Implementasi Metode Person In Charge (PIC) dan Monitoring Analisis Kurva– S untuk Percepatan Pengadaan Barang dan Jasa Pembangunan Kabel Laut 150 KV Landing Point Batulicin Kalimantan Selatan mikky noperina citra; Dhami Johar Dhamiri
Energi & Kelistrikan Vol 12 No 1 (2020): Energi dan Kelistrikan: Jurnal Ilmiah
Publisher : Sekolah Tinggi Teknik PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (709.011 KB) | DOI: 10.33322/energi.v12i1.961

Abstract

ABSTRACT Achievement of the performance of the 2017 contract target of PT PLN (Persero) Central Kalimantan UIP, namely 54 contracted procurement packages and in 2018 there were 57 procurement targets with a temporary budget ceiling of Rp. 1,501,933,269,600.00. So as to achieve the 2018 contracted procurement target it will have an impact on the achievement of the 2019 Commercial Operation Date (COD) efforts needed to accelerate the implementation of goods and services. One of the basic knowledge (common knowledge) for acceleration in a knowledge management construction starts from adding three elements, including: labor, equipment, and overtime / overtime. After a Root Cause Problem Solver (RCPS) and priority scale selection process are carried out, two priority Problem Solving results have never been implemented as an effort to accelerate implementation, namely Parallel Work with Person In Charge (PIC) Method and Monitoring of Procurement Implementation Schedules with S-Curve Analysis . Keywords:Contracted, Person In Charge (PIC), Package, IDR (Rupiah).
Pengaruh Kontaminan Air terhadap Tegangan Tembus Isolasi Cair Minyak Mineral dan Nabati sebagai Alternatif Isolasi Minyak Transformator Christiono; Miftahul Fikri; Dhami Johar Damiri; Muh. Rezha Safariansyah; Syahty Pratiwi; M. Reza Hidayat
Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik Vol 21 No 1 (2022): Jurnal Teknik - Media Pengembangan Ilmu dan Aplikasi Teknik
Publisher : Fakultas Teknik - Universitas Jenderal Achmad Yani

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

One of the effects of reduced transformer life is the frequent occurrence of disturbances, disturbances that can occur in the form of contamination of insulating oil which has an impact on transformer damage. To reduce the damage, a research was carried out, in this study it was carried out to see the effect of water contaminants contained in the insulation of transformer oil using the Breakdown Voltage method by looking at the value of the translucent voltage. There are 2 types of insulating oil used during testing, mineral, and vegetable oil, while the test equipment used is the BAUR Oil Tester DPA, with the standard IEC 60156:2018 test equipment. Which is adapted to the standard specification SPLN 49-1:1982 which states that new oil has a breakdown voltage value of 30 kV/2.5 mm. The results of the test show that the breakdown voltage value is influenced by water contaminants where the more contaminants contained, the faster the breakdown voltage value will decrease. This research can be an indication to maintain the transformer resistance.
Pemasangan Lampu Jalan Berbasis Solar Cell untuk Penerangan Jalan di Desa Cilatak Ciomas Septianissa Azzahra; Christiono Christiono; Samsurizal Samsurizal; Miftahul Fikri; Titi Ratnasari; Rizki Pratama Putra; Dhami Johar Damiri
Terang Vol 1 No 2 (2019): TERANG : Jurnal Pengabdian Pada Masyarakat Menerangi Negeri
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33322/terang.v1i2.486

Abstract

The negative impact of fossil-fueled plants and the lack of public understanding of renewable energy lies behind the holding of these PKM activities with the aim of educating and at the same time transferring technology that is directly beneficial to the community in the form of solar powered street lighting. From the surveys that have been conducted where there are no available street lighting facilities so that there are some community activities that are difficult to do at night. From this work, there were two important things, among others, that the community gained an understanding of renewable energy and knowledge to efficiently use energy to reduce the environmental impact of the dominant fossil power plant in Indonesia. The second is that with the help of solar-powered street lights, the community is very helpful in carrying out activities at night and creates more secure conditions in the community.
Desain Instalasi Listrik Bangunan Bertingkat (Studi Kasus: Pesantren Khoiru Ummah Sumedang) Ibnu Hajar; Dhami Johar Damiri; Yuliasyah Yuliasyah; Jumiati Jumiati; M. Syair Pandu Lesmana; Muhammad Iqbal Romadhoni
Terang Vol 3 No 1 (2020): TERANG : Jurnal Pengabdian Pada Masyarakat Menerangi Negeri
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33322/terang.v3i1.1073

Abstract

The electrical installation is a circuit of electrical equipment which is interconnected with one another and it is within the scope of the electrical power system. This article is to present the result of social community service (PkM) activity at Boarding School of STP SMP/SMA KU Sumedang, that shows an electrical installation design of multi-storey building. In construction of multi-storey building of this boarding school, they do not have an electrical installation design. So, the design in this article is to provide design drawings of the electrical installation, so it could be guidance of setting up of electrical installation for the new boarding school building. So that, they got the electrical installation safely for human and the equipment, as well reliable and comfort during using electricity. The design drawings that resulted from the social community service are drawings of front look, beside look, wiring, and single line diagram (SLD). Also, resulted total power calculation, protection, and capacity (rating) of MCB, and calculated cable rating (KHA), choosing type and cross-sectional area of cables that will be used in electrical installation design for the boarding school building.
Design and Simulation of On-Grid Rooftop Solar Power Plant (Rooftop PV) System on Office Buildings with a PLN Grid System DHAMI JOHAR DAMIRI; ROBERTUS RICHARD LAKSANA LAMANIA
Jurnal Elkomika Vol 11, No 1 (2023): ELKOMIKA: Jurnal Teknik Energi Elektrik, Teknik Telekomunikasi, & Teknik Elektr
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/elkomika.v11i1.231

Abstract

ABSTRAKEnergi Terbarukan memiliki peranan penting didalam pengembangan energi di Indonesia. Salah satu Penggunaan Energi terbarukan yang dapat diterapkan adalah energi matahari dari PhotoVoltaic (PV). Penggunaan PV di atap dengan kondisi terhubung jaringan ke sistem disebut Sistem PLTS Atap On Grid. Penelitian ini merencanakan pemasangan Sistem PLTS On Grid di Gedung Perkantoran PT.PLN UP3 Samarinda. Dari perancangan yang telah dilakukan dengan luas area atap sebesar 919,18 m2 menghasilkan 124,640 Kwp berdasrkan simulasi helioscope. Sementara itu didapat GHI (Global Horizontal Irridiance) sebesar 126.51 KWh/m2/yr, energi produksi 144.119 KWh/yr dan Performa Ratio yang dihasilkan sebesar 77.4 %. Peralatan ALL-TEST PRO On-Line II menghasilkan data beban pada Gedung Perkantoran. Simulasi HOMER menghasilkan Sistem PLTS Atap On Grid dan SIstem PLN sebesar 181,718 KWh (55.8%) dan 144.119 KWh (44.2%). Meter EXIM digunakan sebagai impor ekspor energi didalam Sistem.Kata kunci: Energi Terbarukan, Sistem PLTS Atap On Grid, Meter EXIM ABSTRACTRenewable energy is essential in developing energy use in Indonesia. One applicable renewable energy uses solar energy from PhotoVoltaic (PV). Rooftop PV with a network-connected condition to the system is called the On-Grid Rooftop solar power plant System. This research install the On-Grid Rooftop PV System in the office building of PT. PLN UP3 Samarinda. The design that has been prepared with a roof area of 919.18 m2 simulates that it will produce 124,640 KWp based on helioscope simulation. Meanwhile, the GHI (Global Horizontal Irradiance) is 126.51 KWh/m2/yr, with energy production of 144,119 KWh/yr and the Performance Ratio is 77.4%. The ALL-TEST PRO On-Line II Equipment generates a load on the Office Building. With the HOMER simulation, the On-Grid Rooftop solar PV System and the PLN System distribution is 181,718 KWh (55.8%) and 144,119 KWh (44.2%). An EXIM Meter is needed as an energy export import inside System.Keywords: Renewable Energy, System PLTS Rooftop On Grid, Meter EXIM
Technical Performance and Economic Feasibility Simulation of 200kWP Rooftop Solar Photovoltaic On grid on Industrial Estate Factory Building with Helioscope Software Dhami Johar Damiri; Achmad Aditya Nugraha
Jurnal Rekayasa Elektrika Vol 17, No 2 (2021)
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1158.615 KB) | DOI: 10.17529/jre.v17i2.19578

Abstract

Renewable energy resources are currently being developed in Indonesia. The government is also targeting renewable energy mix of 23% to be achieved in 2025. Solar Photovoltaic Generation System is one of a form of renewable energy that is currently being developed in Indonesia. Several industrial estates in Indonesia are filled with factories with fairly large buildings and have great potential for the development of Rooftop Solar Photovoltaic with the advantage of reducing land investment costs and of course without reducing the functionality of factory operational. The purpose of this research is to simulate the technical and economic performance of Solar Photovoltaic on grid 200kWP installed on the roof of a factory building using Helioscope software in an industrial estate area in West Java. The simulation results show that the average value for Global Horizontal Irradiance (GHI) is 138.2 kWh/m2, Electrical Energy Production is 21,977 kWh, and the Performance Ratio (PR) in one year is 78.06. Meanwhile, the total annual Electrical Energy Production is 263,723.6 kWh. The total investment value of the Rooftop Solar Photovoltaic on Grid system in this factory building is Rp. 2,457,850,800. Based on the economic feasibility study made, it can be concluded that the Rooftop Solar Photovoltaic on Grid system with a power of 200 kWP in the factory building is economically feasible as long as the interest rate is less than 12.71% (Internal Rate of Return/ IRR).
Penerapan Metode Kendali Aliran Sebagai Upaya Pelestarian Sumber Daya Air Di Pondok Pesantren Nurul Haramain Ibnu Hajar; I Made Indradjaja Marcus Brunner; Dhami Johar Damiri; Martin Choirul Fatah; Yuliansyah Yuliansyah; Jumiati Jumiati
Terang Vol 5 No 2 (2023): TERANG : Jurnal Pengabdian Pada Masyarakat Menerangi Negeri
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33322/terang.v5i2.1760

Abstract

Environmental damage can be caused by an imbalance of the earth’ constituent elements, which one of the elements is scarcity of clean water in the earth. Dearth of clean water is predicted that will be experienced more than a half of word population of nine million of human being in 2050. The phenomenon of the scarcity of the clean water has been occurred especially in Indonesia that it is a country which has six percent of the potential of the clean water, but in fact it shows the need of the clean water of Indonesia population are still not enough. The dearth of the clean water needs to get serious attention from all stake holder, included people in the boarding school. An effort to decrease the scarcity of the clean water rate is by behaving frugally in using the clean water. To do that need to do socialization massively to the people and it require a long time. Therefore, beside the socialization massively, engineering to decrease the flow rate in using the clean water through the valves that is by applicating flow control method. This simple technology of flow control application, the community service team and Nurul Haramain boarding school located in Kampung Saitem, Ciburayut, Cigombong, Bogor, West Java are collaborated. A measurement result of flow rate before the flow restrictor is applicated in the valve is 7.76 liter/minute and after applicated decrease to 1.13 litter/minute. Percentage of decreasing is to reach 83 percent.
Technical Performance and Economic Feasibility Simulation of 200kWP Rooftop Solar Photovoltaic On grid on Industrial Estate Factory Building with Helioscope Software Dhami Johar Damiri; Achmad Aditya Nugraha
Jurnal Rekayasa Elektrika Vol 17, No 2 (2021)
Publisher : Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17529/jre.v17i2.19578

Abstract

Renewable energy resources are currently being developed in Indonesia. The government is also targeting renewable energy mix of 23% to be achieved in 2025. Solar Photovoltaic Generation System is one of a form of renewable energy that is currently being developed in Indonesia. Several industrial estates in Indonesia are filled with factories with fairly large buildings and have great potential for the development of Rooftop Solar Photovoltaic with the advantage of reducing land investment costs and of course without reducing the functionality of factory operational. The purpose of this research is to simulate the technical and economic performance of Solar Photovoltaic on grid 200kWP installed on the roof of a factory building using Helioscope software in an industrial estate area in West Java. The simulation results show that the average value for Global Horizontal Irradiance (GHI) is 138.2 kWh/m2, Electrical Energy Production is 21,977 kWh, and the Performance Ratio (PR) in one year is 78.06. Meanwhile, the total annual Electrical Energy Production is 263,723.6 kWh. The total investment value of the Rooftop Solar Photovoltaic on Grid system in this factory building is Rp. 2,457,850,800. Based on the economic feasibility study made, it can be concluded that the Rooftop Solar Photovoltaic on Grid system with a power of 200 kWP in the factory building is economically feasible as long as the interest rate is less than 12.71% (Internal Rate of Return/ IRR).
Microgrid Design in Electricity Supply in Paper Factories Arief Pratomo Sitompul; Dhami Johar Damiri
International Journal of Social Service and Research Vol. 3 No. 8 (2023): International Journal of Social Service and Research (IJSSR)
Publisher : Ridwan Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/ijssr.v3i8.475

Abstract

Renewable energy is growing, one of which is by controlling solar energy. A solar power plant (PLTS) is a power generation system that utilizes solar energy to become electrical energy through photovoltaic modules, which are included in environmentally friendly energy so that it becomes a renewable, effective, more efficient, and reliable plant. The research designing the modeling of PLTS on a grid was carried out on the roof of a gas power plant (PLTG) which generated 164.47 MWh / year. Analyzing modeling in the addition of the Rooftop Solar System that enters the network can reduce exhaust emissions from the use of other equipment for four years with an average of PLN by 99.29%, PLTG #1 by 99.06 and PLTG #2 by 99.11%. The impact of the addition of the PLTS Rooftop on the quality of power entering the 3.3 kV network system is seen that the feeder 2-panel bus has improved to 97.82% of the voltage drop of 72.67% in line with the PLN 3 panel, the improvement is made by providing capacitors of 3x4Mvar. Feeder 3 improved to 97.61% of the voltage drop of 78.87%, in line with the PLN 4 panel. The improvement was carried out by providing a capacitor of 2x4Mvar. Panel feeder four was seen to have improved to 99.21% from an excess voltage of 109.23% in line with the generating equipment, and the improvement was made by reducing capacitors by 0.1 Mvar from the used 5x0.1 Mvar.