Budi Raharjo
Jurusan Teknik Elektro, Fakultas Teknik,Universitas Sultan Ageng Tirtayasa

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

STUDI POTENSI LAHAN DAN AREA PERUMAHAN UNTUK IMPLEMENTASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) DI WILAYAH SERANG DAN CILEGON BANTEN Suhendar Suhendar; Budi Raharjo; Alimuddin Alimuddin; Hady Sutjipto
Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering) Vol 3 No 1 (2016): Jurnal Ecotipe, April 2016
Publisher : Jurusan Teknik Elektro, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/ecotipe.v3i1.26

Abstract

Electrical energy requirements increase as population growth and technological development. Increased triggered also by the rate of energy demand growth of 6.86% annually. Energy needs largely derived from non-renewable energy which has its limitations and is not environmentally friendly. Therefore we need a renewable energy alternative and environmentally friendly. One such alternative is the use of solar energy as a power plant that was converted by solar panels. To do with it, this study aims to determine the potential for, contributions and aspects of the cost of solar energy as a power plant in a residential neighborhood Serang Cilegon. The results showed that the development and implementation of SPP in an open area can generate a total capacity 84971.481 kWp. The greatest potential in the residential Highland Park with a capacity of 50370.802 kWp that have an energy conversion amounted to 36,707,706 kWh / year. While the supply of energy 33750047 kWh / year will be able to contribute to meet all the needs of the household burden. While in Pondok Cilegon Indah residential area with a capacity of 123.032 kWp with a conversion of energy 98387 kWh / year. Energy supply 90 452 kWh / year to contribute 0.76% of the burden of households. PLTS investment with life project for 25 years for a return on investment costs takes as long as 25 years and 1 month as of the beginning of the project so as not feasible investment.