p-Index From 2019 - 2024
0.882
P-Index
This Author published in this journals
All Journal Wahana Teknik
Claim Missing Document
Check
Articles

Found 7 Documents
Search
Journal : Wahana Teknik

PERENCANAAN DESAIN STRUKTUR PONDASI PADA RUMAH TINGGAL TYPE MEZZO 54 / 84 DI PERUMAHAN BELLA CASSA VILLAGE DAHANREJO GRESIK Akhmad Andi Saputra; Achmad Fatchul Arif
Wahana Teknik Vol 6 No 2 (2017): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (281.036 KB)

Abstract

Penelitian ini bertujuan untuk mengetahui perancangan segmen pondasi (pembebanan dari dinding, atap) rumah sederhana tumbuh 1 lantai type 54/84; bentuk sambungan (joint) antar segmen dapat saling mengunci baik antar segmen sejenis maupun dengan segmen lain sehingga menjadi satu sistem struktur bangunan rumah tinggal sederhana tumbuh di Perumahan Bella Cassa Village; digunakannya hasil dari perencanaan segmen pondasi dapat diaplikasikan ke dalam perencanaan dan perancangan rumah tinggal sederhana tumbuh; metode pelaksanaan dapat digunakan dalam pembangunan rumah tinggal sederhana di Perumahan Bella Cassa Village yang menggunakan komponenMetode untuk perencanaan dan perancangan dalam penelitian ini yaitu dengan melakukan kajian dan coba-coba (trial and error) dengan berbagai alternatif dari berbagai sumber yang ada kemudian disimulasikan berupa gambar percobaan, dan dianalisis mengenai kekurangan dan kelebihan dari produk tersebut sampai didapatkan segmen yang optimal baik dalam bentuk maupun ukuran. Data yang digunakan dalam penelitian ini tentang inovasi pengembangan tentang perumahan di Indonesia, data tentang alternatif penggunaan bahan dan material dalam bangunan, data mengenai konsep pembangunan rumah secara bertahap. Sumber data diperoleh dari buku, literatur penunjang, media internet, dan pengamatan langsung mengenai kondisi perumahan. Proses analisis data dengan mengidentifikasi masalah yang ada, mengelompokkan, dan mengkaitkan antara masalah dalam tahapan-tahapan, kemudian menganalisa masalah dan mengambil suatu kesimpulan yang dapat ditransformasikan dalam konsep perencanaan dan perancangan di Perumahan Bella Cassa Village.Hasil yang dapat disimpulkan dari kegiatan perencanaan dan perancangan ini yaitu sebagai berikut: 1) bentuk balok persegi panjang dan dimensi 15 cm x 15 cm, dengan variasi panjang untuk segmen sloof, dan balok 45 cm, 60 cm, dan 90 cm, kolom 35, 60 cm dan 90 cm, menggunakan segmen balok yang ditambahkan dengan segmen spesial (dengan ukuran tertentu) pada sebagai penutup, dan dinding dengan tebal 12 cm, tinggi 30 cm, dan 45 cm dengan variasi panjang 15 cm, 30 cm, 45 cm, dan 60 cm.  2) sambungan menggunakan prinsip jantan dan betina (tounge and groove). 3) Beton K 225 digunakan pada dinding dengan tulangan berdiameter 12 mm, begel 6 mm dan  tegangan leleh 2400 kg/cm2. 4) Metode pelaksanaan menggunakan perakitan sesuai dengan skema urutan pekerjaan yang telah ditentukan.Kata kunci: perencanaan, desain, struktur, pondasi, perumahan
ANALISIS EFISIENSI WAKTU PELAKSANAAN PROYEK PEMBANGUNAN RUMAH DINAS KARYAWAN RS. IBNU SINA GRESIK MENGGUNAKAN METODE CPM Dandy Nugroho; Akhmad Andi Saputra; Ervina Selawatin Kurdi
Wahana Teknik Vol 7 No 2 (2018): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam suatu kondisi pemilik proyek menginginkan proyek selesai lebih awal dari rencana semula dikarenakan rumah dinas tersebut akan segera ditempati oleh karyawan RS. Ibnu Sina sebelum pergantian tahun 2018, akan tetapi terdapat keterlambatan pekerjaan, Oleh karena itu diperlukan analisis penjadwalan proyek sehingga dapat diketahui berapa durasi percepatan yang dapat dilakukan agar proyek tersebut dapat diselesaikan tepat waktu. Penelitian ini menggunakan metode CPM (Critical Path Method), percepatan durasi kegiatan hanya dilaksanakan pada pekerjaan yang kritis saja dengan target waktu penyelesaian sesuai kontrak awal pekerjaan. Berdasarkan hasil analisis penjadwalan ulang (rescheduling) dengan metode CPM (Critical Path Method) dihasilkan kesimpulan bahwa waktu yang dapat dipercepat ialah 25 hari kalender dengan durasi total pelaksanaan 66 hari kalender. sedangkan apabila tidak dikendalikan maka waktu penyelesaian sebesar 91 hari kalender. Kata kunci: CPM, percepatan, reschedulling
Pengaruh Campuran Abu Sekam Padi Terhadap Kualitas Bata Merah di Desa Tegalombo, Kecamatan Dukuhseti, Kabupaten Pati Dandy Nugroho; Akhmad Andi Saputra; Kuswoyo Kuswoyo
Wahana Teknik Vol 8 No 2 (2019): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan untuk mengetahui pengaruh komposisi terbaik abu sekam padi terhadap pandangan luar, porositas, susut bakar, kadar garam, daya serap air dan kuat tekan batu bata merah.Metode penelitian ini dilakukan dengan penambahan abu sekam dengan komposisi 5%, 10% dan 15% dengan pencampuran tanah liat dari persawahan. Hasil campuran tanah liat, abu sekam padi dan air dicetak dan dikeringkan secara alami selama 2 hari 1 malam, dan dilanjutkan pembakaran selama 3 x 24 jam. Pengujian dilakukan sesuai SNI 15-2094-2000 tentang bata merah.Hasil penelitian dengan campuran komposisi 5%, 10% dan 15 dapat menunjukkan perubahan dari segi pandangan luar, porositas, susut bakar, daya serap, dan kuat tekan batu bata. Pada komposisi 15%, dari segi pandangan luar terjadi keretakan 8%, dan daya serap air sebesar 20,2% yang melebihi dari standart SNI 15-2094-2000. Pada penelitian kuat tekan dari ketiga sampel dengan komposisi 5%, 10%, dan 15% dengan hasil 2,08%, 1,80%, dan 1,68% menyimpulkan tidak sesuai dengan SNI 15-2094-2000. Dari keseluruhan penelitian ini didapatkan komposisi terbaik untuk campuran abu sekam padi ialah pada komposisi 5%-10%.Kata Kunci: Batu Bata, Abu Sekam Padi, Visual, Susut Bakar, Porositas, Kadar Garam, Daya Serap Air, Kuat Tekan
Perencanaan Perkerasan Lentur Jalan Raya Dengan Metode Analisis Komponen Bina Marga 1987 (Studi Kasus Ruas Jl. Raya Banjarsari-Cerme Kabupaten Gresik) Dandy Nugroho; Akhmad Andi Saputra; Muchammad Dian Nurdianto
Wahana Teknik Vol 9 No 1 (2020): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Banjarsari Highway is an arterial road in the primary road network system that connects Surabaya, Krian, Sidoarjo, Mojokerto and Lamongan areas. Banjarsari-Cerme Highway uses flexible pavement consisting of basic soil layer, bottom foundation layer, top foundation layer and surface layer. The arrangement of these layers is generally used on roads that have a fairly high volume of traffic. Over time, the number of vehicles passing is increasing and eventually causing road damage in a relatively short period of time. Therefore, it is very important to make road improvements in accordance with the Average Daily Traffic Volume (VLHR) and the composition of passing vehicles. This study will calculate and plan the type of pavement that is feasible according to the age of the planned plan. To supporting this study, several data are needed such as: traffic volume data, rainfall data, CBR data, and secondary data obtained from the Public Works Office and Gresik Regency Transportation Office. From the data obtained, it is then processed and analyzed on the calculation of pavement bending new roads with Bina Marga standards. Planning in this study uses flexible pavement analysis in accordance with the Guidelines for Thick Planning of Pavement Pavement with Component Analysis Method (SKBI-2.3.26.1987) and combined with AASHTO method 1993. The results of this study are: (1) The average daily traffic (LHR) based on the age of the 10-year plan on Banjarsari-Cerme road is 29,418 vehicles per day. (2) The thickness of the planned bending pavement on Banjarsari-Cerme road in Gresik regency based on the analysis method of the 1987 Bina Marga SKBI component of 97.50 cm with the following details: a) Surface layer (surface course) used Laston MS-744 with a thickness of 17.50 cm with details of a wear layer AC-WC 7.50 cm thick and foundation layer AC-BC as thick as 10 cm. b) The base course is used 100% CBR 100% grade with a thickness of 35 cm. c) The bottom foundation layer (subbase course) is used sirtu (class B) CBR 50% with a thickness of 45 cm. Keywords: Average Daily Traffic, Bending Pavement Layer, Component Analysis and AASHTO Method.
Perbandingan Estimasi Anggaran Biaya Antara Harga SNI Dengan Harga Kontraktor Pada Proyek Pembangunan Pagar di Kandangan Surabaya Akhmad Andi Saputra; Dandy Nugroho; Feri Sukmana
Wahana Teknik Vol 9 No 1 (2020): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The implementation of a construction project is a mechanical series of activities or works that are complex, multi-layered and interdependent. Building construction activities in the field of construction, we need a basic means of calculation of Principal Unit Price Analysis (AHSPK). Contractors are more likely to calculate the price of the work unit based on their own analysis based on previous experience in completing a construction work, although it is inseparable from SNI analysis (Indonesian National Standardization). The research method in analyzing the Budget Plan (RAB), namely the SNI and Contractor Calculation Methods. From the calculation of each analysis of the existing budget plan, the results obtained are a comparison of the budget plan between the SNI method with the Contractor Method. A more economical cost budget plan using the Contractor Method is IDR 548,564,455.00 while the results of the analysis of the SNI cost budget plan is IDR 1,151,860,112.11. Keywords: Budget, Comparison, Contractor, Cost, Estimation, Price, SNI.
Analisis Balok dan Kolom Struktur Beton (Studi kasus café di Jl. Manunggal, Desa Gedongombo, Kecamatan Semanding, Kabupaten Tuban) Dandy Nugroho; Akhmad Andi Saputra; Dedi Agung Cahyono
Wahana Teknik Vol 9 No 2 (2020): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Structural design is an important element in the construction of a building in order to produce a strong, safe and economical building. Overall, the building structure consists of two parts, namely the upper structure (in the form of floors, beams, columns, walls and roofs) and the lower structure (in the form of foundations and sloof beams). Columns and beams are the structure of the building frame, therefore it is very important, so that dimensions and use of reinforcement that are safe and economical must be planned. Changing the function of an office building into a café building needs to recalculate the beam and column structure. In the load regulation, the live load value of café buildings is greater than that of office buildings, so it is necessary to recalculate the dimensions of the beam and column structures so that they are able to withstand the existing loads in the cafe building. This study analyzes the beams and columns of concrete structures using a load-bearing frame system with tools from the STAADPro program according to SNI-2847-2013 regarding structural concrete requirements for buildings. The conclusion of this research is that the beam section uses a size of 300 x200mm and the column section uses a size of 300 x 300mm. Column section uses 8 Ø12 bending reinforcement, the support beam uses 2 Ø12 upper reinforcement 3 Ø12 lower reinforcement, field beam uses 7 Ø12 upper reinforcement 4 Ø12. Keywords: Analysis, Beams, Columns, Concrete, Structure.
Analisis Struktur dan Perencanaan Ketahanan Gempa (SNI 1726:2012) Warehouse PT. X di Gresik Akhmad Andi Saputra; Dandy Nugroho; Ahmad Muwafiqudinulhaq
Wahana Teknik Vol 9 No 2 (2020): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Warehouse is a building to store a variety of necessary products for a company, it could be said that warehouse is collection point and starting point of the goods that will be distributed to the retailer or directly to the consumer. In cases that took place at the warehouse in PT.X is a building which had height of 26 meters and span of 25 meters that has earthquake-prone and wind loads. This makes researcher need to do structure analysis and planning of warehouse resilience of PT.X in Gresik.This study uses SNI 1726:2012 for planning earthquake resistance of building and non-building structures. The step of structure analysis of rafters, gordings, beams and columns as follows: 1. Input data into STAAD pro (structure modelling), 2. Control the strength of rafter structures, gordings, beams and columns using the largest external force data based on calculations from STAAD pro.The results of this study are: 1. The structural resistance to combined loads according to SNI 1726:2012 shows an indication of the inability of the steel profile on the H 350 x 175 rafter and on the H 250 x 125 beam with the actual value of the allowable ratio more than 1.00, 2. The rafter profile is replaced with I 450 x 175 x 11 profile which has a ratio value of 0.7818 and the beam profile is replaced with H 250 x 250 x 9 x 14 which has a ratio value of 0.1996, both steel profiles have indicated pass result. Keywords: Analysis, STAAD Pro, Steel, Structure.