Heni Suparti
Unknown Affiliation

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : PubBis : Jurnal Pemikiran dan Penelitian Administrasi Publik dan Administrasi Bisnis

RESPON PUBLIK TERHADAP IMPLEMENTASI UNDANG-UNDANG NOMOR 22 TAHUN 2009 TENTANG LALU LINTAS DAN ANGKUTAN JALAN (Studi Kasus: Penggunaan Jalan Nasional Oleh PT.Conch South Kalimantan Cement di Kabupaten Tabalong) Heni Suparti
Jurnal PubBis Vol 3 No 1 (2019)
Publisher : stiatabalong.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (623.096 KB)

Abstract

This study aims to find out the implementation of Law Number 22 year of 2009 on Traffic and Road Transportation against National Road Misuses conducted by PT.Conch South Kalimantan Cement. And find out the public responses to the problems in the forms of national road damages occuring due to very heavy loads carried by the cement transports of PT.Conch South Kalimantan Cement. This study used descriptive qualitative method. The research locations were along the national road damaged by the cement transport in Tabalong Regency. The sampling technique used purposive sampling which is selected with consideration and certain purposes. The informants in this research were public policy actors. Data collection used observations, interviews, and documentation. The data analysis technique used an interactive model. The result of the research showed that the implementation of Law Number 22, Year of 2009 was still not effective, because there were obstacles in the implementation. Some of them were the limitation of authority among implementers, and the lack of facilities to support the implementation of the policy. The responses of the public policy actors in responding to the problems of road damages caused by the cement transports were to continue controlling the cement transports and also to request responsibilities, either directly or indirectly to the related company, and review the impacts caused by the existence of the cement company. Keywords: implementation; public responses.
FUNGSI BADAN PERMUSYAWARATAN DESA PADA ASPEK PENGAWASAN UNTUK MENINGKATKAN KINERJA KEPALA DESA DI DESA TAKULAT KECAMATAN KELUA KABUPATEN TABALONG Heni Suparti
Jurnal PubBis Vol 5 No 2 (2021)
Publisher : stiatabalong.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (825.674 KB) | DOI: 10.35722/pubbis.v5i2.451

Abstract

Based on the Peraturan Menteri Dalam Negeri Number 110, the Village Consultative Body has the function of supervising the performance of the Village Head, the supervision as intended is carried out through planning, implementing and reporting on the administration of village governance. In carrying out the supervisory function of the Village Consultative Body on the planning, implementation and reporting of village administration, it is intended as a preventive effort so that the village government in carrying out village government does not make deviations. This study aims to determine the function of the village consultative body in the aspect of supervision to improve village heads. This study used descriptive qualitative method. Data collection techniques used in-depth interviews, with data validity using data triangulation. The data analysis technique uses an interactive model through the stages: data condensation, data presentation, and drawing conclusions. The results showed that the function of the village consultative body in the aspect of supervision to improve the performance of the Village Head in Takulat Village, Kelua District, Tabalong Regency had been implemented "quite well".
Tingkat Partisipasi Masyarakat Dalam Musyawarah Perencanaan Pembangunan Di Desa Maburai Kecamatan Murung Pudak Kabupaten Tabalong Siti Arbayah; Heni Suparti
Jurnal PubBis Vol 6 No 1 (2022)
Publisher : stiatabalong.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (637.157 KB) | DOI: 10.35722/pubbis.v6i1.516

Abstract

Regional development planning is the implementation of community participatory development planning based on Law Number 25 of 2004 concerning the National Development Planning System (SPPN). Two approaches to development planning in the SPPN are top-down and bottom-up participatory development planning. Regional development planning by involving bottom-up communities is carried out with the musrenbang mechanism starting from the village, sub-district, district and provincial levels. At the village level, this deliberation is called the Village Development Planning Deliberation (Musrenbangdes). Musrenbangdes provides broad opportunities for village communities to participate in development planning and discuss problems faced and alternative solutions at the village level. This study aims to determine the power or degree of community participation in the implementation of the Maburai Village Development Planning Meeting, Murung Pudak District, Tabalong Regency. The method used by the researcher is descriptive quantitative, with the sampling technique that will be used in this study is non-random sampling (non-probability sampling), namely purposive sampling. The results showed that the level of community participation in the development planning deliberations in Maburai Village reached the sixth rung of the ladder, namely the Partnership ladder, or up to the degree of Community Power (citizen power). At the rung of the Partnership ladder, the community can negotiate with the policy makers, namely the village government. At this level, the community is not only given the space to have a voice, but also the power to make decisions.