Sugiyanto Sugiyanto
Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

PERENCANAAN BENDUNG DAMAR KABUPATEN KENDAL, JAWA TENGAH Suhardi Suhardi; Yandi Purbangsa; Sri Eko Wahyuni; Sugiyanto Sugiyanto
Jurnal Karya Teknik Sipil Volume 3, Nomor 4, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (432.471 KB)

Abstract

Damar weir is a hydraulic structure which will construct in Pageruyung village, Kendal district. The objective of Damar weir construction is designed to fulfill the needs of irrigation water for the rice fields around the area. According to the analysis the flood discharge plan of Damar weir is 111 m3/sec with 50 years return period. The weir is using a rounded crest weir with effective width 23,7 m and height of the crest is 2,5 m. The length of the upstream apron floor is 3,0 m and uses the USBR Type IV stilling basin. The length of the sand trap is 40 m with the width of channel base 1,5 m. The time schedule of this project is 28 weeks and the budget plan is Rp 10.185.086.00,00 (Ten Billion, One Hundred And Eighty Five Million, Eighty Six Thousand Rupiah).
PERENCANAAN JEMBATAN PRATEGANG KALI SURU PEMALANG Achmad Santosa; Sugiyanto Sugiyanto; Y.I. Wicaksono; Indrastono Dwi Atmono
Jurnal Karya Teknik Sipil Volume 4, Nomor 4, Tahun 2015
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (762.473 KB)

Abstract

Suru bridge is located in the village of Suru, Bantar bolang, Pemalang linking local and regional Кesesi Bantar Bolang route its span 144 meters above the river suru. Suru bridge replacement is based on conditions that exceed the design life of the bridge, steel truss bridge already rusty and the effective width of the bridge that does not meet the standards to serve the transportation needs. On the condition of the bridge was originally designed using the bridge structure type steel frame, then in this final project design for the replacement bridge suru use this type of prestressed concrete structures. At this early stage analysis exsisting conditions, the structural design of the upper structure and sub structure as well as the calculation of the Budget Plan (RAB). Planning the structure take into account the burden that might occur that burden alone, additional dead load, traffic load, wind load and earthquake loads. In planning prosess carried out calculations using LRFD (Load and Resistance Factor Design) is then performed under the structural design with the initial steps do dimensioning abutments, pillars and foundation .For foundation wells are used caisson.
PERENCANAAN PANEN AIR HUJAN SEBAGAI SUMBER AIR ALTERNATIF PADA KAMPUS UNIVERSITAS DIPONEGORO Faisal Nurrohman; Satria Waskita Eka Paksi; Sri Sangkawati; Sugiyanto Sugiyanto
Jurnal Karya Teknik Sipil Volume 4, Nomor 4, Tahun 2015
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (572.924 KB)

Abstract

The design of rainwater harvesting is planned for alternative water source in UNDIP area and hopefully it can reduce the use of groundwater as the main source water to fill the demand of water in UNDIP area. The use of groundwater to fill the water demand in UNDIP campus for years 2014/2015 of 2,23 lt/dt it more than the optimum discharge are allowable to take the water wells is equal to 0,2-1 lt/dt. Based on that the planning of the rainwater harvesting building is made of with a volume of 245 m3 with a dimensions of 7m x 7m x 5m and dimensions of infiltration wells with a diameter of 1,5 and depth of 3m. Planning of the rain water harvesting in the UNDIP area the cost of Rp 275.465.000 with the process of work for 29 days.