This Author published in this journals
All Journal Jurnal Titra
Tommy Alvianto Ongkodjojo
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Penjadwalan Produksi Pakan Ternak di PT Charoen Pokphand Indonesia Sepanjang Ongkodjojo, Tommy Alvianto; Palit, Herry Christian
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT Charoen Pokphand Indonesia Sepanjang is an animal feed production company. Schedulling that is done by PPIC Departement focus only on animal feed code and quantity. Schedulling animal feed for every pellet machine do not arranged yet, so the setup time for every machine is high. Schedulling system updates had been done with LRPT (longest remaining processing time) method. Schedulling system that had been made can reduce the production setup time and time to finish all animal feed. The time to finish all animal feed can be reduced 4,87% after implemented schedulling system. Different time for company with schedulling system can produce 124,2 tonnage animal feed. Percentage setup machine decrease 5,88% for machine 1, 35,71% for machine 2 and 50% for machine 4. Percentage setup machine increase 22,22% for machine 3.
Penjadwalan Produksi Pakan Ternak di PT Charoen Pokphand Indonesia Sepanjang Tommy Alvianto Ongkodjojo; Herry Christian Palit
Jurnal Titra Vol 2, No 2 (2014)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (206.183 KB)

Abstract

PT Charoen Pokphand Indonesia Sepanjang is an animal feed production company. Schedulling that is done by PPIC Departement focus only on animal feed code and quantity. Schedulling animal feed for every pellet machine do not arranged yet, so the setup time for every machine is high. Schedulling system updates had been done with LRPT (longest remaining processing time) method. Schedulling system that had been made can reduce the production setup time and time to finish all animal feed. The time to finish all animal feed can be reduced 4,87% after implemented schedulling system. Different time for company with schedulling system can produce 124,2 tonnage animal feed. Percentage setup machine decrease 5,88% for machine 1, 35,71% for machine 2 and 50% for machine 4. Percentage setup machine increase 22,22% for machine 3.