Program Perhitungan RAB Pekerjaan Struktur Baja (WF BEAM) Menggunakan Bahasa Python Ravika Nur Melinda; Laisita Meitya Ningrum; Ida Bagus Suryabrata; Gede Swarna Bayu Artha Dwipa; Tyas Pratama Sukoco
TIERS Information Technology Journal Vol. 2 No. 1 (2021)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (400.985 KB) | DOI: 10.38043/tiers.v2i1.2838

Abstract

ABSTRACT Making a budget plan in a project is often done manually which of course takes a long time to complete. In determining the budget plan, there are many types of work such as preparatory work, reinforced concrete work, and steel work, so it is quite difficult to work on. The budget plan can only be done by experts in the field, so it requires quite expensive processing costs. From the problems described above, we need a program that can simplify the calculation of the budget plan, especially in steel works (WF Beam). In this case, we created a program using the python language that needed to input some data such as rod length, number of bars, type of steel, steel prices, and work wages so that it would immediately produce a value or amount of the volume and price of a steel work that could help contractors especially steel subcontractors in calculating steel work (WF Beam). Keywords: python, RAB, WF beam, work volume, job price. ABSTRAK Pembuatan rencana anggaran dan biaya dalam sebuah proyek sering dilakukan secara manual yang tentunya membutuhkan waktu yang cukup lama untuk menyelesaikannya. Dalam menentukan rencana anggaran dan biaya, ada banyak jenis pekerjaan seperti pekerjaan persiapan, pekerjaan beton bertulang, dan pekerjaan baja, sehingga cukup sulit untuk dikerjakan. Rencana anggaran dan biaya juga hanya bisa dikerjakan oleh tenaga ahli pada bidang tersebut sehingga membutuhkan biaya pengerjaan yang cukup mahal. Dari permasalahan yang sudah dijabarkan diatas maka dibutuhkan sebuah program yang dapat mempermudah perhitungan rencana anggaran dan biaya khususnya di pekerjaan baja (WF Beam). Dalam hal ini, kami membuat sebuah program menggunakan bahasa python yang perlu menginputkan beberapa data seperti panjang batang, jumlah batang, jenis baja, harga baja, dan upah pekerjaan sehingga akan langsung menghasilkan nilai atau besaran dari volume dan harga suatu pekerjaan baja yang dapat membantu kontraktor khususnya sub kontraktor baja dalam melakukan perhitungan pekerjaan baja (WF Beam). Kata kunci: python, RAB , WF beam, volume pekerjaan, harga pekerjaan.
Program Perhitungan RAB Pekerjaan Struktur Baja (WF BEAM) Menggunakan Bahasa Python Ravika Nur Melinda; Laisita Meitya Ningrum; Ida Bagus Suryabrata; Gede Swarna Bayu Artha Dwipa; Tyas Pratama Sukoco
TIERS Information Technology Journal Vol. 2 No. 1 (2021)
Publisher : Universitas Pendidikan Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (400.985 KB) | DOI: 10.38043/tiers.v2i1.2838

Abstract

ABSTRACT Making a budget plan in a project is often done manually which of course takes a long time to complete. In determining the budget plan, there are many types of work such as preparatory work, reinforced concrete work, and steel work, so it is quite difficult to work on. The budget plan can only be done by experts in the field, so it requires quite expensive processing costs. From the problems described above, we need a program that can simplify the calculation of the budget plan, especially in steel works (WF Beam). In this case, we created a program using the python language that needed to input some data such as rod length, number of bars, type of steel, steel prices, and work wages so that it would immediately produce a value or amount of the volume and price of a steel work that could help contractors especially steel subcontractors in calculating steel work (WF Beam). Keywords: python, RAB, WF beam, work volume, job price. ABSTRAK Pembuatan rencana anggaran dan biaya dalam sebuah proyek sering dilakukan secara manual yang tentunya membutuhkan waktu yang cukup lama untuk menyelesaikannya. Dalam menentukan rencana anggaran dan biaya, ada banyak jenis pekerjaan seperti pekerjaan persiapan, pekerjaan beton bertulang, dan pekerjaan baja, sehingga cukup sulit untuk dikerjakan. Rencana anggaran dan biaya juga hanya bisa dikerjakan oleh tenaga ahli pada bidang tersebut sehingga membutuhkan biaya pengerjaan yang cukup mahal. Dari permasalahan yang sudah dijabarkan diatas maka dibutuhkan sebuah program yang dapat mempermudah perhitungan rencana anggaran dan biaya khususnya di pekerjaan baja (WF Beam). Dalam hal ini, kami membuat sebuah program menggunakan bahasa python yang perlu menginputkan beberapa data seperti panjang batang, jumlah batang, jenis baja, harga baja, dan upah pekerjaan sehingga akan langsung menghasilkan nilai atau besaran dari volume dan harga suatu pekerjaan baja yang dapat membantu kontraktor khususnya sub kontraktor baja dalam melakukan perhitungan pekerjaan baja (WF Beam). Kata kunci: python, RAB , WF beam, volume pekerjaan, harga pekerjaan.
Evaluasi Jenis Kerusakan Jalan menggunakan Metode PCI dan Bina Marga (Studi Kasus : Jalan Gunung Agung Denpasar) Dewa Ayu Putu Adhiya Garini Putri; Ida Bagus Suryabrata; Putu Ariawan; I Komang Agus Ariana
Potensi: Jurnal Sipil Politeknik Vol 24 No 2 (2022): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35313/potensi.v24i2.4139

Abstract

Tingginya arus lalu lintas pada jalan Gunung Agung Denpasar merupakan salah satu jalan kolektor kelas utama yang memiliki tingkat kepadatan lalu lintas yang tinggi yang sehingga menyebabkan peningkatan kerusakan jalan area tersebut. Penelitian ini dilakukan dengan mengevaluasi perbandingan metode Pavement Condition Index dengan Bina Marga. Pada tahap survei, ruas Jalan Gunung Agung sepanjang 2,46 km dibagi menjadi 25 bagian. Berdasarkan hasil survei pada 25unit sampel Jalan Gunung Agung didapat kerusakan berupa Pelepasan Butir (Raveling) terjadi sebesar 72,91%, Retak Memanjang (Longitudinal Cracking) terjadi sebesar 11,26%, Tambalan (Patching) 10,35%., Lubang (Potholes) 2,39%., Amblas (Depression) 1,532%., Alur (Rutting) 0,907%, Retak Buaya (Aligator Crack) 0,607%, Pengausan (Weathering) terjadi sebesar 0,028%. Program penanganan Jalan Gunung Agung Denpasar pada metode PCI didapatkan penanganan tambalan dan lapis tambahan pada segmen 2-6 dan segmen lainnya berada dalam penanganan pemeliharaan rutin. Sedangkan pada metode Bina Marga didapatkan penanganan berkala hanya pada segmen 3,4 dan 6 serta segmen lainnya berada dalam penanganan rutin. Dari hasil perbandingan antara kedua metode tersebut, hasil yang didapat memiliki hasil yang hampir sama. Namun dikarenakan pada metode PCI memiliki analisa yang lebih mendetail dan obyektif terkait segala aspek kerusakannya, maka disarankan untuk menggunakan program pemeliharaan berdasarkan hasil metode Pavement Condition Index.