Claim Missing Document
Check
Articles

Found 2 Documents
Search

PENGARUH KARAKTERISTIK PEKERJAAN TERHADAP KINERJA PEGAWAI (Studi pada Pegawai di Politeknik Ilmu Pelayaran Semarang) Awel Suryadi
JURNAL SAINS DAN TEKNOLOGI MARITIM Vol 19, No 2 (2019): Maret
Publisher : UNIMAR AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (622.817 KB) | DOI: 10.33556/jstm.v19i2.206

Abstract

The purpose of this research is to test and analyse jobs characteristics to the employees performance if Polytechnic Merchant Marine Semarang. The population is 190 employese which using random sampling technique of 129 respondents. The data analysis is using multi regression analysis which concludes that performance characteristic has positive and significance influence to the employee’s performance.   Keywords : Performance characteristic, Performance of employeeTarget dari penelitian ini untuk menguji dan menganalisa karakteristik pekerjaan terhadapa kinerja pegawai di Politeknik Ilmu Pelayaran Semarang.  Pada penelitian ini populasi pegawai di Politeknik Ilmu Pelayaran Semarang dihitung sampai dengan 190 orang..Mengambil sampel dari teknik porposional stratifikasi acak. Penilaian dari jumlah ini menggunakan rumus Slovin didapatkan dengan menghitung 129 responden. Data analisis menggunakan analisis regresi ganda.  Karakteristik kinerja mempunyai efek positif dan signifikan pada kinerja pegawai.             Kata kunci : Karakteristik kinerja, Kinerja pegaiwai
Evaluation of Facilities Improvement and Utilization Strategy Tegal Port Awel Suryadi; Fuad Ardani Rahman
Dinamika Bahari Vol 4 No 1 (2023): May 2023 Edition
Publisher : Politeknik Ilmu Pelayaran Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46484/db.v4i1.395

Abstract

According to the national port master plan, Tegal Port is a hub port. In practice, a number of fishing boats crowd the port pool area thereby disturbing the area that should be used for the port loading and unloading process. Full port facilities are not supported by this circumstance. Commercial ships wishing to enter the port must wait for the tide to enter the waters of the port pool because shipping lanes enter the port wisely around 3 LWS. This study aims to examine the relationship between the port facility utilization index and the port facility performance index in several categories of capacity accessibility and satisfactory performance levels, in the categories of safety, order, smoothness and speed, and pollution experienced unsatisfactory performance. This research uses a descriptive method. Data obtained from surveys and analyzed using the SWOT method. The SWOT analysis shows strength-opportunity (SO) conditions where managers must maximize the potential of ports that have facilities. The results of the SWOT analysis show that the right strategy to use for port development is strength-opportunity, namely improving existing facilities as well as possible, such as making repairs to facilities that are not suitable for use and adding facilities at the port and increasing cooperation with stakeholders by making more work agreements, promising and facilitating service users as well as cutting bureaucracy that does not complicate service users.