Guilong Peng
Key Laboratory of The Three Gorges Reservoir Region’s Eco-Environment, Ministry of Education, Chongqing University, Chongqing, 400045, P. R. China Faculty of Urban Construction and Environmental Engineering, Chongqing University, Chongqing 400042, P.

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Relations between the Causative Factors of Waste and Their Preventive Measures in China Construction Sites Sulala M.Z.F AL-Hamadani; Luo qing; Guilong Peng; Miaocheng Weng
International Journal of Advances in Applied Sciences Vol 3, No 4: December 2014
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (352.59 KB) | DOI: 10.11591/ijaas.v3.i4.pp178-183

Abstract

Material waste has been considered as a major problem in the construction industry. Material waste not only has a negative impact on the success and efficiency of construction project, but also on construction cost, construction time, productivity and sustainability aspects. This paper aims to identify the major causative factors of material waste in China construction sites, their preventive measures and the relations between them. For this purpose, views of Chinese construction industry practitioners in Chongqing city were gathered by a questionnaire survey. The respondents were requested to rate a total of 34 causative factors of material waste and 9 preventive measures, which were gathered from previous literature. These causative factors were grouped into eight categories: Design, Handling, Procurement, Operation, Worker, Management, Site condition and External factors. The major causative factors of each category and preventive measures of waste were determined. Based on the identification of major factors and measures, the relations between them were also determined.