Bambang Riyanto
Jurusan Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH. Tembalang, Semarang 50275

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS KINERJA RUAS-RUAS JALAN LINGKUNGAN DENGAN MODEL PEMBEBANAN LALU LINTAS MENGGUNAKAN EMME 3.4.1 (STUDI KASUS : KABUPATEN SUKAMARA, KALIMANTAN TENGAH) Ahmad Haris Januar Syahidan; Reza Maulana; Bambang Riyanto; Kami Hari Basuki
Jurnal Karya Teknik Sipil Volume 5, Nomor 2, Tahun 2016
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (770.843 KB)

Abstract

Kabupaten Sukamara is a currently growing Kabupaten, especially Kecamatan Balai Riam and Kecamatan Permata Kecubung, but the location is difficult to reach and can be said isolated. One of the aspect that can improve and develop Kabupaten Sukamara is transportation, because the transportation facilities and infrastructure that exist currently is very low in Kabupaten Sukamara, in this case, especially the road which connects the villages because the lack of road development as a rural access. The methodology used for analyze the performance of the road is by calculate the number of trip generation based on the population of study area based on method developed by the Ministry of Public Works for planning transportation of urban road which belong to the small town category. The next step is to analyze the amount of trip that generates Origin Destination Matrice (OD) by using Double Constrain Gravity method (DCGR), assign OD matrice to the road network by using EMME 3.4.1 and calculate the road capacity,then calculate and analyze volume capacity ratio (VCR) based on the assignment result and the road capacity calculation. By determining the 20 year plan, the prediction of trip generation of Kabupaten Sukamara is 235.023 people/day. Based on OD matrice, can be known that the closer the distance trip, the greater the trip that occur and vice versa. From the calculation, the capacity of the collector road is 1.197 smp/hour, local road is 856 smp/hour and small road is 838 smp/hour. From the assignment result, the largest trip volume is 314 smp/hour and the smallest is 1 smp/hour, so the largest VCR value is 0,279 which means VCR < 0,8 for every road that connects the villages. Therefore, the performance condition of the entire road that connects the villages can be concluded stable/safe.
ANALISIS PENGARUH MUATAN LEBIH (OVERLOADING) TERHADAP KINERJA JALAN DAN UMUR RENCANA PERKERASAN LENTUR (STUDI KASUS RUAS JALAN RAYA PRINGSURAT, AMBARAWA-MAGELANG) G. Irwan Simanjuntak; Adri Pramusetyo; Bambang Riyanto; Supriyono Supriyono
Jurnal Karya Teknik Sipil Volume 3, Nomor 3, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (514.743 KB)

Abstract

Roads Bawen - Pringsurat, is part of road connecting the center of national economic activities. Highway Bawen - Pringsurat many crossed by heavy vehicles with a charge by overloadin. Besides that also increase traffic on a street Bawen - Pringsurat. From the observation volume of traffic on Bawen - Pringsurat in 2014 is worth 1.462,60 smp /hours with value DS 0,49. The predictions in the 2024 thought to be 2.332,97 smp / hours, so acquired value DS 0,78. An analysis of existing pavement is using two types of burden that is the burden of standard ( with reference to a sum of the load that it allowed or JBI ) and the burden of factual ( the survey ). Burden vehicle standard had class road MST 10 tons while with to load factual in railroad scale it reached MST 12 tons. The result analysis shows pavement existing structure can just hold both overload 5,6 years of age plan for 10 years. Calculation shows that roads Bawen - Pringsurat needed- thick layer by 2,9 cm ( added to load standard ) and to 5.6 cm (added to load factual). Based on the result analysis loads factual in the field and suggested should be on vehicle in 2 directions railroad scale Pringsurat.