, 53,10 m3/hari, kelompok pekerja yang terdiri dari 5 orang. Pekerjaan Pengecoran pada diameter 100 cm 57,70 m3/hari, kelompok pekerja yang terdiri dari 4 orang dan 77,90 m3/OH, kelompok pekerja yang terdiri dari 5 orang.
Identifikasi Faktor Dominan Penyebab Kerentanan Bangunan Di Daerah Rawan Gempa, Provinsi Sumatera Barat M Heri Zulfiar; Tamin Tamin; Krishna S Pribadi; Iswandi Irwan
Semesta Teknika Vol 17, No 2 (2014): NOVEMBER 2014
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.v17i2.419

Abstract

West Sumatra is one of the province in Indonesia owning high earthquake risk. Disaster data in last one decade show the existence of occurence of earthquake generating damage of building in gross. This matter indicate that building in West Sumatra susceptance of  earthquake. One of the building susceptance is management of construction which disagree with needed conditions, law and regulation goodness which in rough, and also execution of imprecise development, imprecise build, either from planning facet and scheme, execution and observation, and also from exploiting facet and treatment. It can make infrastructure and building susceptance of disaster. When disaster happened, construction sector product becoming not function, it will generate disaster victim, or generate big loss, because destruction of other infrastructure or building. Research identify dominant factor is building susceptance represent the part of research of dissertation in the effort to less of building susceptance ( mitigation) to earthquake, by :1) sekunder data analysis of building effect of earthquake 2) perception of building characteristic and practices build 3) interview to some construction expert and earthquake. Research location in six sub-province / disaster gristle town that is; Padang city, Padang Panjang city, sub province of  South Pesisir, sub province of Tanah Datar, sub province of Pariaman and west Pasaman. Research Object at building with floor lower and confined of un-confined masonry. To know potency cause of susceptance by triangulation and sintesis among the data, fact and opinion of expert. Result of research indicate that there are 23,6 % building residing in less condition or did not maintained. To be evaluated from building form, there are 11,1% less up to standard building hold up earthquake that is having regularity of vertical form and horizontal. Pursuant to characteristic usage of brick wall with building structure there are 40,8 % having structure system susceptance of earthquake that is using inappropriate practical log and column.