Muhammad Ali Raja Siregar
Jurusan Teknik Elektro Fakultas Teknik, Universitas Bangka Belitung

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PERENCANAAN SISTEM HYBRID PHOTOVOLTAIC DAN PLN DI UNIVERSITAS BANGKA BELITUNG Muhammad Ali Raja Siregar; Wahri Sunanda; Ghiri Basuki Putra
Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering) Vol 6 No 2 (2019): Jurnal Ecotipe, Oktober 2019
Publisher : Jurusan Teknik Elektro, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/ecotipe.v6i2.1082

Abstract

Electricity at Universitas Bangka Belitung is currently supplied by the Bangka Belitung Region PLN with a power supply of 690 kVA to meet electrical energy needs. This study analyzes the hybrid photovoltaic-PLN pattern in UBB to find out more economical systems. The calculation result of the more economical hybrid pattern is the pattern with the distribution of PLN's load of 70% -30% PLTS which results in a Net Present Cost (NPC) value of US $ 1,071 M and a Cost Of Energy (COE) of US $ 0.107.