Claim Missing Document
Check
Articles

Found 3 Documents
Search

ANALISIS PENGARUH PANJANG SUDU TERHADAP UNJUK KERJA TURBIN ANGIN ATAP RUMAH PADA KECEPATAN ANGIN RENDAH Mujiburrahman ,; Heri Irawan
AL-JAZARI JOURNAL SCIENTIFIC OF MECHANICAL ENGINEERING Volume 4, Nomor 1, Mei 2019
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al Banjari

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (907.822 KB) | DOI: 10.31602/al-jazari.v4i1.1967

Abstract

Mengingat potensi angin di Banjarmasin tergolong rendah, hasil pengukuran kecepatan angin secara langsung menggunakan anemometer dengan durasi rata – rata perjam yang ada di puncak kemiringan atap berkisar antara 2 m/s sampai 6 m/s. Dengan demikian di butuhkan sebuah sistem konversi angin yang yang optimal pada kecepatan angin rendah di kemiringan atap. Atas dasar pertimbangan peneliti sebelumnya maka turbin atap rumah dalam penelitian ini menggunakan Airfoil savonius karena memiliki self-starting torsi yang baik untuk kecepatan angin yang rendah sehingga memiliki performansi yang baik apabila di aplikasikan pada turbin angin atap rumah. Mungkin yang menjadi pertanyaan adalah seberapa efektif turbin angin yang di aplikasikan pada atap rumah, untuk itu pentingnya sebuah eksprimen pengujian dengan membuat model uji turbin atap rumah yang di simulasikan pada wind tunnel untuk mendapatkan parameter desain optimal sebagai rekomendasi mengembangan turbin atap rumah skala besar. Penelitian ini menggunakan metode penelitian eksperimental (experimental research) yaitu melakukan pengamatan dan pengukuran kecepatan angin di kemiringan atap dengan durasi rata-rata perjam, perhari, dan perbulan menggunakan alat ukur anemometer digital.  Selanjutnya data tersebut dijadikan sebagai parameter awal dalam menentukan variasi kecepatan angin dalam pengujian model eksprimen pada terowongan angin sederhana dengan varibel kecepatan angin kemiringan atap dan panjang turbin terhadap unjuk kerja turbin atap rumah hasil pengujian. Hasil pengujian pada kecepatan angin 2 m/s turbin atap rumah yang memberikan pengaruh paling besar di hasilkan oleh panjang 0,25 m, dengan nilai putaran sebesar 257,1 rpm. Hasil pengujian pada kecepatan angin 3 m/s turbin atap rumah yang memberikan pengaruh paling besar di hasilkan oleh panjang 0,30 m, dengan nilai putaran sebesar 202,4 rpm. Hasil pengujian pada kecepatan angin 5 m/s turbin atap rumah yang memberikan pengaruh paling besar di hasilkan oleh panjang 0,25 m, dengan nilai putaran sebesar 295,6 rpm.
PENGOLAHAN AIR DI DESA KARANG BUAH KECAMATAN BELAWANG KABUPATEN BARITO KUALA Muhammad Firman; Muhammad Irfansyah; Heri Irawan; Muhammad Suprapto; Saifullah Arief
JURNAL PENGABDIAN AL-IKHLAS UNIVERSITAS ISLAM KALIMANTAN MUHAMMAD ARSYAD AL BANJARY Vol 3, No 2 (2018): AL-IKHLAS JURNAL PENGABDIAN
Publisher : Universitas Islam kalimantan MAB

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (230.241 KB) | DOI: 10.31602/jpai.v3i2.1262

Abstract

Interest Service to the public about solar power plants (PLTS) so that the public understands and knows solar power plant (SPP), increase public understanding of the importance of solar power plants (PLTS) that, while the benefits to be achieved in this activity is to society its target skills and knowledge in assembly and maintenance of a series of solar power plants (PLTS) so that when applied mistakes. Establishment of cooperation between the community, the village government and Studies Program Faculty of Engineering Uniska. As for Tim will add to the experience in training activities assembly and maintenance of solar power plants.The method will be used to achieve the goals that have been implemented are: using the training methods of assembly and maintenance of solar power plants directly with solar panels example demonstrated by the team. So with this training method is expected the participants enthusiastically followed and training materials will absorb well.From the results of the training can be concluded among other things during the training process to be followed can be absorbed 100% or all the participants, 20% of participants who attended or 3 people who want to use solar power for the consumption of their homes by asking what the price of a set of solar power until ready to use and implementation of devotion that will come can be developed into other areas in the vicinity of this devotion, of course, with a bigger budget so that citizens who join the training could be more.
DESAIN ULANG INSTALASI PERPIPAAN PADA MESJID NOOR BANJARMASIN Muhammad Firman; Muhammad Irfansyah; Budi Hartadi; Heri Irawan; Mujiburrahman Mujiburrahman
JURNAL PENGABDIAN AL-IKHLAS UNIVERSITAS ISLAM KALIMANTAN MUHAMMAD ARSYAD AL BANJARY Vol 3, No 1 (2017): AL-IKHLAS JURNAL PENGABDIAN
Publisher : Universitas Islam kalimantan MAB

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (192.142 KB) | DOI: 10.31602/jpai.v3i1.925

Abstract

Service aims to assist the pilgrims so that not too long queue when the purification ritual, so that problems that had been faced by the mosque Noor about the uneven distribution of water during ablution can be resolved by means of installing a piping system so that the water supply everyone on water tank or reservoir can be filled and evenly all these divisions reservoir, so that when the full-full of pilgrims could be served all and not so many pilgrims who cannot attend the prayer in congregation. The main target of this activity is the management of the mosque and the mosque, because they always get complaints and direct censure of pilgrims due to uneven supply of water during ablution, so they need to know how to properly install piping system.The method used to achieve the objectives that have been implemented are: to perform the installation of the channel that goes into reservoirs and channels out of the reservoir so that the distribution of water for ablution can be evenly and flowed perfectly.From the results of this activity all the reservoir can get a direct supply from the pump or other sources, the supply of water for ablution can run smoothly is that during these 14 taps of 43 taps for ablution place of men who do not get water supply now is 100% get water or completely get water supply, in the place of ablution women there are six taps that do not get water from 17 taps installed there now entirely get water supply, as well as the bathroom which amounted to 14 taps, as well as urinal male 8 taps obtain equitable water supply. Djuhur prayers and implementation are now only approximately 1 shap or 40 worshipers who pray it too late due to the late arrival of pilgrims.