IMPLEMENTASI METODE 5S PADA LEAN SIX SIGMA DALAM PROSES PEMBUATAN MUR BAUT VERSING (Studi Kasus di CV. Desra Teknik Padang) Adriansyah, Adriansyah; Muchtiar, Yesmizarti; Noviyarsi, Noviyarsi
Jurnal Teknik Industri Vol 9, No 1 (2007): JUNE 2007
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (211.589 KB) | DOI: 10.9744/jti.9.1.pp. 63-74

Abstract

The objective of this research was to minimize processing time in manufacturing using 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) method. As well as quality, processing time is one of the important points to consider. Improvement had been done in every step of the process to achieve 3.4 defect per million (DPM). Although 6s had not been achieved yet, but 5S method in Lean Sigma have already improved the production process Abstract in Bahasa Indonesia : Penelitian ini bertujuan untuk memperlihatkan penggunaan Metoda 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) dalam meminimalkan waktu proses pembuatan produk. Selain kualitas produk, waktu proses merupakan hal yang penting untuk diperhatikan. Perbaikan dari setiap proses dilakukan agar didapat 3,4 kegagalan persejuta (DPM). Walaupun 6s belum tercapai, tapi penerapan metoda 5S dalam Lean Sigma sudah menunjukkan perbaikan pada proses yang dilakukan. Kata kunci: 5S, six sigma, lean sigma
PENYUSUNAN ULANG AREA KERJA PRODUKSI MESIN THRESSER UNTUK PERCEPATAN PROSES Noviyarsi Noviyarsi; Lestari Setiawati
JISI: Jurnal Integrasi Sistem Industri Vol 1, No 1 (2014): JISI UMJ
Publisher : Fakultas teknik Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jisi.1.1.%p

Abstract

Permasalahan yang umum dihadapi oleh industri kecil menengah adalah kemampuan untuk menghasilkan produk dengan kualitas baik dengan harga yang bersaing di pasaran. Hal ini dikarenakan proses produksi yang belum terstandarisasi dan area kerja yang tidak tertata sehingga berdampak pada banyaknya pemborosan pada area kerja. Tujuan penelitian ini adalah menyusun ulang area kerja mesin thresser untuk percepatan proses. Metode yang digunakan dalam penelitian ini adalah lean six sigma dan 5S. Penggunaan kedua metode ini akan dapat meminimasi aktivitas, material, komponen dan spare part yang berada pada area produksi sehingga waktu proses menjadi lebih cepat, area kerja dimanfaatkan dengan optimal dan lingkungan kerja menjadi lebih rapi dan teratur. Hasil analisis dengan lean six sigma memperlihatkan bahwa efisiensi siklus proses 0.84%, dengan peningkatan kecepatan proses 7.9%. Hasil analisis terhadap area kerja terdapat 5 area kerja yang memerlukan perbaikan susunan area yaitu area storage, mesin potong plat, mesin potong besi, mesin rolling dan mesin compressor.
IMPLEMENTASI ACTIVITY BASED COSTING UNTUK PENENTUAN HARGA POKOK PRODUKSI CAKE BUAH NAGA MOCHA Noviyarsi Noviyarsi; Ayu Bidiawati; Eni Kurniati
JISI: Jurnal Integrasi Sistem Industri Vol 4, No 2 (2017): JISI UMJ
Publisher : Fakultas teknik Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jisi.4.2.99-106

Abstract

Harga pokok produksi (HPP) yang tepat akan menentukan kemampuan bersaing produk. Metode ABC merupakan salah satu metode untuk menentukan HPP berdasarkan pembebanan biaya pada aktivitas. Penelitian ini bertujuan untuk menentukan HPP cake buah naga mocha pada CV. Bakery X. Perhitungan HPP dengan metode ABC dilakukan dalam dua tahapan. Tahap pertama dilakukan pembebanan biaya terhadap aktivitas dan tahap kedua merupakan pembebanan biaya terhadap produk. Hasil metode ABC memperlihatkan bahwa HPP cake buah naga mocha adalah RP. 41.617,- per kotak. Hasil ini juga menunjukkan bahwa harga pokok produksi dengan metode ABC lebih rendah 16,8% bila dibandingkan dengan HPP yang dihitung oleh CV Bakery X.
PERANCANGAN TATA LETAK FASILITAS PRODUKSI MESIN THRESSER UNTUK MEMINIMASI ONGKOS MATERIAL HANDLING Noviyarsi Noviyarsi; Lestari Setiawati; Deno Sandra
JISI: Jurnal Integrasi Sistem Industri Vol 1, No 2 (2014): JISI UMJ
Publisher : Fakultas teknik Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jisi.1.2.%p

Abstract

Perancangan tata letak fasilitas merupakan aktifitas yang sangat penting dalammerencanakan sebuah fasilitas baru maupun yang bersifat perencanaan ulang. Tata letakfasilitas yang dirancang dengan baik pada umumnya akan memberikan kontribusi yangpositif dalam optimalisasi proses operasi.Tujuan penelitian ini adalah perancanganulangtata letak fasilitas produksimesin thresser untukmeminimasi ongkos material handling.Hasil penyeimbangan lintasan produksi dengan metode Rank Positional Weightmemperlihatkan penurunan balanced delay dari 63,89% pada kondisi awal menjadi15.14% pada kondisi usulan dengan efisiensi lintasan 84.86%. Hasil re-layoutmemperlihatkan pengurangan jarak perpindahan sebesar 24.98% dan penurunan ongkosmaterial handling (OMH) sebesar 24.17%.
IMPLEMENTASI METODE 5S PADA LEAN SIX SIGMA DALAM PROSES PEMBUATAN MUR BAUT VERSING (Studi Kasus di CV. Desra Teknik Padang) Adriansyah Adriansyah; Yesmizarti Muchtiar; Noviyarsi Noviyarsi
Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri Vol. 9 No. 1 (2007): JUNE 2007
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (211.589 KB) | DOI: 10.9744/jti.9.1.63-74

Abstract

The objective of this research was to minimize processing time in manufacturing using 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) method. As well as quality, processing time is one of the important points to consider. Improvement had been done in every step of the process to achieve 3.4 defect per million (DPM). Although 6s had not been achieved yet, but 5S method in Lean Sigma have already improved the production process Abstract in Bahasa Indonesia : Penelitian ini bertujuan untuk memperlihatkan penggunaan Metoda 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) dalam meminimalkan waktu proses pembuatan produk. Selain kualitas produk, waktu proses merupakan hal yang penting untuk diperhatikan. Perbaikan dari setiap proses dilakukan agar didapat 3,4 kegagalan persejuta (DPM). Walaupun 6s belum tercapai, tapi penerapan metoda 5S dalam Lean Sigma sudah menunjukkan perbaikan pada proses yang dilakukan. Kata kunci: 5S, six sigma, lean sigma
Potensi Briket Arang Berbahan Sekam Sebagai Energi Alternatif Noviyarsi Noviyarsi; Dessi Mufti; Fuji Kurniawan Jafri
Seminar Nasional Teknologi Informasi Komunikasi dan Industri 2015: SNTIKI 7
Publisher : UIN Sultan Syarif Kasim Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (406.01 KB)

Abstract

Nowadays, it’s time to focus on renewable energy because of decreased in oil, charcoal and gas production. One of renewable energy to substituted oil and gas is briquette by using paddy husk as material. Potential of paddy husk which produced from rice milling is about 20-30%, bran about 8-12% and rice about 50-63.5%. The purpose of this research was to analyzed potential of husk charcoal briquette as renewable energy. This research method was experiment. Pyrolysis process has been done using conventional pyrolysis tool. Adhesive used to make briquette was adhesive starch which composition of starch and water was 1:16. Composition of husk charcoal and starch was tested in 2 compositions that are 1:8% and 1:10%. Result of caloric value show that briquette with composition 1:8% gave the highest caloric value about 5.580,19 kal/gr. It means that this value fulfill SNI standard with minimum caloric value was 5.000 kal/gr.Keywords: charcoal briquette, paddy husk, renewable energy.
ANALISIS PENGARUH FAKTOR-FAKTOR PRODUKTIVITAS KERJA PROYEK KONSTRUKSI DENGAN RELATIVE IMPORTANCE INDEX (RII) DAN REGRESI LINEAR BERGANDA Noviyarsi Noviyarsi; M. Nursyaifi Yulius; Yusrizal Bakar; Eva Suryani
JISI: Jurnal Integrasi Sistem Industri Vol 10, No 1 (2023): JISI UMJ
Publisher : Fakultas teknik Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jisi.10.1.27-38

Abstract

ABSTRAKIndustri konstruksi termasuk industri dengan jumlah pekerja yang besar. Pada masa pandemi COVID-19 industri konstruksi ikut terkena dampaknya dengan dihentikan dan ditundanya berbagai proyek pembangunan seperti jembatan, gedung dan sebagainya. Saat ini industri konstruksi kembali menggeliat dengan dimulainya berbagai proyek pembagunan. Pelaksanaan pekerjaan konstruksi tidak terlepas dari berbagai kendala yang dapat mempengaruhi produkvitas pekerjaan konstruksi baik dari segi waktu pelaksanaan dan kualitas pekerjaan. Tujuan penelitian ini adalah menganalisis faktor-faktor yang mempengaruhi produktivitas proyek konstruksi di Kota Padang. Metode yang digunakan dalam penelitian ini  adalah Relative Importance Index (RII) dan Analisis Regresi. Pengumpulan data dilakukan melalui penyebaran kuesioner kepada pihak yang terlibat dalam proyek konstruksi. Hasil penelitian mengidentifikasi sebanyak 10 faktor dengan 45 variabel yang mempengaruhi produktivitas kerja proyek konstruksi di kota Padang. Hasil RII menunjukkan 9 variabel sangat mempengaruhi produktivitas kerja proyek konstruksi dengan nilai RII berkisar antara 84,2%-89.6%. Hasil penelitian juga memperlilhatkan 4 faktor yang paling mempengaruhi produkvitas kerja yaitu manajemen, motivasi, tenaga kerja dan teknis dengan nilai RII berkisar antara 80.3%-84.9%. Hasil model regresi memperlihatkan bahwa faktor eksternal merupakan faktor yang paling dominan mempengaruhi produktivitas kerja dengan koefisien sebesar 1,235.  Faktor  dominan lainnya adalah faktor teknis, faktor lingkungan dan kondisi kerja, faktor material dan peralatan serta faktor motivasi. Kata kunci: Faktor Produktivitas, Proyek Konstruksi, Relative Importance Index, Metode Regresi  ABSTRACTThe construction industry is an industry with a large number of workers. During the COVID-19 pandemic, the construction industry was affected by the postponing of various construction projects such as bridges, buildings and so on. Currently, the construction industry is back on track with the start of various construction projects. The implementation of construction work is inseparable from various obstacles that can affect construction project productivity work in terms of completion time and work quality. The purpose of this research was to analyze factors affecting construction project productivity at Padang city. The method used was Relative Importance Index (RII) and Regression Analysis. Data collection was carried out by distributing questionnaires to the parties involved in the construction project. The results identified 10 factors and 45 variables that affecting construction projects productivity. The RII results show 9 variables that highly affect construction projects productivity with RII between 84.2% -89.6%. The results also show 4 factors that most affect construction project productivity, there  were management, motivation, labor and technique with RII between 80.3%-84.9%. Regression model shows that external factor was the most dominant factors influencing work productivity along with technical factors, environmental and working conditions factors, material and equipment factors and motivational factors. Keywords: Produvtivity factors, construction project, Relative Importance Index, Regression Method
Analisis Penyebab Cacat Produksi padaPerusahaan Percetakan dengan Failure Mode anf Effect Analysis dan Fault Tree Analysis Noviyarsi; Yesmizarti Muchtiar; Wahyu Syukra Alhamda
Jurnal ARTI (Aplikasi Rancangan Teknik Industri) Vol. 18 No. 1 (2023): Jurnal ARTI : Aplikasi Rancangan Teknik Industri
Publisher : Sekolah Tinggi Teknologi Dumai

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (360.136 KB) | DOI: 10.52072/arti.v18i1.536

Abstract

Pengendalian kualitas proses produksi penting untuk meminimasi terjadi kegagalan selama proses berjalan. CV. X merupakan perusahaan percetakan yang memproduksi salah satunya notepad. Dalam proses produksi notepad ditemukan sejumlah cacat seperti robek, potongan tidak rapi, hasil cetak miring dan tinta berceceran. Tujuan penelitian ini adalah menganalisis potensi kegagalan pada proses produksi notepad dengan menggunakan FMEA dan FTA. Hasil akhir penelitian memperlihatkan bahwa pembuatan instruksi kerja, perbaikan ukuran meja mesin potong, perbaikan pencahayaan dan penjadwalan preventif maintenance perlu dilakukan agar kegagalan selama proses dapat diminimasi.