Noer Fadhly
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS KINERJA SIMPANG BERSINYAL DAN BERLENGAN EMPAT (STUDI KASUS SIMPANG BPKP, BANDA ACEH) Sofyan M. Saleh; Noer Fadhly; Ruhdi Faisal
JURNAL TEKNIK SIPIL Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: BPKP intersection is located in Banda Aceh City. This intersection was modified from three approaches between T.P. Nyak Makam Street and T. Iskandar Street, to be four approaches intersection.  The new approaches is connected T.P. Nyak Makam Street to B. Aceh – Medan National road after finishing Santan Bridge. The objective of this study is to analyze the performance of four approaches junction with traffic signal. Video Camera was installed in the data collection then analyze with Indonesian Highway Capacity Manual (IHCM, 1997) and the result would be come out in graphs and tables. The result showed that at peak hour and the highest flow are from the North approaceh, South approaches, east approach, and West approache consecutively; 810 pcu/hour, 571 pcu/hour, 797 pcu/hour, and 870 pcu/hour. Meanwhile the capacity for the existing condtion for those four approaches are consecutively; 596 pcu/hr, 766 pcu/hr, 770 pcu/hr, and 557 pcu/hr. From these data of the existing condition then can be found that the average degree of saturation (DS) is 1,18 and average delay is 402,6 sec/pcu, with cyclus time 89 second. After adjusting the geometric of junction, the performance is getting better with increase in capacity all approaches namely; the North approaceh tobe 1093 pcu/hr, South approaches 771 pcu/hr, East approach 1076 pcu/hr, and West approache 1174 pcu/hr. The average DS for all approach become lower to 0,74, and the average delays to be 24,4 sec/pcu. After predicting 5 years later with average traffic grouth of 17,5% per year, so DS will be 1,66, it means that need to be evaluated.Keywords : Flow, capacity, degree of saturation, delay, cyclus time.Abstrak: Simpang BPKP terletak di Kota Banda Aceh, sebelumnya merupakan simpang berlengan tiga antara jalan T. P. Nyak Makam dengan jalan T. Iskandar. Setelah dibangunnya Jembatan Santan yang merupakan terusan jalan T. P. Nyak Makam menuju jalan Nasional B. Aceh – Medan di Desa Meunasah Manyang Aceh Besar, maka Simpang BPKP menjadi simpang berlengan empat. Penelitian ini bertujuan untuk menganalisa kinerja simpang berlengan empat yang diatur dengan sinyal lalu lintas. Pengumpulan data  dilakukan dengan menggunakan kamera video yang kemudian diolah menggunakan metode MKJI 1997 dan hasil yang didapat dalam bentuk tabel dan grafik. Hasil perhitungan jam puncak dengan arus tertinggi diperoleh pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 810 smp/jam, 571 smp/jam, 797 smp/jam dan 870 smp/jam. Nilai kapasitas kondisi eksisting pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 596 smp/jam, 766 smp/jam, 770 smp/jam dan 557 smp/jam. Nilai derajat kejenuhan rata-rata pada kondisi eksisting sebesar 1,18. Nilai tundaan rata-rata sebesar 402,6 det/smp. Waktu siklus eksisting yang disesuaikan sebesar 89 detik. Setelah dilakukan analisis dengan perubahan geometrik, kinerja simpang menjadi lebih baik ditandai dengan nilai kapasitas pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 1093 smp/jam, 771 smp/jam, 1076 smp/jam dan 1174 smp/jam. Nilai derajat kejenuhan pada lengan Utara, Selatan, Timur dan Barat masing-masing sebesar 0,74. Nilai tundaan rata-rata sebesar 24,4 det/smp. Apabila diprediksi pertumbuhan kendaraan pertahun 17,5 %, maka untuk 5 tahun mendatang diprediksi simpang dengan perubahan geometrik memiliki nilai DS sebesar 1,66 untuk setiap lengan-lengan simpang.Kata kunci : arus lalu lintas, kapasitas, derajat kejenuhan, tundaan, waktu siklus.
STUDI PENGGUNAAN JALAN ALTERNATIF TERHADAP BIAYA OPERASIONAL KENDARAAN (STUDI KASUS TERUSAN JALAN PANGLIMA NYAK MAKAM MENUJU DESA MEUNASAH MANYANG ACEH BESAR) Sofyan M. Saleh; Noer Fadhly; Miswar Afriyandi
JURNAL TEKNIK SIPIL Vol 1, No 1 (2011): Volume 1, Nomor 1, September 2011
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak: Before the Santan Bridge on the T. Panglima Nyak Makam continuation road was completed, the Surabaya bridge on the T. Hasan Dek road is the main route for the movement of the segment between Tgk. Imum Lueng Bata - T. Hasan Dek - T. Iskandar Road in Banda Aceh city. The traffic volume on this road is high, because these segment of roads connecting road users of the area of Lueng Bata - Ingin Jaya and surrounding areas to the education center and offices are located in the city of Banda Aceh. In this study is conducted on the use of alternative road with the assumption that the Santan Bridge has been built and its effect on vehicle operating costs (VOC). Data taken in this study is the data of traffic volume, traffic speed and vehicle cost units. The results of data analysis showed that, the scenarios do nothing has the traffic volume of 1571 passengers car unit per hour (pcu/h), and the capacity of 1427 pcu/h, free flow speed of 50 km/h, the degree of saturation of 1.10, as well as the VOC is Rp. 2,975,114,800, - per year. The scenario do something 1 showed that the traffic volume of 281 pcu/h, the degree of saturation of 0.18, and the savings of VOC of is Rp. 400 103 093, - per year. For scenario do something 2, the traffic volume 530 pcu / h, the degree of saturation is 0.35, and the saving of VOC,is Rp. 756 817 075, - per year. While the capacity and the free flow speed on the scenarios do something 1 and do something 2 respectively for 1520 pcu/h and 54 km/hour. From the comparison of the three scenarios, it can be concluded that the development section of  Jalan T. Panglima Nyak Makam  continuation toward  Meunasah Manyang village reduce traffic volume, the degree of saturation, and VOC on Surabaya Bridges and Surabaya Junction significantly.Keywords: Vehicle Operating Cost, capacity, free flow speed, degree of saturation.Abstrak: Sebelum Jembatan Santan pada terusan jalan T. Panglima Nyak Makam selesai dibangun, maka jembatan Surabaya pada ruas jalan T Hasan Dek merupakan jalur utama untuk pergerakan dari ruas Jalan Tgk. Imum Lueng Bata - T. Hasan Dek - T. Iskandar Banda Aceh. Ruas jalan ini memiliki volume lalu lintas yang tinggi, karena ruas jalan ini menghubungkan pemakai jalan dari kawasan Lueng Bata - Ingin Jaya dan sekitarnya ke pusat pendidikan dan perkantoran yang berada di Kota Banda Aceh. Pada studi ini dilakukan kajian tentang penggunaan jalan alternatif dengan asumsi bahwa jembatan santan telah selesai dibangun dan pengaruhnya terhadap biaya operasional kendaraan (BOK). Data yang diambil pada penelitian ini adalah data volume lalu lintas, kecepatan lalu lintas dan unit-unit biaya kendaraan. Hasil analisis data, pada skenario do nothing diperoleh volume lalu lintas sebesar 1.571 smp/jam, kapasitas 1.427 smp/jam, kecepatan arus bebas 50 km/jam, derajat kejenuhan 1,10, serta BOK sebesar Rp. 2.975.114.800,- per tahun. Volume lalu lintas, derajat kejenuhan, dan penghematan BOK pada skenario do something 1 masing-masing sebesar 281 smp/jam, 0,18, dan Rp. 400.103.093,- per tahun. Volume lalu lintas, derajat kejenuhan, dan BOK pada skenario do something 2 masing-masing sebesar 530 smp/jam, 0,35, dan Rp. 756.817.075,- per  tahun. Sedangkan kapasitas dan kecepatan arus bebas pada skenario do something 1 dan do something 2 masing-masing sebesar 1.520 smp/jam dan 54 km/jam. Dari perbandingan ketiga skenario tersebut, maka dapat disimpulkan bahwa pembangunan ruas Terusan Jalan Panglima Nyak Makam menuju Desa Meunasah Manyang mengurangi volume lalu lintas, derajat kejenuhan, dan BOK pada Jembatan dan Simpang Surabaya.Kata kunci : Biaya Operasi Kendaraan, kapasitas, kecepatan arus, derajat kejenuhan.