This study aims to determine the status of the cable condition to the emergence voltage of Partial Discharge, as well as the status of the cable to discharge the Partial Discharge. Measurements were made at PT PLN (Persero) UP3 Menteng on TD 09-PM 4A Segment Goat Feeders. This research uses a descriptive method. This study carried out measurements of the release of charge and voltage at each phase in the segment. After measuring the discharge of a single segment, data analysis is then performed to determine the value of Partial Discharge, then the value is accumulated to conclude the condition of cable failure risk that refers to standards set by PLN.The results showed that the status of the cable to the voltage appears Partial Discharge. PDIV value of 17.3 kV can be interpreted PDIV> Uo. PDEV value of 8 kV, can be interpreted PDEV U0 and PDEV Uo. Nilai PDEV sebesar 8 kV perfasa, dapat diartikan PDEV < U0. Sehingga PDIV > U0 dan PDEV < U0 masuk kategori status kabel cukup buruk dengan Point 2. Status Kabel Terhadap Besar Pelepasan Muatan. Nilai PD max dan PD Level berkisar dibawah 500 pC. Sehingga dapat diartikan besar muatan dibawah atau sama dengan 500 pC, Y < 500 pC atau Y = 500 pC masuk kategori status kabel baik dengan point 1. Jika pont 2 dan point 1 dijumlahkan maka hasilnya poin 3. Poin 3 dapat disimpulkan dengan warna hijau tua. Resiko kegagalan kabel pada segmen TD 09 to PM 4A adalah rendah dan status kabel tersebut cukup baik. Tindak lanjutnya yaitu dalam jangka waktu 12 bulan, segmen ini harus kembali diukur untuk mengetahui kondisi resiko kegagalan kabel.