p-Index From 2019 - 2024
0.444
P-Index
This Author published in this journals
All Journal JURNAL INTEGRASI
Ridwan Ridwan
Politeknik Negeri Batam

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Preliminary Study of the Vertical Axis Wind Turbine (VAWT) Prototype at Urban Area Irwanto Zarma Putra; Fauzun Atabiq; Didi Istardi; Ridwan Ridwan; Arif Febriansyah Juwito; Muhammad Agil Wildan; Muhammad Ridlo Alfianto; Rahman Hakim
JURNAL INTEGRASI Vol 13 No 1 (2021): Jurnal Integrasi - April 2021
Publisher : Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/ji.v13i1.2754

Abstract

This research complements the shortcomings of PLTB, namely by adding a Monitoring System to the Wind Power Plant at Batam State Polytechnic. By addition of sensors, installations, and a control panel containing instruments for monitoring wind conditions, Savonius turbine rpm, and pico-generator output electrical characteristics. The method used is conventional, starting from mechanical design, program development, and installation to testing. This study's preliminary results indicate that wind at the PLTB Polibatam location is not continuous. It does not occur, even though the maximum wind speed can reach 8.9 m / s. The implementation of the savonius-type wind turbine in this study can generate electricity around 87.83 kW / week or about 0.61 kW / hour.
Automatic Continuity Test Machine (CT) Using Proximity Sensors, Photoelectric Sensors and Programmable Logic Controllers (PLC) Systems: The case at PT. ā€œVā€ Batam Indonesia Jhon Hericson Purba; Irwanto Zarman Putra; Ridwan Ridwan; Hari Salam
JURNAL INTEGRASI Vol 15 No 1 (2023): Jurnal Integrasi - April 2023
Publisher : Pusat Penelitian dan Pengabdian Masyarakat Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/ji.v15i1.5075

Abstract

Continuity test Machine (CT) is a tool for detecting damage to the current connection on the AC plug cable. The problem with PT ā€œVā€ is that it still uses a manual system. So that it is updated to an automatic continuity test machine by manual measurement using a "caliper" and another using an automatic continuity test machine (CT). The results obtained (CT) using a proximity sensor, photoelectric as a detector for the length of the pin connector and a Programmable Logic Control (PLC) system as a controller. Testing the accuracy of the tool using 12 plug and connector samples were the same, namely 10 plug and connector samples that were standard (19.05 +_0.2 mm) and 2 samples that were not standard. Tool performance testing is carried out operating for 184 hours or 23 working days. The results of data analysis found a significant increase, namely an average of 25.94% of the total test results used by the manual Continuity test machine (CT). Totally capable of increasing an average of 970 product units per month, with details reducing by -20.03% good products, increasing by 26.74% good products (standard)