This Author published in this journals
All Journal PROCEEDING STIMA
Jahar Irawan
Universitas Majalengka

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

METODE PELAKSANAAN DAN ESTIMASI BIAYA PELAKSANAAN PROYEK KONTRUKSI PEMBANGUNAN GEDUNG SATPOL PP KABUPATEN MAJALENGKA Jahar Irawan
PROCEEDING STIMA Seminar Teknologi Majalengka 3.0
Publisher : PROCEEDING STIMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (287.327 KB)

Abstract

Estimation, in the general sense, is an attempt to assess or estimate a value through calculation analysis and based on experience. Likewise, with the estimated cost in a construction project, it is certainly intended to estimate the value of financing a project.The construction cost analysis process is a process for estimating direct costs which are generally used as a basis for bidding. One method used to estimate construction costs is to calculate in detail the unit price of work based on index or coefficient values for analysis of material costs and worker wages. The construction project of the Satpol PP building in Majalengka Regency is located on Jl. Raya Tonjong - Pinangraja No. 50, in Cicenang Village, Cigasong District, Majalengka District, West Java. with a contract value of Rp. 2,454,894,000.00 within 150 calendar daysÂ