Claim Missing Document
Check
Articles

Found 2 Documents
Search

Redesign of Mobility Aids for Spastic Diplegic Cerebral Palsy Children Through Collaboration Among Academics - Medical Devices Industry and User Intitutions Lobes Herdiman IPM; Susy Susmartini; Taufiq Rochman
Logic : Jurnal Rancang Bangun dan Teknologi Vol 20 No 1 (2020): March
Publisher : Pusat Penelitian dan Pengabdian kepada Masyarakat (P3M) Politeknik Negeri Bali

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (893.886 KB) | DOI: 10.31940/logic.v20i1.1725

Abstract

Cerebral palsy (CP) children are part of the neuro disability spectrum in impaired brain function. The etiological understanding of CP children for primary prevention and early treatment can reduce the effects of damage to brain function. CP children with cerebral diplegia are motor developmental disorders caused by damage to the brain characterized by weakness in the lower limbs heavier than the upper limbs. The walker product is designed through a universal design approach to provide as much as possible mobility to CP children in general. A universal design approach to the walker products through the triple helix collaboration included academic, medical devices industry and user institutions. Three subjects with spastic CP cerebral diplegia children underwent gait training using a walker. Gait performance (continuous walking distance, and maximum and comfortable walking speed) and energy expenditure are measured at the end of the 1-week training session. The purpose of the pediatric walker redesign is to facilitate mobilization of the position of the child's body CP in the anterior and posterior positions. The walker design can be removed from the raft back and forth from both sides at the front. At a certain time, the walker can be positioned behind the user according to the recommendations of some physiotherapy practitioners. This design also facilitates the position of CP children in order to be more precise, reducing double support during ambulation and increasing walking speed. The anterior-posterior walker as an ADVANCED walker for CP children provides the most appropriate position because it provides the best gait pattern and consumes less energy.
Perancangan Alat Pengaduk pada Proses Pemasakan Rambak Kulit Sapi untuk Meningkatkan Kualitas dengan Metode Partisipatif Stephani Diesya Floratiara; Lobes Herdiman; Susy Susmartini
Performa: Media Ilmiah Teknik Industri Vol 18, No 2 (2019): Performa: Media Ilmiah Teknik Industri
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (757.873 KB) | DOI: 10.20961/performa.18.2.25216

Abstract

Tingginya waktu proses dan defect pada produksi rambak kulit sapi menyebabkan IKM rambak tidak dapat memenuhi permintaan pasar. Permasalahan waktu yang tinggi pada proses pengungkepan menyebabkan kelelahan pekerja sehingga pengadukan menjadi tidak konstan dan rambak mengalami pecah (defect) dengan tingkat defect mencapai 20% dari hasil produksi. Penelitian ini bertujuan untuk mereduksi waktu dan defect pada pengungkepan dengan merancang alat pengaduk berbasis TTG menggunakan pendekatan partisipatif. Alat pengaduk yang dirancang memiliki 5 komponen utama yaitu rangka, penggerak, transmisi, speed reducer, dan pengaduk. Kelayakan dalam pembuatan alat dianalisis menggunakan perhitungan investasi dengan nilai payback period (PBP) 0,427 bulan, net present value (NPV) Rp 149.296.091,76, internal rate return (IRR) 32% dan profitability index (PI) 26,07. Hasil rancangan kemudian dinyatakan dalam bentuk fisik dan diterapkan pada IKM rambak kulit sapi “Pak Dul” Jagalan, Surakarta. Dari pengujian alat didapatkan hasil putaran adukan 20 rpm dengan beban maksimal 15 kg dan nilai torsi 423,15 kg.cm. Hasil rambak pengungkepan jam ke-4 dengan alat memiliki nilai kualitas hampir sama dengan hasil rambak pengungkepan manual 7 jam. Sedangkan tingkat defect menurun 15%, produktivitas meningkat 15%, kuantitas produksi meningkat 50% dan profit meningkat 65%.