Zakia Zakia
Jurusan Teknik Sipil Universitas Teuku Umar, Alue Penyareng, Meulaboh, Aceh Barat

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

STUDY KELAYAKAN INVESTASI ALAT BERAT PADA INDUSTRI JASA KONTRUKSI JALAN Edi Mawardi; Zakia Zakia; Bambang Tripoli
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 6, No 1 (2020): Jurnal Teknik Sipil dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (601.489 KB) | DOI: 10.35308/jts-utu.v6i1.1972

Abstract

weight is very important in a construction work. The advantage of using heavy equipment is that it can get the job done faster. The use of heavy equipment that is not right will cause losses in terms of time, technical, and cost. For this purpose the feasibility of investing in heavy equipment is very necessary. A precise and complete analysis of operating costs for the heavy equipment will help the company to make decisions, especially in financial terms. The purpose of this study is to determine the feasibility of heavy equipment investment in the road construction industry. analysis of heavy equipment operating costs, and knowing good machine handling. Cost analysis on heavy equipment, is expected to provide benefits that can be feasible to invest in heavy equipment in the construction services industry. This research was carried out on the Project for Improvement of the Alun-Alun Suka Makmue Road-Phase II Eastern Ring Road, located in the Regency Nagan Raya. This study uses a qualitative method with a descriptive approach, namely research that tries to tell a solution to problems based on data that will be obtained in the field. This study uses a qualitative method with a descriptive approach, namely research that tries to tell a solution to problems based on data that will be obtained in the field. 738. per hour, motor grader Rp. 572,401 per hour, roller vibrator Rp. 499,735 per hour and water tanker truck Rp. 348,859 per hour. Whereas the economic age calculation is obtained for excavators, namely NVP = - Rp. 336. 421,545 <0 unfeasible, motor graders ie NVP = - Rp. 284. 7095,627 <0 unfeasible, vibrator roller NVP = Rp. 41,266,203> 0 feasible investment and water tanker truck that is NVP = Rp. 29,677,392> 0 feasible investment. The results show that excavator and motor grader heavy equipment has not yet returned capital, while for heavy equipment vibrator rollers and water tankers have returned capital. So for heavy equipment vibrator rollers and water tanker trucks are feasible to be replaced with a new device.Keywords: Heavy Equipment, Investment Feasibility and Operating Costs.
Identifikasi Motivasi Pekerja Pada Proyek Konstruksi Di Kabupaten Aceh Barat Zakia Zakia
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 4, No 1 (2018): Jurnal Teknik Sipil Dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (448.276 KB) | DOI: 10.35308/jts-utu.v4i1.593

Abstract

Motivation aspect becomes very important to boost the spirit and performance of the workers on construction project. This performance improvement becomes an important challenge in the construction industry in Indonesia. The concept of motivation applied in a work environment will provide support to the worker. Therefore, we need a concept of motivation that can be applied in the work environment. The purpose of this study is to identify and analyze the factors that affect the performance of construction workers and recommend alternative motivation of employers to construction projects in West Aceh regency. The research is based on theoretical biotechnological yoruteorical needs of Maslow's needs. The method used in this research is descriptive analysis. The results of this research calculation using the help of computer program SPSS (Statistical Product and Service Solution) version 16.00. validity test, reliability test, and frequency test of the analysis can be seen that bonuses and additional wages are top priority on physical needs with a total value of 135, a good safety program is a top priority on security and safety needs with a total value of 130, a good relationship with fellow workers being the top priority of social needs with a total of 123 values, being able to complete the job well becomes a top priority on reward needs with a total score of 122, setting a good work schedule a top priority on the need for identity with a total value of 115, while alternatives which can be done to identify the motivation of construction workers in Kabupatan Aceh Barat is to provide bonuses and additional wages when workers can complete the work before the target as a form of appreciation.  Keywords :Workers, motivation, SPSS