Claim Missing Document
Check
Articles

Found 2 Documents
Search

Peningkatan Pengetahuan Pencegahan Covid-19 Masyarakat Kampung Cimasuk Kidul Athaya Zhafirah; Gariballah Syarief; Rinrin Siti Ratna Purinur; Rafiqan Moch. Ghilman; Ruly Frans Albar; Maris Bakti Fauzi
Jurnal PkM MIFTEK Vol 1 No 2 (2020): Jurnal PkM MIFTEK
Publisher : Institut Teknologi Garut

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1594.704 KB) | DOI: 10.33364/miftek/v.1-2.73

Abstract

Fasilitas umum pencegahan Covid-19 yang diberikan oleh pemerintah desa di Kampung Cimasuk Kidul Kabupaten Garut sudah ada, seperti tempat cuci tangan dan alat penyemprot desinfektan. Namun, masyarakat Kampung Cimasuk Kidul masih tidak dapat menggunakan fasilitas tersebut dengan baik dan masih abai terhadap protokol kesehatan. Hal tersebut dikarenakan kesadaran dan pengetahuan masyarakat Kampung Cimasuk Kidul yang masih kurang. Kegiatan Kuliah Kerja Nyata Tematik Pencegahan Covid-19 Sekolah Tinggi Teknologi Garut dilakukan untuk meningkatkan pengetahuan serta kesadaran masyarakat Kampung Cimasuk Kidul dalam pencegahan Covid-19. Metode yang digunakan yaitu identifikasi awal, pemaparan edukasi secara daring dan luring, peningkatan kapasitas, serta kegiatan kemanusiaan. Hasil dari penyelesaian masalah di Kampung Cimasuk Kidul adalah tersalurkan 120 masker, terpasang spanduk informasi pencegahan Covid-19, penyemprotan desinfektan, penambahan fasilitas tempat cuci tangan, dan terpasang 2 buah penyanitasi tangan. Kegiatan Kuliah Kerja Nyata berhasil meningkatkan pengetahuan serta kapasitas masyarakat Kampung Cimasuk Kidul dalam pencegahan Covid-19.
Evaluasi Kinerja Manajemen Konstruksi Proyek Pembangunan Kantor Dinas Kesehatan Ruly Frans Albar; Ganjar Jojon Johari
Jurnal Konstruksi Vol 21 No 2 (2023): Jurnal Konstruksi
Publisher : Institut Teknologi Garut

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33364/konstruksi/v.21-2.1409

Abstract

Construction Management can be in the form of a business entity in which human resources are needed who are experts in their respective fields which include POAC (Planning/Planning, Organizing/Organizing, Actuating/Implementing, and Controlling/Supervision). The Garut District Health Office Development Project was built to improve the quality of the office and improve the quality of public services. In the implementation of a project, of course it cannot be avoided from various problems that slowly arise. This is a serious challenge, how will the construction management itself try to solve various problems that occur so that it can proceed according to the initial plan. This study aims to find out what factors influence the performance of construction management in and to find out the actions taken to overcome the problems that occur so that the implementation of construction management can run well. The method used in this research is ranking analysis method. This study involved consultants and contractors to fill out a questionnaire. There are 30 respondents in this study. The results of this study are that the factors that influence the construction management work system are mostly in the supervision or controlling process, which obtains an average value of 3.56. To control the factors that affect the construction management work system in the control process, you can analyze the constraints that occur in the field and then catch up on delays in progress that occur quickly and precisely.